Post Job Free

Resume

Sign in

Project Construction

Location:
Port Richey, FL
Posted:
February 20, 2015

Contact this candidate

Resume:

Phone: 407-***-**** Andy Porch

email: acoedh@r.postjobfree.com

**** ***** ******* *****

Beverly Hills Florida 34465

Summary

Sales position to reach earning potential

that is mutually beneficial to me and the Company

Experience

Practicing Farrier/Blacksmith 2010 - Current

Ohio/FL

Kentucky Horseshoeing School (Richmond Kentucky) July 5 2011 - September

30 2011

Skills Acquired

o Equine Anatomy

o Equine animal handling

o Cadaver dissection of equine limbs to understand ligaments and tendons

and function of hoof capsule

o Proper trimming to assure symmetry and balance

o Blacksmithing practices for shaping and making shoes

o Forge welding/gas welding/stick welder

o Licensed racetrack thoroughbred Farrier

CPM Technologies, Inc.

Orlando, FL

General Contractor and Construction Manager (Orange County Public Schools)

June 2003 - December 2010

o General Contractor and construction management from Design, GMP

negotiation, thru construction and project closeout

o Renovating existing schools for life safety work and building code

compliance projects up to 200k

o Renovation life safety projects using RS Means cost estimating software

for projects less than 50k

o Providing Construction Management services limit to one million dollars

per project

o Performed site visits on behalf of client to meet A/E to discuss

feasibility analysis prior to proposal

o Drawing review for 30%, 60%, 90% and 100% drawings prior to subcontractor

bidding for CM contract

o Hiring specialty subcontractors to perform work in existing campuses ie

track & field construction and union steel workers

o Conducting weekly jobsite progress meetings to address any owner concerns

or change in scope

o Supporting school staff while working with administration to ensure

timely completion of work while providing

safe, productive, and efficient work site.

General Mechanical Corporation

Daytona Beach, FL

Project Manager (Civil, Marine, and Architectural Construction)

January 13, 2003 - June 12, 2003

o Build Baseline Project schedule in Primavera and provide two week look

ahead for owners meeting

o Process change orders and shop drawings, A/E submittals

o Review monthly pay estimates and quantity log tracking

o Conduct owners meeting with Architect and field personnel

o Write all subcontracts, purchase orders, sublets, and addendums

o Supervise four Superintendents

Martin K. Eby Construction Company, Inc.

Ocala, FL

Project Engineer/Area Superintendent (Civil Construction)

May 2, 2002 - December 15, 2002

o Develop Budget in JD Edwards for project cost accounting

o Build Project schedule in Primavera and provide two week look ahead for

owners meeting

o Process change orders and shop drawings

o Review monthly FDOT pay estimates and quantity tracking

o Field duties include supervision of pipe, excavation, survey, and roadway

construction personnel

o Conduct owners meeting with FDOT

o Maintain project point file system for all incoming, outgoing, and

submittal information

o Write all subcontracts, purchase orders, sublets, and addendums

o Supervise Office staff, and field engineers

Siemens Power Generation

Orlando, FL

Senior Project Controls Engineer (Consultant Position)

June 4, 2001 - May 1, 2002

o Lead engineer to manage all disciplines related to engine construction

o Customer meetings to analyze engineering requirements to set up project

plan

o Coordinate and manage engineering models and drawings for all

disciplines

o Defining project control processes for Turbine and Generator engineering

disciplines

o Building logic in Primavera 3.0 and exporting Primavera project plans

into P3e Oracle database

o Building Primavera 3.0 and P3e engineering schedules for 501F, 501D,

501G, and V84.3A turbine and generator models

o Project Control process from engineering kickoff to define project

baseline schedule in P3e Oracle database

EnterSource, Inc. (AWS AT&T Wireless Seattle WA))(Lucent Technologies

Dallas TX)

Senior Program Consultant & Scheduler (P3e Implementation) Consultant

Position

September 25. 2000 - June 1, 2001

o Assess the scope of work and clients needs relevant to P3e implementation

o Develop a Master IT Phases I, II, and III project plan to baseline P3e

Oracle database Implementation

o Define the configuration of database and software installation

o Defining processes to support rollout of cellular site and retrofit

construction

o Oracle DBA to create links to P3e once the project plan is complete

o Coaching and training of AWS staff for project management software and

CPM principles, EPS and OBS

o Defining and building project templates for baseline project schedules

o Installation and implementation of Portfolio Analyst, Methodology

manager, Primavision, Progress reporter

Parsons Brinckerhoff Construction Services, Inc.

Sanford, FL

Project Controls Manager

Program Management for Turnpike district building Seminole 2 Expressway

alignment in excess of $100 million

January 4. 2000 - September 24. 2000

o Conduct field reviews and analysis of Contractor work including pile

driving analysis and set checks for test pile program

o Review application for payment by Contractor and CE&I personnel

including all contract pay items

o Review and analyze value engineering change proposals

o Critical path analysis, cost loading review, earned value, WBS, and

baseline network logic review relating to construction

o Develop and maintain Primavera 3.0 two thousand activity master schedule

for all project sections and perform schedule updates

o Maintenance of construction management information reporting systems

o Claims analysis utilizing CPM tools and Primavera

PBS&J Construction Services, Inc.

Casselberry, FL

Senior Estimator/Scheduler

October 5. 1998 - January 3. 2000

o Estimating and Scheduling FDOT construction projects (Phase Estimates)

Turnpike, District Three, and National Park Service

o Conceptual and hard dollar estimating for architectural, civil, water

and sewer treatment construction projects

o Conduct field reviews and cost estimates for lending institutions

o Master schedule review and reporting for Sunpass electronic toll

collection system for FDOT roadway projects

o Developing and maintaining detailed construction and design schedules

utilizing Primavera, Microsoft Project, and Suretrak

o Build and maintain Primavera 3.0 2000 thousand activity schedule for

civil infrastructure for Walt Disney Celebration development

o Perform constructability reviews during design phases (30%, 60%, 90%, and

100% plan reviews)

o Powerpoint presentations for CE&I proposals, and additional construction

target markets

Professional & Software Certifications

o Florida State Certified General Contractor (CGC1506560)

o Primavera Suretrak

( Primavera Project Planner 3.0 (Certified)

o Microsoft Project (Certified)

o Primavera Project Planner (P3E) (Certified)

o American Farriers Association Member