SEVIGNE CASTOR
***** ** *** ****. ******** Pines, FL. 305-***-****.
acn2zj@r.postjobfree.com
A highly talented and accomplished Construction Management professional
with skills and experience in Project Management and Staff Supervision.
SUMMARY OF QUALIFICATIONS
> Over 24 year's Project and Team management experience in the
electrical construction industry.
> Highly adept at directing multiple construction projects.
> Able to work well with clients to resolve issues, perform planning,
and ensure satisfaction.
> Knowledgeable in working with, and managing teams and subcontractors.
> Familiarity with budget management, all phases of construction cost
monitoring, and scheduling.
> Excellent communication and motivation skills. Strong management and
interpersonal skills.
> Very familiar with Microsoft Outlook, PowerPoint, SharePoint,
Microsoft Words & Excel
PROFESSIONAL EXPERIENCE
Engitek, LLC 2009 - Present
Consultant
. Responsible for Project Management, coordinating construction
projects, provide cost effective solutions, review and interpret
contract documents.
. Provide feedback on recommended changes to drawings and
specifications. Provide liaison for the contractor and the owner.
. Provide professional expertise in the selection of contractors with
particular emphasis on prequalification, bid evaluation and site
management.
. Serve as main point-of-contact with clients, contractors, architects,
and contractors.
Thoron Haiti, SA 2010 - 2012
Project Engineer
. Conducted preliminary studies for the construction of a hotel in Port-
au-Prince.
. Responsible for operation and maintenance of a Substation and
transmission lines in the area of Delmas, Haiti.
. Monitored the distribution of electric power to various distribution
points. Made periodic inspections of the power plant controls and
other devices to insure smooth functioning.
. Assisted in maintaining electrical power through the main electrical
plant in the City of Jacmel, Haiti, and primary distribution system,
and in the operation of the central switchboard to actuate remotely
controlled circuit breaker and transformers.
Magesco, Inc. Miami, Florida 2004 - 2009
Consultant/Project Engineer
. Managed and supervised the installation of the Airport Surface
Detection Equipment - Model X at Kentucky, Louisville Airport.
. Managed and supervised the installation of the Airport Surface
Detection Equipment - Model X at North Carolina, Charlotte Airport.
. Managed and supervised the installation of the Airport Surface
Detection Equipment - Model X at Georgia, Atlanta Airport. Work
include the installation of Low Level Wind Assessment System (LLWAS),
antenna support structures, fiberglass fold down mast and steel high
mast, reinforced concrete foundations, concrete equipment pads, and
installation of obstruction lights.
Sevign Castor
Resume
Page 2 of 3
. Directed all phases of electrical construction for the North
Shore/Concourse "A" Project at Miami International Airport.
. Oversaw Design Review, Change Orders, Claims, Project Implementation,
and Scheduling.
. Managed labor, procurement of material and equipment to ensure budget
compliance and restraint.
Marvelous Electric, Inc., Miami, Florida 2001 -
2003
Project Manager
. Monitored construction sites, ensuring compliance with contract
Specifications, Codes, City and State Regulations.
. Managed and supervised work in HV high voltage up to 275kv power
transmission and distribution system substations, HV/MV/LV
switchgears, power transmission towers and poles including
specifications, construction, inspection and maintenance.
. Reviewed costs and purchases to maintain constant cost control.
. Hired and supervised contractors and vendors. Carried out purchasing.
. Worked closely with General Contractors and Owners on issues and
specifications.
Hypower, Inc., Fort Lauderdale, Florida 1997 - 1998
Project Manager
. Managed daily operations of two Capital Projects in the City of Miami
Beach totaling $30 Million.
. Responsible for the removal of all architectural barriers that are
structural in nature in order to comply with the ADA Standards (Title
III of the Americans with Disabilities Act of 1990 (42
. U.S.C. 1218). These include: installing ramps, making curb cuts in
sidewalks, and entrances, installing flashing alarm lights, etc.
. Carried out all projects and team scheduling.
. Increased staff production and profitability by more than 30%,
applying efficient management techniques.
. Managed and supervised work on transmission line route and alignment,
survey towers, tower spotting, sag profile, loading trees, foundation
installation, erection, stringing and tensioning.
. Responsible for providing technical expertise to support power plant
equipment.
. Conducted field surveys, and inspections, and prepared estimates.
. Supervised installation and ensure compliance with contract documents.
. Attended design review meeting, and progress meeting with contractors,
City Agencies, and Utility Companies.
. Managed all product and supply purchasing activities, and procurement
of material and equipment.
Turner Technical High School, Miami, Florida 1995 -
2000
. Math and Algebra Teacher (Adult Education Program)
Sevigne Castor
Resume
Page 3 of 3
Robinson Industries, Inc., Miami, Florida 1994 -
1997
Project Manager
. Oversaw all phases of construction from groundbreaking to completion
of many electrical construction projects.
. Managed construction of various electrical construction projects such
as Homestead Motorsports, in Homestead, Concourse "A" and Cargo
Buildings at Miami International Airport, and Parking Parking Garage
at Jackson Memorial Hospital, in Miami.
. Performed tasks of designing power distribution, grounding motor
control, lighting, control systems and protection systems.
. Coordinated all project activities, including sub-contractors and
vendors.
New York City Department of Transportation, Queens, New York
Chief Electrical Inspection/Construction 1992 -
1994
. Responsible for direction and supervision of 22 Engineers and
Electrical Inspectors.
. Worked in administrative capacity in supervision of ongoing Capital
Construction Projects and Maintenance.
. Planned and chaired construction conferences, and meetings. Reviewed
drawings and contract documents.
. Reviewed construction costs, insuring timely project completion within
budget.
. Approved/disapproved work performed by contractors.
Assistant Chief Construction/Maintenance 1988 -
1992
. Oversaw all phases of street lighting installation, repair, and
maintenance.
. Participated in design and installation of transmission and power
distribution systems, not limited to power circuit breakers, power
transformers, protection relay, regulator controls, and motors.
. Responded to public complaints, and requests regarding streetlight
needs and deficiencies.
. Conducted field surveys prior to start of projects to determine
requirements and restrictions.
. Monitored work progress, conducted on-site inspections, and staff
supervision, ensuring compliance with design criteria and codes
regulations
. Attended and participated in meeting with Public Work Agencies,
Consultants, and Contractors, identifying and addressing street
lighting problems with prepared solutions.
EDUCATION AND TRAINING
Fraud Examiner Courses - 2014
Nova Southeastern University, Fort Lauderdale, Florida
Master of Business Administration, December 2002
The University of the State of New York
Intern Engineer (EIT) 1990
Pratt Institute, Brooklyn, New York
Bachelor of Electrical Engineering, June 1988
References available upon request