Sathesh kumar R

Project Engineer

PERSONAL PARTICULARS

Passport No. : H5735285

Gender : Male

Age : 27

Nationality : Indian

Date of Birth : 15 March 1987

Place of Birth : karur -Tamil Nadu.

Address : 2\323 Bhahavathi Amman Kovil Street,

Sirunayakanpati (post),

Nilakotai (TK), Dindigul (DT)

Tamil Nadu, India-624219

Contact No.

: +601******** (Malaysia)

+918*********(India)

Email : ************@*****.***

EDUCATION

Year Name of School / Institution Qualification

2006 - 2009 M.Kumarasamy College of B.E Electrical and

engineering. Electronics Engineering

2004 - 2006 IRT polytechnic College. Diploma in Electrical and

Electronics Engineering

WORKING EXPERIENCE

Company : SUNWAY CONSTRUCTION SDN. BHD. (Since Nov'-2009)

Level 9, Menara Sunway, Jalan Laggon Timur, Bandar

Sunway,

46150 Petaling Jaya, Selangor Darul Ehsan.Malaysia.

Tel: 603-****-****

Year Designation Project MEP Value

Oct' 2009 - Project Engineer Phase 1, Residential Plot 373

Nov' 2012. (MEP) A, Zayed Sports City, Abu Million(Arab

Dhabi. Emirates

Dirhams)

Dec' 2012 - Project Engineer Pinewood Iskandar studios 98 Million(

Jun'2014. (MEP) Malaysia. Ringgit

Malaysia)

Since Project Engineer Afiniti Medini Malaysia 56 Million(

Jul'2014 (MEP) Ringgit

Malaysia)

Detail of Work Experience:-

Project description: Rihan Heights Residential apartment -Abu Dhabi (UAE)

[pic] [pic]

. Total value of AED373 million is equal to INR625 crores.

. Total 5 towers 32,28,21,18 & 22 floor each residential apartment, 3

floor of car park (basement)

. Includes 14 individual villas, landscape, clubhouse, gymnasium,

swimming pool and penthouse.

MEP System Involved:

Electrical:

. Electrical power and Lighting.

. Earthling and lighting production system.

. Aircraft warning light

Extra low voltage:

. Building management system(BMS)

. Building Security system( BSS)

. Card Access (CA)

. SMATV and Telecom System

ACMV:

. Mechanical ventilation system

. Air-conditioning (AHU and FCU) and Chilled water system

Fire Fighting:

. Hose reel and Sprinkler

. Fire Alarm

. Public address system (PA)

Plumbing:

. Cold water and hot water system

. Sewerage System.

Key Role performed:

. Person in charge for 32 stories tower and over all BMS testing and

commissioning.

. All MEP shop drawings and coordination preparation and submission.

. All technical catalog, Work Method Statement,design proposal and

request for information (RFI ) submission to Client

. Liaise with client, architects and M&E consultant on technical Issue,

site work and co-ordination matters.

. To attend daily/weekly site meeting to resolve subcontractor problems

to ensure that deadlines, procedures, and other project requirements

are met.

. To check subcontractor work ensure carried out is as per approved shop

drawing and within the time frame and progress of the approved

construction program.

. Ensure that the installation, inspection and testing of all the

equipment, fittings and work implemented meets the specification and

the consultant requirements.

. Prepare MRO and follow up on delivery and check quality/quantity

against delivery orders and purchase orders

. To monitor and report on daily manpower. To instruct contractors on

areas that required additional manpower in order to achieve targeted

schedule.

. Update and record all debit note particulars daily for site contract

and Contracts Department to proceed with the claims.

. Handed over the building with complete installation, testing and

commission with minimize the system defect to client

. Effectively conducted safety tool box briefing for more than 500

workers daily.

. Control the wastage and Implement 3R system.

Project description: Pinewood Iskandar Malaysia Studios:

[pic] [pic]

. Total value of RM 90 million is equal to INR169.7 crores.

. Five Film studio with ancillary block,Two TV studios, Technical block,Production block, Central energy plant, workshop, Annex block

. Includes one viewing theater, one dubbing theatre, Open car park and

green screen tank.

MEP System Involved:

Electrical:

. Underground cabling for Power supply.

. Special Lighting (DALI dimmable system)

. Earthling and lighting system

Extra low voltage:

. Building management system(BMS)

. Building Security system( BSS)

. Card Access (CA),SMATV and Telecom System, SCADA system and PLC

ACMV:

. Mechanical ventilation system

. Air-conditioning(AHU)

. Underground Chilled water system (Chiller and cooling tower)

Fire Fighting:

. Hose reel and Sprinkler (Underground piping involved)

. Fire Alarm

. Public address system (PA)

Plumbing:

. Cold water and hot water system

. Sewerage System.

. Rainwater harvesting and water filter system.

Key Role performed:

. Person-in-charge for Special Lighting. (involve RM12 Million equal to

INR22.6 crores include 60,000 quantity of light fitting and 87

different types )

. Take over BMS testing & commissioning and lead the annex block

progress.

. All special lighting shop drawings, samples and technical catalogs

submission.

. Liaise with client, architects and M&E consultant on technical Issue,

site work and co-ordination matters.

. To check special lighting installation work ensure carried out is as

per location, type and control.

. Ensure that the installation, inspection and testing of all the

special light fittings and work implemented meets the specification

and the consultant requirements.

. Prepare MRO and follow up on delivery and check quality/quantity

against delivery orders and purchase orders

. To monitor and report on daily manpower. To instruct contractors on

areas that required additional manpower in order to achieve targeted

schedule.

. Handed over the building with complete installation, testing and

commission with minimize the system defect to client

. Arrange and control special lighting storage implement the 5S system.

. Control the wastage and Implement 3R.

Project description: Afiniti Medini (urban wellness):

[pic]

. Total value of AED56 million is equal to INR105 crores.

. Total one tower 24 floor residential apartment, one tower 34 floor

Hotel and 4 floor of car park (basement)

. Includes 5 floor wellness centers, 6 floors corporate training center,

auditorium, two swimming pools, three water feature system and

landscape.

Key Role performed:

. Person-in-charge for cooperate training center, Swimming pool,

auditorium and water feature system.

. All shop drawings, coordination drawing, samples and technical

catalogs submission.

. Liaise with client, architects and M&E consultant on technical Issue,

site work and co-ordination matters.

. To check VRV (Aircon unit) installation work ensure carried out is as

per location, type and control.

. To check swimming pool and water feature pump installation, pipe

routing work ensure carried out is as per location and size to get

best finishing result to meet client requirement.

OTHERS DUTIES & RESPONSIBLITIES

. Implementing ISO 9001:2000 Quality Management System & Internal

Quality Audit To ensure the effective implementation of construction

planning activity from pre-contract to construction is in conformance

to ISO 9001:2008 Quality Management System & ISO 14001:2004

Environmental Management System;

. Participate in matters concerning Occupational, Safety and Health

(OSHA) organize by company;

. Updated Daily/Weekly/Monthly Status of MEP Works/Submissions to

Superiors/Senior Project Manager.

. Closely monitored the pending/outstanding items like

resubmission/Variation works by performing Special tasks.

. Ensured that the monthly claims are prepared and submitted promptly.

. Studied, highlighted and resolved the discrepancies in drawings / BQ

and specification.

. Liaison inclusive of meeting with subcontractors and suppliers.

. Plan, implement and monitor the weekly program so that the overall

project program can be achieved.

. Coordinated all M&E services related to structural and architectural

works.

. Liaise with clients, architects and consultant on site works and

drawings and coordination matters.

. Ensured all M&E sub contractors submit their materials for approval

prior to commencement of works.

. Complied with site safety requirements and ensure safe working

methods, hazard identification and initiate counter measures on safe

system of works by conducting daily Tool-Box briefing to the Workers.

. Be sensitive and aware of public requirements on the surrounding job

site to uphold Company's good image.

. Implementation of Quality Assurance

o By checking drawings and specification on aspects of accuracy

discrepancies and follow up with consultants to resolve.

. Implement any and all relevant policies, procedures and work

instructions as so defined in the Company's Quality & Environmental

Management System.

. Ensured all the subcontractors submit their As-Built drawings prior to

the final handover of the Project by instruction them in terms of

procedures, schedules to meet the requirement of Client/Consultant.

SPECIAL SKILL

Language : Tamil, English & Malay

Computer : Microsoft Office & Basic AutoCAD 2010.

DECLARATION

I hereby confirm that the information given above is true to the best

of my knowledge.

Place :

Date :

(SATHESH KUMAR.R)