Post Job Free
Sign in

Maintenance Project

Location:
India
Posted:
November 30, 2014

Contact this candidate

Resume:

CURRICULUM VITAE

SANJAY D. JOSHI

‘Anand Park’, Flat No. 15, B – Building,

Ganesh Nagar, Wadgaon Sheri, Pune – 411 014

Cell # 904-***-**** / 982**-*****

E-mail : ************@*****.***

Professional Objectives

To work in the field of maintenance & projects by ensuring plan execution, errection,

commissioning & adequate maintenance of plant and machinery carried out for processing

confirming and quality product.

Working Experience :

1.Company : Innoventive Industries Ltd. Pune.

. Duration : May. 2009 to Till Date

Plant Manager (Production & Maintenance )

Job Profile :

Working as a Production, Maintenance plant head of Sheet

Metal Division. Also looking after all Project work related to Plant Setup, Machinery

erection, commission, alignment work. Having Slitting line, Cut To Length, Hyd. shearing

etc. etc. Also visited to Europe for M/C. inspection.

2. Company : Shapoorji Pallonji & Co. Ltd. Infocity Pune.

Company Profile :

Shapoorji Pallonji & Co. Ltd. is just one of the jewels in the SP crown. It draws vital support

from other group companies to be able to execute turnkey projects swiftly and efficiently.

These include SP Fabricators, AFCONS, Forbes, Sterling and Wilson, SP Construction

Materials Group, SP Real Estate and Samalpatti Power Company Private Limited. Together,

this conglomerate continues to strive towards perfection, quality and commitment virtues.

Shapoorji Pallonji is the largest private shareholder (18.5%) of TATA SONS LIMIT ED, the

Holding Company of the TATA Group. The Annual turnover of the TATA Group is over

$15 billion.

Duration : May 2008 to May 2009.

Site handled : Fiat Automobiles (P) Ltd. Ranjangaon Pune.

Volks wagon India Ltd. Chakan, Pune.

Job Profile –

Monitoring, Supervision & Planning Independently of Project Work. Estimation, Rate

analysis & finalizing specifications for the Project.

Responsible for plant setup & commissioning of the infrastructure with selection of

consultants & Co-ordination as per Govt. norms.

Structural work (i. e. Fabrication of Factory Sheds, Column, Trusses, Purlins,

Bracings, M/c Base Frames etc. etc.)

3.Company : Arihant Domestic Appliances (P) Ltd. Sanaswadi, Pune.

Company Profile :

Manufacturing of CEW & ERW Steel Tubes having Tube Mill, Draw Bench

Straightening M/c, EOT Cranes, Compressors, D. G. Set etc. E.T.P. S.T.P. Water treatment

Plants etc.etc.

Duration : Aug. 2003 to May 2008

Job Profile : Worked as a Asst. Manager Project

Project Work –

Monitoring, Supervision & Planning Independently of Project Work. Estimation, Rate

analysis & finalizing specifications for the Project. Consult with the concerned Govt.

Authorities. Also responsible for plant setup & commissioning of the infrastructure

with selection of consultants & Co-ordination as per Govt. norms.

All civil activities (i. e. Factory Shed, Foundation, RCC, PCC Work, Flooring, Cable

Trenches, Roofing, M/c Foundation Work etc. etc.)

Structural work (i. e. Fabrication of Factory Sheds, Column, Trusses, Purlins,

Bracings, M/c Base Frames etc. etc.)

FUNCTIONAL AREA –

Plant setup & commissioning of new shed

Capex – Budgeting & control

Project Planning including selection of Contractors

Project Monitoring

Quality Control.

SKILL –

Strategic capability

Negotiation Skill

Ability to work under pressure

Ability to handle multiple projects.

Analytical skill

Functional Excellence.

4. Company : CTR MFG. IND. LTD., Pune-Nagar Road

Company Profile :

Subsidiary Group of Crompton Greaves Ltd.

involved in manufacturing of On Load Tap changers, Radiators & Rail Track Equipment

having well equipped Press & Machine Shop with 300 Ton Press, Shot Blasting M/c, FN2

Milling M/s, Horizontal Boring M/c, Cylindrical Grinding M/c etc.

Duration : Nov. 1998 to Aug. 2003

Job Profile : Worked as a Maintenance In-charge

Preventive and Break-down Maintenance of Plant, Machinery & Equipment.

Preparing schedule for P. M.

Handling Machine Shop engaged in manufacturing spares for machines.

P. M. & Break Down Maintenance of Heavy Machines & Equipment like Shot

Blasting, Overhead Cranes, Compressors, Generators, Chilling Plants etc.

Handling Mechanical, Civil, Elect., Pneumatic & Hydro. Maintenance of all factory.

Development Activity

Experiments on Energy Consumption.

Ensuring Machine Capability

Maintain and comply with ISO procedure and implementation in working areas.

Monthly Performance Review Presentation to M. D.

5. Company : Paranjape Metal Shapers Ltd., Shirval, Satara

Company Profile :

Involved in manufacturing of Cast Iron

Cylinder of Vehicles having 1 Ton Induction Furnace, Molding Machines & Well -equipped

Machine Shop.

Duration : Nov. 1994 to Nov. 1998

Job Profile : Worked as a Maintenance Engineer

To attend break down maintenance.

Preparing schedule for preventive maintenance and ensure P. M. as per schedule.

Spares Management

Educational Qualification:

Passed Matriculation from Pune Board with Distinction 76.00%

Passed Diploma in Mechanical Engg, from MSBTE Bombay with Ist Class 60.00 %

Professional Training

Training of TQM & Kaizen conducted by SGM Crompton Greaves Ltd.

Training on Energy Conservation in CTR Mfg. Ind. Ltd.

Training on ISO documentation in CTR Mfg. Ind. Ltd.

PERSONAL INFORMATION

Name : Sanjay D. Joshi

Father’s Name : Damodar S. Joshi

‘Anand Park’, Flat No. 15,

Present Address :

B Building, Ganesh Nagar,

Wadgaon Sheri, Pune – 411 014

At Post – Vaduj,

Permanent Address :

Tal. Khatav, Dist. Satara

6th June, 1971

Date of Birth :

Sex : Male

Marital Status : Married

Nationality : Indian

Salary Drawn : Rs. 7.20 Lakhs- gross p.a.

Declaration

I hereby declare that the above said information is true to the best of my knowledge.

Place : Pune

Date : (Sanjay D. Joshi)



Contact this candidate