KANCHAN TALUKDER
Flat No.*F, Venkatesh Laxmi Paradise,
Check post, Rajarhat Road, Kolkata-700136, West Bengal.
Email: ********@**********.***
Tel.: (Mobile) 0-933*******/ 0-943*******
Date: 13.11.2014
Dear Sir,
This is in reference to your recent requirement in Sr. Executive position
at your reputed Group; I wish to offer my candidature for the same.
Review of my credentials will confirm that I have served as a catalyst for
Project planning & Execution, Maintenance, Operation, Spares Management and
Contract Management, planning & business strategy with complete
accountability complemented by over 27 years of experience.
At present I am associated with NICCO Corporation Ltd as General Manager
(ECD) & before joining this group I was in Corporate Ispat Alloys Limited
of Abhijeet Group as General Manager. Basically I am an Electrical Engineer
and served in different Industry over 27 years.
I understand that working for your organization requires a candidate who is
team oriented and is able to deal with people in various departments. I am
confident that I possess these skills, which will help me to perform the
job efficiently and effectively.
My goal is to transit my enthusiasm, creativity & experience into a
position, where I continue to provide the strategic/ tactical leadership
critical to retaining valued customers of an organization. I am certain
that my presence in your team will prove to be beneficial to your
organization. As such, I would welcome an opportunity to speak with you to
evaluate your needs & share my ideas.
My detailed resume is enclosed for your reference.
Thanking you
Sincerely,
Kanchan Talukder
[pic]
KANCHAN TALUKDER
Professional A competent Professional with more than 27 Years of command in
Summary Project, Operation, Maintenance & Engineering. Have vast
experience in the Area of Strategic Planning, Resource
Management, Quality Management, Energy Management etc
especially in Steel, Power & Ferro Alloys.
Permanent Address- Flat No.4F, Venkatesh Laxmi Paradise, Check post,
Rajarhat Road, Kolkata-700136, West Bengal. Cell No 0-933*******,
Email - ********@**********.***,
Professional Joined at NICCO Corporation Ltd in March 2014 as General
experience Manager in Electrical Contract division of NICCO Cables ltd
and responsible for heading the execution of entire Contract
division.
Since Aug 1998 to Feb 2014 as General Manager at Corporate
Ispat Alloys Ltd, a Unit Under Abhijeet Group of Industries.
Responsible for Head of Engineering Division & Lead the
Operation, Maintenance & Projects.
Job Responsibilities:
Head of Engineering Division. Lead the Operation, Maintenance
& Project
Planning & execution of the Unit.
Planning & execution of 25 Mw Coal based & 10 MW Biomass based
Power Plant
Implementation of QMS & Energy Management.
Drawing Development & plot plan preparation for projects.
Compliance of Statutory requirements.
Negotiation with Consultant, Vendors along with technical
clarifications for different Packages.
Resource Management.
Execution of Projects right from negotiation up to
commissioning.
Compliance of Non conformities and corrective action Planing.
Preparation of Balance Score card, plan for Preventive &
corrective action.
Responsible for Process Improvements, PMS, Improvement in
Productivity, Plan for reduction in Variable cost.
Maintenance, Testing & Calibration of EHT &HT Equipments,
relays, Meters, Instruments.
Management Representative for Implementing & continuation of
Quality Management System, PMS, Energy Conservation, EHS .
Liaising with Statutory Authorities, Inspectorates.
Expertise in Coal & Biomass based Power plant.
Feb 1990 till July 1997, at Ispat Alloys Ltd, a
professionally managed leading Organization in ISPAT GROUP
expertise in steel industry at Balasore, Orissa in different
capacities handled Project and Maintenance activities .
Job Responsibilities-
Installation, Commissioning & Maintenance of E.H.T & H.T
Equipments such as Transformer 132/11KV up to 20 MVA, Furnace
Transformer up to 15 MVA, 11KV/ 70-150 V with on load Tap
changer, 132 KV MOCB, CT, P.T, L.A, Isolators etc .
2. Installation, Commissioning &Maintenance of Breakers
(Air, SF6, Vacuum) .
3. Installation & commissioning of 132/11 KV Switch yard.
4. Maintenance of other H.T &L.T equipments like capacitor
banks, MCC, PCC,
PUMPS, OLTC, Material-handling system etc.
5. Installation & Commissioning of 15 MVA, 7.5 MVA Submerged
Arc Furnace.
6. Installation & Commissioning of 11KV,13MVA, M.A.N, 5.4
MVA M.A.N Diesel
Generator Set.
7. Testing and Calibration of Protective Relays, Furnace
Prtection System, Transformer Protection System etc.
8. Establish & Documentation for Quality Management system.
Preparation of
SOP, W.I and maintain Qualit
From 1986 to January 1990 as Project Engineer at Associated
Electrical Construction Co Pvt Ltd, a Leading Construction
Group In Kolkata.
Key Skills - Project Scheduling & implementation / Manpower
handling / Testing and commissioning.
Job Responsibilities-
1. Estimation and scheduling of Project.
2. Preparing cable schedule and route layout.
3. Inspection of Equipments.
4. Negotiation with suppliers.
5. Site Mobilization and execution of Project activities.
6. Attending meeting with client
7. Man power handling.
8. Testing and commissioning.
9. Liaisoning with Statutory authorities and preparation of
Compliance Report.
Professional
qualification Electrical Engineer,1st class.
Professional Quality Management Assessor for CII & Export -Import Bank of
memberships India on European Foundation of Quality Management.
S.C.C. Holder of Director of Electricity Board, Govt. Of West
Bengal.
S.C.C. Holder of Director of Electricity Board, Govt. Of
Orissa.
Academic 1981, Higher Secondary, 62.5%, Science Group, West Bengal
education Council for HS Education
1979, Secondary, 67%, General Studies, West Bengal Board for
Secondary Education
Training
Undertaken On Job Training at G,R,S.E Ltd, Kolkata.
On Job Training at DPL, Durgapur.
Training at Siemens, Germany on Alternator Protection and
control system.
Objective
To be placed in the Executive Position of a reputed
organization, associate and contribute in providing a
dynamic orientation to the organizational activities and
policies
Date of birth 2nd January, 1964
Computer M.S.Office, Experience of work in ERP, S.A.P environment.
proficiency
Extracurricula
r activities Quizzing, Games (Cricket)
Interest and Reading, Quizzing, Viewing Sports, Listening to Music
activities
Languages English, Hindi, Bengali,, Oriya.
known
Expected
Salary Negotiable
KANCHAN TALUKDER
WRITE UP ON SIGNIFICANT PROFESSIONAL ACHIEVEMENT
1. During my stint as project Engineer at Associated Electrical
Construction Co. Pvt Ltd, I had executed the following Projects :
. Installation, Testing and Commissioning of Fume Treatment
Plant at NALCO, Angul, Orissa.
. Installation, Testing and Commissioning of 11KV Outdoor
Substation and control equipments at B&A Sackd Ltd, Balasore
Orissa.
. Installation, Testing and Commissioning of 11KV Substation
and process control equipments of Ceeta Polymer ltd, Orissa..
. Installation, Testing and Commissioning of ESP at MPEB,
Korba.
2. During my stint at Ispat Alloys Ltd in various capacities I had
undertaken the following Projects along with regular maintenance
assignments:
. Installation, Testing and Commissioning of 132/11KV Switch
Yard-3 nos bay.
. Installation, Testing and Commissioning of 2 nos 4.5 MVA
Wartsila DG Set, and 2 Nos 13 MVA M.A.N DG Set
. Installation, Testing and Commissioning of 1 no 15 MVA & 2
nos 7.5 MVA capacity Submerged Arc Furnace along with raw
material handling and gas cleaning plant..
3. During my current stint as General Manager at Corporate Ispat Alloys
Ltd I have undertaken various activities as follow :
. Installation, Testing and Commissioning of 2 Nos 7.5 MVA, 1
no 9 MVA & 1 no 12 MVA Sub merged Arc Furnace.
. Execution of 25 MW Coal based Captive Power Plant.
. Execution of 10 MW Biomass base Power Plant.
. Execution of 200TPD Sintering Plant.
. Implementation of Energy management System.
. Implementation of Quality Management ISO 9001:2008 System
acting as Management Representative.
. Reduction in Production Cost by implementation of Heat
Recovery system in Raw material feeding before charging.
. Reduction in Aux. Power Consumption by optimizing the running
time of Drives
Place : Kolkata