MUHAMMAD ARFAN MAZHAR
Address: House
No.P-****/*530 Street No.13 Farooq Abad,
Mansooraba Faisalabad
Personal profile
Father's Name : Muhammad Mazhar Bashir
Date of Birth : 10-10-1990
Religion : Islam
Domicile : Faisalabad (Punjab)
Nationality : Pakistani
NIC # : 33100-1210905-1
Marital Status : Single
Cell No : +923**-********
E-mail : *************@*****.***
Passport No : CT0849051
Qualification:
Degree Institute Division Year
B.Tech pass Preston University In 2014
(Electrical) progress
Faisalabad campus
D.A.E PBTE Lahore 1st 2009
(Electrical)
Matriculation BISE Faisalabad 2nd 2006
WORKING EXPERIENCE:
I have 06 Years of Experience at Gas Turbines, HFO Diesel Engine Niigata,
Caterpillar diesel Engine and Jenbacher Gas Engine Power plants in which I
was involved in Operation, Troubleshooting and Maintenance.
I have worked one year in Sapphire fibers ltd (Plant Capacity: 8.474MW) as
a Trainee Plant operator and currently working in Ibrahim fibers Ltd. As
Control room operator (Plant Capacity: 71.8MW) from 06-05-2010 to till
date.
WORKED ON FOLLOWING MACHINES;
Gas Turbine Turbo Mach SA Titan-130
13.5 MW * 1
Niigata Engines 16V32CLX (H.F.O)
5.3MW * 11
Caterpillar 3512(Diesel Engines)
1.020 MW * 2
Caterpillar 3512(Diesel Engines)
1.120 MW * 1
Caterpillar 3516A (GAS Engines)
1.005 MW * 2
Caterpillar 3516B (Gas Engines)
1.120 MW * 2
Jenbacher J320GS (Gas Engine)
1.064 MW * 1
Professional Experience on Gas Turbine:
Ibrahim fibers Ltd. is a largest unit of polyester and yarn production in
Pakistan. The owners increasing plants capacity time to time. For this
purpose the installed capacity of power plant is 71.8MW.
Erection / Commissioning & Operation of Power Plant
Power Plant 13.6MW capacity designed by "TURBOMACH (Switzerland)" and
NIIGATA ENGINES 16V32CLX (H.F.O) installed under supervision of
"TURBOMACH / ENERPROJECT / BONO ENERGIA" Engineers & Technician. I worked
with this team from commissioning to startup of the plant. I participated
in the plant installation & commissioning activities. All loops were tested
& verified. All the plant Controlled by DCS (Distributed Control System).
Plant web by EMERSON Process Management, Company of USA.
Power Plant Comprises of:
Plant Capacity: Total 71.8MW
PG-01 - Bi-fuel power plant (58.3MW) based on HFO engines of NIIGATA
16V32CLX (11 No's each of 5.3MW).
PG-02 - Gas turbines power plant of TURBOMACH SA TITAN-130 (13.5 MW).
Gas Turbine Gas Turbines by TURBOMACH, Switzerland
Each Gas Turbine having capacity of 13.6 MW.
Gas Compressors Gas Compressors by ENERPROJECT SA, Switzerland
Each having Capacity of 5000 NM3/Hr.
Suction Pressure = 0.5-4.0 Bar, Discharge Press
24 Bar
HRSG Waste Heat Recovery
Boilers by Bono Energia, Italy.
Capacity = 25 Tons/Hr (Super Heated Steam)
Pressure = 25 Bar, Temperature = 255 C
Responsibilities:
V Specially worked at Gas Turbine in the Operation field.
V Worked on engine control and monitoring system.
V Worked during scheduled and unscheduled maintenance of HFO engines also
including its auxiliaries.
V Worked on RLC, PLC & DCS systems, synchronization, load sharing system
and monitoring the Temperature sensors during the operation plant.
V Worked and trouble shooting of different rating of Motors and their MCC
panels.
V Troubleshooting, testing and maintenance of operating mechanism
switchgear and vacuum circuit breaker & Air circuit breaker.
V Installation, wiring and configuration of low voltage Air circuit
breakers, also contact inspection and replacement.
[pic]