Post Job Free
Sign in

Power Plant Gas Turbine

Location:
Islamabad, Islamabad Capital Territory, Pakistan
Salary:
12500RS
Posted:
December 28, 2014

Contact this candidate

Resume:

MUHAMMAD ARFAN MAZHAR

Address: House

No.P-****/*530 Street No.13 Farooq Abad,

Mansooraba Faisalabad

Personal profile

Father's Name : Muhammad Mazhar Bashir

Date of Birth : 10-10-1990

Religion : Islam

Domicile : Faisalabad (Punjab)

Nationality : Pakistani

NIC # : 33100-1210905-1

Marital Status : Single

Cell No : +923**-********

E-mail : *************@*****.***

Passport No : CT0849051

Qualification:

Degree Institute Division Year

B.Tech pass Preston University In 2014

(Electrical) progress

Faisalabad campus

D.A.E PBTE Lahore 1st 2009

(Electrical)

Matriculation BISE Faisalabad 2nd 2006

WORKING EXPERIENCE:

I have 06 Years of Experience at Gas Turbines, HFO Diesel Engine Niigata,

Caterpillar diesel Engine and Jenbacher Gas Engine Power plants in which I

was involved in Operation, Troubleshooting and Maintenance.

I have worked one year in Sapphire fibers ltd (Plant Capacity: 8.474MW) as

a Trainee Plant operator and currently working in Ibrahim fibers Ltd. As

Control room operator (Plant Capacity: 71.8MW) from 06-05-2010 to till

date.

WORKED ON FOLLOWING MACHINES;

Gas Turbine Turbo Mach SA Titan-130

13.5 MW * 1

Niigata Engines 16V32CLX (H.F.O)

5.3MW * 11

Caterpillar 3512(Diesel Engines)

1.020 MW * 2

Caterpillar 3512(Diesel Engines)

1.120 MW * 1

Caterpillar 3516A (GAS Engines)

1.005 MW * 2

Caterpillar 3516B (Gas Engines)

1.120 MW * 2

Jenbacher J320GS (Gas Engine)

1.064 MW * 1

Professional Experience on Gas Turbine:

Ibrahim fibers Ltd. is a largest unit of polyester and yarn production in

Pakistan. The owners increasing plants capacity time to time. For this

purpose the installed capacity of power plant is 71.8MW.

Erection / Commissioning & Operation of Power Plant

Power Plant 13.6MW capacity designed by "TURBOMACH (Switzerland)" and

NIIGATA ENGINES 16V32CLX (H.F.O) installed under supervision of

"TURBOMACH / ENERPROJECT / BONO ENERGIA" Engineers & Technician. I worked

with this team from commissioning to startup of the plant. I participated

in the plant installation & commissioning activities. All loops were tested

& verified. All the plant Controlled by DCS (Distributed Control System).

Plant web by EMERSON Process Management, Company of USA.

Power Plant Comprises of:

Plant Capacity: Total 71.8MW

PG-01 - Bi-fuel power plant (58.3MW) based on HFO engines of NIIGATA

16V32CLX (11 No's each of 5.3MW).

PG-02 - Gas turbines power plant of TURBOMACH SA TITAN-130 (13.5 MW).

Gas Turbine Gas Turbines by TURBOMACH, Switzerland

Each Gas Turbine having capacity of 13.6 MW.

Gas Compressors Gas Compressors by ENERPROJECT SA, Switzerland

Each having Capacity of 5000 NM3/Hr.

Suction Pressure = 0.5-4.0 Bar, Discharge Press

24 Bar

HRSG Waste Heat Recovery

Boilers by Bono Energia, Italy.

Capacity = 25 Tons/Hr (Super Heated Steam)

Pressure = 25 Bar, Temperature = 255 C

Responsibilities:

V Specially worked at Gas Turbine in the Operation field.

V Worked on engine control and monitoring system.

V Worked during scheduled and unscheduled maintenance of HFO engines also

including its auxiliaries.

V Worked on RLC, PLC & DCS systems, synchronization, load sharing system

and monitoring the Temperature sensors during the operation plant.

V Worked and trouble shooting of different rating of Motors and their MCC

panels.

V Troubleshooting, testing and maintenance of operating mechanism

switchgear and vacuum circuit breaker & Air circuit breaker.

V Installation, wiring and configuration of low voltage Air circuit

breakers, also contact inspection and replacement.

[pic]



Contact this candidate