SHELLY W. METTMANN
Taylorsville, UT 84118 801-***-****
SUMMARY
Successfully managed and scheduled large construction projects from bid to
a timely completion. Preformed as a Project Engineer scheduling, invoicing
clients, and coordinating and submitting change-orders. Scheduled large
projects tracking manhours and materials.
TECHNICAL SKILLS
Construction: CPM Scheduling, Change Order Negotiation and
Management, Submittal Tracking, Federal paperwork requirements,
Company EEO Officer, Cost Analysis, Accounting, Planning,
Estimating, and Blueprint Analysis.
Manufacturing: Master Planning, Material Requirement Planning, Inventory
Management; Capacity Management, Production Activity Control,
Just-In-Time, CPM Scheduling, Quality Management, and
Budgeting.
Software: Primavera Project Planner; SureTrak; Access; Fabtrol;
Timberline; Expedition; Excel; Word Perfect.
PROFESSIONAL EXPERIENCE
Mark Steel Corporation---Salt Lake City, UT---07 to 10---Scheduler /
Production Control
Scheduled, updated, and maintained Plate and Structural Steel SureTrak
Production schedules containing 1,000 to 15,000 activities.
. Created and published 'Materials Used' and 'Available' and 'Float'.
. Maintained Fabtrol (Steel Fabrication Database) software.
. Successfully analyzed SureTrak and Fabtrol manhours using Access
queries.
. Streamlined operations to promote a time project completion.
Adams & Smith---LDS Tabernacle-Salt Lake City, UT-05 to 06---Project Clerk
. Maintained RFI's, Submittals, and correspondence.
. Coordinated schedule with other subcontractors for an accuracy and
timely completion.
. Created intricate Excel spreadsheets to assist document control and
activity reporting.
. Tracked 100 % of blueprint updates and changes
. Tracked 100% manhours and processed payroll.
CCC Group---Wastewater Neutralization Project--Henderson, NV-05 to 05---
Project Engineer (Contract Job)
. Re-Invoiced client for work completed and continued to invoice.
. Redesigned Quantity Tracking system and updating weekly.
. Updated and tracked progress of P3 schedule to show project
acceleration and completion.
. Managed and updated transmitted blueprints.
Parsons Transportation---Commuter Rail-Salt Lake City, UT-03 to 04---Office
Engineer
. Created Excel spreadsheet to track developing issues in design and
engineering.
. Provided contract administrative support for Intermodal HUB TRAK
Extension.
. Supported preparation of DEIS, New Starts Report and other
correspondence/deliverables.
. Maintained document control and master project files, QA/QC
coordination, and administrative support to task leaders and
consultants.
. Assisted with coordination of preliminary engineering drawings and
production assignments and with the public involvement process for the
project
Shelly W. Mettmann Resume
5536 South Capital Reef Drive Page 2
Taylorsville, Utah 84118
PROFESSIONAL EXPERIENCE (cont.)
Carter Burgess Jacobsen--TRAX-Salt Lake City, UT-98 to 99---Office Engineer
. Analyzed the submitted OCS Primavera schedules for progress completion
and cost allocation.
. Coordinated all submittals, proposed changes, and change orders for
the Overhead Catenary System and Park & Ride.
. Computer Software used was Expedition, Primavera, Lotus 1-2-3, Excel,
and WordPerfect.
. Interfaced with UTA Staff, Designers, and Field Personnel.
. Project size $130 Million.
Elkhorn Construction--KN Energy--Sterling, CO-97 to 98---Project
Administration / Estimator
. Scheduled and up-dated the project noting weekly progress.
. Analyzed for timely completion of pipe, concrete, and structural
steel.
. Performed take-offs and contacted vendors for pricing of multi-million
dollar compressor stations.
. Project size $2.5 Million.
Upper Valley Utilities--City of Orem---Orem, UT-96 to 97---Project Manager
. Scheduled entire project from bid to completion, 25,000 activities,
tracking progress, resources, and costs.
. Conformed to Federally funded project paperwork requirements.
. Administered certified payroll preparation and OSHA, contract, and
SPEC compliance
. Preformed on-site estimating to facilitate project completion.
. Promoted team atmosphere in Strategic Partnership relationship (UDOT,
City of Orem, & UVU).
. Project size $1.2 Million.
EDUCATION
Training, State of Utah, STATE SACTIONED CONSTRUCTION PAPERWORK
Bachelor of Science, Utah State University, in BUSINESS ADMINISTRATION
emphasizing PRODUCTION MANAGEMENT.
Bachelor of Science, Utah State University, in COMMUNICATION
emphasizing ORGANIZATIONAL COMMUNICATION.
Bachelor of Science, Utah State University, in ADMINISTRATIVE SYSTEMS
emphasizing INFORMATION SYSTEMS.