Post Job Free
Sign in

Project Manager

Location:
Salt Lake City, UT
Posted:
August 29, 2014

Contact this candidate

Resume:

SHELLY W. METTMANN

**** ***** ******* **** *****

Taylorsville, UT 84118 801-***-****

SUMMARY

Successfully managed and scheduled large construction projects from bid to

a timely completion. Preformed as a Project Engineer scheduling, invoicing

clients, and coordinating and submitting change-orders. Scheduled large

projects tracking manhours and materials.

TECHNICAL SKILLS

Construction: CPM Scheduling, Change Order Negotiation and

Management, Submittal Tracking, Federal paperwork requirements,

Company EEO Officer, Cost Analysis, Accounting, Planning,

Estimating, and Blueprint Analysis.

Manufacturing: Master Planning, Material Requirement Planning, Inventory

Management; Capacity Management, Production Activity Control,

Just-In-Time, CPM Scheduling, Quality Management, and

Budgeting.

Software: Primavera Project Planner; SureTrak; Access; Fabtrol;

Timberline; Expedition; Excel; Word Perfect.

PROFESSIONAL EXPERIENCE

Mark Steel Corporation---Salt Lake City, UT---07 to 10---Scheduler /

Production Control

Scheduled, updated, and maintained Plate and Structural Steel SureTrak

Production schedules containing 1,000 to 15,000 activities.

. Created and published 'Materials Used' and 'Available' and 'Float'.

. Maintained Fabtrol (Steel Fabrication Database) software.

. Successfully analyzed SureTrak and Fabtrol manhours using Access

queries.

. Streamlined operations to promote a time project completion.

Adams & Smith---LDS Tabernacle-Salt Lake City, UT-05 to 06---Project Clerk

. Maintained RFI's, Submittals, and correspondence.

. Coordinated schedule with other subcontractors for an accuracy and

timely completion.

. Created intricate Excel spreadsheets to assist document control and

activity reporting.

. Tracked 100 % of blueprint updates and changes

. Tracked 100% manhours and processed payroll.

CCC Group---Wastewater Neutralization Project--Henderson, NV-05 to 05---

Project Engineer (Contract Job)

. Re-Invoiced client for work completed and continued to invoice.

. Redesigned Quantity Tracking system and updating weekly.

. Updated and tracked progress of P3 schedule to show project

acceleration and completion.

. Managed and updated transmitted blueprints.

Parsons Transportation---Commuter Rail-Salt Lake City, UT-03 to 04---Office

Engineer

. Created Excel spreadsheet to track developing issues in design and

engineering.

. Provided contract administrative support for Intermodal HUB TRAK

Extension.

. Supported preparation of DEIS, New Starts Report and other

correspondence/deliverables.

. Maintained document control and master project files, QA/QC

coordination, and administrative support to task leaders and

consultants.

. Assisted with coordination of preliminary engineering drawings and

production assignments and with the public involvement process for the

project

Shelly W. Mettmann Resume

5536 South Capital Reef Drive Page 2

Taylorsville, Utah 84118

PROFESSIONAL EXPERIENCE (cont.)

Carter Burgess Jacobsen--TRAX-Salt Lake City, UT-98 to 99---Office Engineer

. Analyzed the submitted OCS Primavera schedules for progress completion

and cost allocation.

. Coordinated all submittals, proposed changes, and change orders for

the Overhead Catenary System and Park & Ride.

. Computer Software used was Expedition, Primavera, Lotus 1-2-3, Excel,

and WordPerfect.

. Interfaced with UTA Staff, Designers, and Field Personnel.

. Project size $130 Million.

Elkhorn Construction--KN Energy--Sterling, CO-97 to 98---Project

Administration / Estimator

. Scheduled and up-dated the project noting weekly progress.

. Analyzed for timely completion of pipe, concrete, and structural

steel.

. Performed take-offs and contacted vendors for pricing of multi-million

dollar compressor stations.

. Project size $2.5 Million.

Upper Valley Utilities--City of Orem---Orem, UT-96 to 97---Project Manager

. Scheduled entire project from bid to completion, 25,000 activities,

tracking progress, resources, and costs.

. Conformed to Federally funded project paperwork requirements.

. Administered certified payroll preparation and OSHA, contract, and

SPEC compliance

. Preformed on-site estimating to facilitate project completion.

. Promoted team atmosphere in Strategic Partnership relationship (UDOT,

City of Orem, & UVU).

. Project size $1.2 Million.

EDUCATION

Training, State of Utah, STATE SACTIONED CONSTRUCTION PAPERWORK

Bachelor of Science, Utah State University, in BUSINESS ADMINISTRATION

emphasizing PRODUCTION MANAGEMENT.

Bachelor of Science, Utah State University, in COMMUNICATION

emphasizing ORGANIZATIONAL COMMUNICATION.

Bachelor of Science, Utah State University, in ADMINISTRATIVE SYSTEMS

emphasizing INFORMATION SYSTEMS.



Contact this candidate