H OWARD M. FITZGERAL D, II
***** ***** **, ***** ************, VA 23803 ● 804-***-****
● *************@*******.***
SUMMARY OF QUALIFICATIONS
• Certified 6-sigma green belt
• Leadership experience with hourly and salary associates
• Identify opportunities to improve quality, productivity, and customer
satisfaction
• Ability to analyze data using advanced statistical software
• Experienced in Project Management, job coordination, production scheduling and
forecasting
• Previous experience leading significant quality initiatives or managing large
manufacturing projects
• Solve complex business problems in both office and manufacturing
environments
• Provides coaching, counseling, and development of associates
• Applies continuous improvement tools such as 5S
• Experienced with Autocad, Solid Works, Datamyte, Fortran, Excel, Kronos and
DM M
• Plans and schedules workflow for functional department and operation
• Management of resources, information and goods between the point of origin and the
point of consumption .
• Analytically driven for process improvement, planning, implementing, controlling
goods and services to meet the needs of the customers
• Experienced with M icrosoft Word, Excel and Power Point applications
• Strong communications, documentation, and reporting skills
• Eagerly accepts additional responsibili ties in an effort to satisfy the needs of the
business; HP cost savings rework
PROFESSIONAL EXPER IENCE
H ill Phoenix, Richmond, VA (2009 –
P resent)
Door and F rame Engineer
• Spearheaded a cost reduction/defect recognition plan for stainless steel resulting in a
$250K savings.
• In t roduced a cost reduction plan in 2011 that will reduce a forecasted scrap
reduction plan by 50% or $2M.
• Provides coaching, counseling, and development of associates including performance
evaluations
• Scheduled daily staffing of associates for respective department
H OWARD M. F I TZGERAL D, I I
20103 Starr Ct, South Chesterfield, VA 23803 ● 804-***-****
● H ************@*******.***
• Verified associate actual work times through K ronos software for payroll
• Acknowledged by quality manager for increased quality and a reduction in errors
• Reduced OT for department by an average of $10k per associate from previous year’s
OT
• Implemented the Datamyte ideology which raised efficiency levels in the coils dept
by 20%
• Work with cross functional teams to leverage lessons learned to other areas of
facility
• Enforced proper PPE usage and audited work area as required
• Enforced following defined work procedures in an effort to promote predictable
quality outputs
• Assists operations management in the development and execution of production
schedule
• Coordinate with supporting departments to ensure an adequate supply of materials
a re available as required to support the production schedule
• Responsible for inventory management for assigned department
• Support customer requirements while financial inventory objectives are
accomplished.
• Documented time management for daily functions
• Applies continuous improvement tools such as 5S to improve the delivery and f low of
material to the line to complement optimum level scheduling and planning.
• Plans and schedules workflow for functional department and operation according to
p reviously established manufacturing sequences and lead-t ime.
• Analyzes data & collaborates in the determination & the subsequent application of
appropriate order, inventory, & replenishment policies.
• Coordinate planning and scheduling activities for assigned commodity utilizing
advanced planning tools to model, simulate, and release optimized material plans to
t he organization
• Maintain manufacturing Bill of Material (BOM) accuracy and report discrepancies
• Confers with planning manager and assembly supervisor to determine status of
assigned projects
• Identify parts used on their assigned product line, and verify placement location on
t he product i tself; also utilize work order information
• Maintains work area in clean, safe, and orderly manner
• Eagerly accepts additional responsibili ties in an effort to satisfy the needs of the
business
H OWARD M. FITZGERAL D, II
20103 Starr Ct, South Chesterfield, VA 23803 ● 804-***-****
● H ************@*******.***
Caribbean Cuisine L LC./ Classics Restaurant and Lounge L LC. (2006--
2009)
M anager
• Procured food and beverages
• Assisted with advertising
• Assisted with evaluating potential employees
• Payroll
• Managed staff of 40 plus associates
New Castle Homes LLC. (1999 – 2006)
Manager
• Assisted with the construction of residential homes
• Reviewed bids and projects for feasibility
• Hired sub-contractors
• Conducted market studies
• Construction Designed homes and lots
EDUCATION
Virginia State University, Petersburg, VA
BS,Mechanical Engineering