• Structural Steel Fabricator- minor and major steel work, general metal fabrication
• MIG, Duo shield, arc air gouge, quickie, plasma cutter, fluxcore welder.
• Earthmoving equipment, bucket rebuilds and repairs, dump truck rebuilds and
construction.
• Mining equipment, chutes and hoppers.
• Pipe work -stainless and mild steel.
• Fixed Plant Maintenance and Refurbishment.Shutdowns.
• Project and Construction work
• Truck driving.
KEY STRENGTHS
• Punctual, responsible and hardworking.
• A team player.
• Accurate and neat fabrication with a eye for detail.
• Responsible and courteous.
.
CERTIFICATES
• White Card National Construction Card.
• Working at Heights.
Employment History
Jan 2014 Red8
• Processing Plant shutdown.
Nov2013-Dec2013 Value Clean
• Cleaning Shopping Centres.
Oct 2013 – Dec2013 Spotless Cleaning
• Floor cleaning shopping centre.
Jan 2013 –Sept 2013 Go Gold Taxis Kalgoorlie Boulder
• Taxi driving
Nov-Dec 2012 Smiths Recruitment Belmont-Perth
• Repairing shipping steel recycling skips.
• repairing rips tears and fork spaces.
Oct-Nov 2012 Ativo Mine Site Maintenance and Construction
Reconditioning of the three firing tubes to the furnace that feed coke to the smelter. Modifying the
feed chutes so as to provide a more efficient flow of coke to the tubes and thus a more efficient
burn of coke.
Jan-May 2012 Monadelphous Engineering Kalgoorlie
• Fixed plant maintenance and Workshop
November 2011 Action Minning
• CAT Excavator bucket repairs.
Oct 2011 - Nov 2011 SDR/TENIX
• Structural fabrication and piece work.
September 2011 TIS Recruitmnent
• Mineral Processing plant shutdowns in Goldfields .
Ausust 2011 Action Mining
• Earthmoving bucket repairs. fluxcore welding.Arc
July 2011 TXM Recruitment
• Structural Steel Fabrication of Wharf building Pylon
Crane. Supervising construction and welding of 19m
Super beams, guiding funnels and pipes. Supervising a welding
school to select suitable welders.
June 2011 Hayes Minning
• Fixed plant maintenance. Pilbara Iron shutdown.HWE BHP Iron
Ore
Feb -March 2011 Leightons
• Mobile Plant fluxcore welding. Crack testing and repair of chasis,
buckets and dozer blades..
Jan 2011 Smiths Recruitment Rockingham
• Fixed Plant Shutdown Boilermaker. Cockburn cement. Arc air
gouging of plates and welding reinforcing into Trommel.
Dec-Jan 2011 Rimex Welshpool
• Oxy cutting dump truck rims and welding on new rims sub
arc.
October 2010 Integrated Kalgoorlie
• Gouging out and removing inner sleeves of boss on underground
truck.Reparing and panel beating smashed battery box,
reparing cracks in underground equipment,
bucket rebuilds; crack repair and gouging off shrouds-Sanvik
Kalgoorlie
June 2010 Hayes Recruitment
• Marine fitout of dredging barges. Westralian Engineering Preparing
fuel lid for the deck, oxy gouging off plates and repairing the deck
oxy cutting out damaged deck and replacing with new plate.
May 2010 Blue Collar People
• Structural steel work building Ship Loaders for Nth West. Fluxcore
welding.
April-May 2010 KSN Engineering
• Structural Steel Fabricator
Fabricating major and minor steel work. Large Collumns and
beams and platforms and stairways.
April -May 2010 Pacific Industrial Company
• Structural steel work, major and minor steel work for Nth
West infrastructure,buildings and warehouses. Large beams and
collumns for a warehouse structure.
April 2010 Orange Recruitment
• Mobile Plant Boilermaker. Preparing handrail for front of a dump
truck Tapping holes in battery holder of a dump truck bumper
fabricating bumper for dump truck.CAT Guildford
January 2009-Febuary 20010
APC Pest Control Boulder
• Fit out Boilermaker
Fit out trucks in preparation for desert trip..Fabricating
canopy, aircon frames,preparing trucks and trailers with tyre
holders and rust prevention. Innershield welding.
October 2009- October 2009-10-29 Thai Superfast welding
• Marine Boilermaker
Drydock barge fitout and refurbish.
March 2009-April 2009 Como Engineering
• Fixed Plant Boilermaker.
Refurbishment of Gold Mine Processing Plant.
December 2008 - January 2009 Choice One
• Boilermaker
Project fitter, pipe fitting.
October 2008-November 2008 Hayes Recruitment
• Maintenance Boilermaker at Bradken Welshpool
Foundry.Reparing process plant pipelines and equipment.
September 2008 - September 2008 Specialised Engineering Kalgoorlie
• Boilermaker/Welder
Removing corroded 15m 108nb airline and replacing with a
constucted stainless steel pipeline Kwanowa Belle.
August 2007 - November 2007 Weldpower Leonora
• Boilermaker/Welder
Installing an expansion joint in 900mm process line and replacing
wear plates at Goldfields mine site.
18 April 2007 - 20 May 2007 Company Solutions
• Boilermaker
Removing a defunct conveyor building and installing a new scats
conveyor at a Manganese mine.
15 April 2007 - 28 June 2007 Wildfire Engineering
• Boilermaker building 25 roof trusses.
Build a working model jig and construct 25 roof trusses.
February 2005 - 25 April 2006 Benchmark Recruitment
• Boilermaker
Mine site maintenance for Fixed Plant in Goldfields and
Pilbara. Panawonica, Karratha, Tom Price.
19 April 2005 - 28 June 2006 Red Dirt
• Boilermaker
Mine site maintenance and metal fabrication for Fixed
Plant in Goldfields
8 March 2004 - 22 June 2005 Twommeys
• Boilermaker
Mine site maintenance and metal fabrication Removing corroded
Fire Water Stand pipe, refabricating and installing. Removing SAG
mill feed chute wear plates, Fabricating corroded Processing Plant
equipment.
1 January 2001 - 28 February 2004 Extraman
• Boilermaker
Mine site maintenance and metal fabrication. Replacing worn slurry
tank mixing blades at St Ives Gold Mine.
January 2000 - 19 November 2004 Mining People
• Mine site metal fabrication and maintenance. At St Ives gold .
Moved a Ball Mill Gear Box Radiator from 1st floor platform to
ground floor and fabricated 85nm pipe work to suit transistion from
first to ground floor.
18 January 2000 - 22 February 2004 AMMS
• Boilermaker
Mine site maintenance and metal fabrication for fixed
plant.Replaced worn staeders at Cosmos Nickel.
replaced worn chute skirts at Bounty Gold Mine
Feb 2000- Aug 2004 Kiam Kalgoorlie
• Maintenance shutdowns at Leinster Nickel.
• Maintenance shutdowns at Bulong nickel. Welding baffles and
tank repairs with innersheild.
January 2000- January 2004 Monadelphous Kalgoorlie
• Boilermaker
Building Process Water lines and Fire Water lines at
Leinster, Fimiston.
Repalcing worn 600 mm process line pipes and
spools, installing
knive valves, ball valves, elbows.
Constructing 85nm process water lines, installing 45nm air
lines,
assisting in the construction and installation of
Poly pipe lines. Replacing worn pipe lines with new.
1984-19854 Recar Australia truck smash repairs
Mulgrave Division
Victoria
• Truck rebuilds and reapirs of trailers, cranes,sand trucks and car
smashed car carriers.
1981-1983 Johns and Waygood Cheltenham
• Apprentice Structural Steel Fabricator in Cheltenham Victoria
Fabrication of Major and Minor steel work from heavy steel Power
stations, Fixed Plant structures, stairways and platforms.
Education and Qualifications
1983 Metal Fabrication
Frankston TAFE
Metal Fabrication
2011 Blue Dog
Nationally accredited White Construction Card .
Working at Heights.
Licences
• Motor Vehicle - Heavy Rigid vehicle - WA
Referees
Rob Guy Nada Red8
Maintenance Supervisor BGC Fibro Cannington. 94177799
93344900 042*******
Craig
Ativo shutdown Supervisor