Post Job Free
Sign in

Technician Power Plant

Location:
Fort Lauderdale, FL
Posted:
March 23, 2014

Contact this candidate

Resume:

A. D. Paynes

ALARA Coordinator/ Senior Health Physics Technician

Social Security # XXX-XX-3515

Summary

Thirty years Lineman helper, Transmission, distribution, and ALARA /Radiation

Protection technician experience.

Education/Training

Glen Oaks High School

Graduate

Helper T&D Maintenance School

INPO Accredited Radiation Protection Technician.

Medical Emergency First Responder

Experience

High level experience with software programs, HIS-20, Microsoft Excel, Word,

Power Point.

3/9/14-

present Turkey Point Sr Health Physics Technician

Refuel Floor.

11/12/11- GGNS (Crane Nuclear Co.)

11/28/11 ALARA Coordinator

Duty: Setup and implement an ALARA program for Crane Nuclear

Co. for GGNS outage.

Duties also included: Writing /Planning/ Determining person-rem and person-hour

budgets for RWP’s. Writing the budget basis for RWP’s. Planning and writing

shielding packages. Meetings with work –week management for outage dose

budgets.

Kewaunee Nuclear Power Station (Bartlett)

7/25/11-

11/10/11 ALARA Technician Planning

Duties include: Writing /Planning/ Determining person-rem and person-hour

budgets for RWP’s. Writing the budget basis for RWP’s. Planning and writing

shielding packages. Meetings with work –week management for outage dose

budgets.

.

A.D. Paynes - page 2

6/27/11 - Kewaunee Nuclear Power Station (Bartlett)

7/25/11 Senior Health Physics Technician

Duties included : job coverage and surveys, ISFSI

5/2/11 - Quad Cities Nuclear Power Plant (Bartlett)

5/20/11 Senior Health Physics Technician

Duties included: Turbine building, job coverage and surveys.

4/18/11 - Braidwood Nuclear Generating Station (Bartlett)

4/30/11 Senior Health Physics Technician job coverage and surveys.

3/27/11 - Limerick Nuclear Generating Station (Bartlett)

4/15/11 Senior Health Physics Technician

Duties included: Refuel floor, removal of separator, dryer rad surveys, remote

monitoring.

3/9/11 - Byron Nuclear Power Station (Bartlett)

3/25/11 Senior Health Physics Technician

Duties included: Scaffold surveys in cont.

1/31/11 - LaSalle County Nuclear Power Station (Bartlett)

3/4/11 Senior Health Physics Technician

Duties included: ALARA, drywell post and pre shielding surveys.

10/27/10 - Dresden Nuclear Power Station (Bartlett)

11/24/10 Senior Health Physics Technician

Duties included: Main steam low pressure heater replacement turbine deck –

support work for turbine rotor replacement.

8/31/2009 - Clinton Nuclear Power Station (Bartlett)

9/24/10 ALARA Technician

Duties included: Station ERO dose assessor. Stay times and dose calculation for

various locked/high radiation areas. Rad monitoring for RHR piping cut out.

Assisted with writing various shielding packages. Conducted locked high rad and

high rad briefs.

3/15/2009 - Monticello Nuclear Generating Plant

4/20/2009 Senior Health Physics Technician

Duties included: Main Condenser core piping replacement.

2/16/2009 - Perry Nuclear Power Plant (Bartlett)

3/6/2009 Senior Health Physics Technician

A.D. Paynes - page 3

Duties included: Lead tech at steam tunnel, main steam line pipe replacement.

9/2/2008 - Prairie Island Nuclear Generating Station

10/27/2008 Lead Technician

Duties included: Steam Generator Inspection.

9/2/1988 - River Bend Nuclear Power Station

8/7/2008 Radiation Protection Technician

Duties included: Responsible for monitoring/controls of radiological conditions

throughout the plant. Performance of routine and periodic dose rate and

contamination surveys. Airborne radioactivity sampling. Performance of job

coverage surveys to support maintenance, specifically CRD change out,

IRM/SRM change out under vessel, Diving operations both in Spent fuel and

Suppression pools, Recirc pump seal replacement, Recirc motor replacement,

SRV replacement, Work inside Bioshield performing nozzle inspections and

flushes, inspection of irradiated fuel bundles and individual fuel pins including

crud scraping, all other Drywell activities at a BWR. Steam generator Eddy

current testing support, Pressurizer heater replacement, Steam generator

secondary side inspections and sludge lancing, all other D-ring activities at a

PWR. Responsible for the calibration and maintenance of contamination

monitoring equipment, hand held survey meters, and miscellaneous hand held

equipment. Responsible for the maintenance of camera and telemetry equipment.

Responsible for processing Radioactive and Hazardous wastes. Responsible for

Shipment and Receipt of Radioactive Material. Writing and review of Radiation

work permits. Issuance of personnel dosimetry, mask fits, and whole body

counting. Responsible to perform necessary actions as required by the plant

Emergency plan. Decontamination supervisor responsible for oversight of 6

people during refueling outage. (Acting). ALARA/RWP Planner. Planning and

writing RWP’s/shielding packages for various high dose areas.

ALARA/RWP Planner (1/3/98-1/3/2000)

Duties included: ALARA representative for work week management meetings.

Planning and writing RWP’s. Writing shielding packages for various high dose

areas.

Twenty Years of experience working with H15-20 and Microsoft programs.

Generated ALARA plans as needed for work orders. Also provided oversight for

mock-up activities during outages.

9/21/1981- Gulf States Utility Co

9/2/1988 Lineman Helper/Transmission/Distribution

Duties included: Responsible for assisting Lineman in the repair and constructing

of overhead and underground power lines.



Contact this candidate