Sandeep Gupta
Convenience
Contact: +27-733****** (M), Skype - sandeep.gupta421
E Mail: *******@*****.***, Web -
www.linkedin.com/profile/view?id=17859579&trk=tab_pro
Seeking senior level assignment in Project Control / Project Management /
Design Review and Coordination Activities in an organisation of high
repute.
Synopsis
< Seasoned professional with more than 19 years of experience in the field
of Project Controls and Project Management of large scale Energy &
Infrastructure Projects.
< Presently associated with Tata Consulting Engineers Limited as Assistant
General Manager (Planning), and working as Forensic Planner in FIDIC Team
at Medupi Power Station, 4800 MW Thermal Power Plant Located in South
Africa.
< Adept in project planning using Primavera (P6), and spearheading
construction projects involving method engineering, project performance
management using earned value technique, construction delay analysis by
using window analysis and time Impact analysis.
< Proficient for all project engineering related activities such as design
review, technical coordination & finalisation of project specific
specification, 3D modeling of Plant by using Auto CAD etc.
< Demonstrated abilities in effective work planning, budgeting and planning
as well as implementing various cost control measures.
< Expert communicator with strong interpersonal, organizational, and
communication skills. Able to clearly and concisely convey complex
technical information.
Core Competencies
Project Planning & Management
< Complete Project planning, scheduling and preparation of project baseline
schedule using Primavera (P6).
< Monitoring & controlling the projects time schedule and cost by
continuous tracking the project throughout the life cycle of project.
< Post contract schedule management, construction delay analysis by using
window analysis and time Impact analysis method and claim settlement.
< Project cost control by preparing & monitoring cost baseline using earned
value analysis and informing management about cost variance on regular
basis.
< Providing weekly / monthly target to execution team, and to ensure
execution of projects within the set time.
< Generating Project Progress Report, preparation of S curve (baseline,
actual and catchup plan) as well as coordinating with various
consultants, suppliers.
< Insuring the operations to be within cost & time norms; participating in
project review meetings for evaluating projects progress.
Resource Planning & Control
< Planning the resources, identifying resource needs & timely deployment of
resources, identifying resource allocated areas.
< Monitoring & control of resource utilization and productivity, to ensure
smooth execution of projects.
Project Engineering
< Structural designing of residential / commercial / public buildings using
Staad Pro.
< Preparing 3D model of complete power plant to explain the construction
sequence according to project schedule to all stakeholders.
< Preperation and finalizing engineering drawings & specification,
preparation of BOQ & tender documents.
< Review & release engineering drawing perform engineering design change
(if required), conduct and/or coordinate for detailed design and
drafting.
< Engineering coordination with site execution team & external consultants
to resolve site related issues for smooth operation of work.
Employment Recital
Since Nov 2012 working with Tata Consulting Engineers Limited as Assistant
General Manager (Planning) and posted as Forensic Planner in FIDIC Team at
4800 MW Thermal Power Plant located in South Africa.
Responsibility:
< Responsible for developing and monitoring master schedule using Primavera
(P6) for 4800 MW thermal power plant including all BTG & BOP area.
< Post contract schedule management, construction delay analysis by using
window analysis and time Impact analysis method and claim settlement.
< Compliance of contractors master and delivery schedules with master plan
and critical path. Recommends action to mitigate any deviation from
master plan.
< Coordinate work with all disciplines such as civil, mechanical,
electrical, commissioning etc. and trouble shooting of onsite problems.
July 2010 to Oct 2012 with Indiabulls Power Ltd. at Amravati Thermal Power
Plant as Assistant General Manager (Planning).
Project:
< 2700 MW (Phase 1 -1350 & Phase2-1350) Thermal Power Plant including
external works (railway siding, water intake system etc.) located at
Amravati, Maharashtra, India.
Responsibilities:
< Responsible for planning, scheduling and preparation of complete L3 level
baseline schedule using Primavera (P6) for 2 no. (1350X2) MW Thermal
Power Plants Located at Amravati & Nasik. Maharashtra, India.
< Monitoring the progress of projects and comparing it with baseline
schedule, prompting for delays and initiating catch-up Plan.
< Organizing and controlling the material procurement schedule, expediting
the procurement of materials which are required on an urgent basis.
< Generating MIS, weekly / monthly progress reports.
< Team building and training of existing subordinates.
Attainments:
< Prepared a complete baseline schedule for 2 No 1350MW Thermal Power Plant
using Primavera (P6) and continuously monitoring the progress of work and
prompting for delays and fixing monthly targets according to catch-up
plan.
Jun 2008 to June 2010 with Reliance Infrastructure Ltd., (NOIDA) as Senior
Manager (Planning & Coordination)
Project Executed:
< Project Planning and Monitoring (using Primavera P 6.1) of Civil Work for
1200 MW Thermal Power Plant & Construction of township for employees of
1200 MW thermal Power Plant located at Rosa, Shahjahnapur, (UP), &
enabling works for 4000 MW Thermal Power Plant at Sasan, (MP), including
engineering coordination with various external agencies.
Responsibilities:
< Responsible for planning & finalizing the construction methodology.
< Managing the resource for all activities with Primavera Project Planner
version 6.1 and preparing master schedule (baseline schedule) in
coordination with all internal & external agencies.
< Monitoring projects with baseline, prompting for delays and initiating
recovery programs.
< Forecasting the resources required for catch-up plan whenever necessary.
< Generating weekly / monthly progress reports.
< Organizing and controlling the material procurement schedule, expediting
the procurement of materials which are required on an urgent basis.
< Gathering the information regarding availability of materials from
different sources & preparing comparison statements.
< Reviewing the engineering drawings & introducing engineering design
changes (if required).
< Coordinating detailed design and drafting operations.
< Collaborating with site execution team & external consultants for
resolving the site related issues for smoother operations.
< Generating BOQ, creating purchase requests, monitoring work orders &
service entry using SAP (MM Module).
< Crosschecking the status of work / purchase orders and payments made
against them.
Attainments:
< Prepared a complete recourse loaded baseline plan using Primavera (P6)
for construction of complete township of 136 acre area consisting of 370
residential units, hostel, guest house, school, hospital, club, shopping
center, temple & all related services & infrastructure.
< Complete sructural design & preperation of drawing of all residential,
commercial and school etc buildings of township for employees of 1200 MW
thermal power plant.
Dec 04 to Jun'08 with Reliance Industries Limited
1-May 07 to Jun'08 with Reliance Retail Ltd., (Amritsar) as Senior Manager
(Civil)
Responsibilities:
< Worked as Project in-charge for construction of retail infrastructure
(big format, hypermarket, reliance town centers) in Amritsar & Ludhiana,
Punjab.
< Executing the construction work with adherence to the standard operating
procedures.
Attainments:
< Successfully completed and handover Reliance Hyper mart and Reliance
Footwear Stores at Amritsar & Ludhiana, & various Reliance Fresh store at
Amritsar Dist.
2- Dec O4 to April 07 with Reliance Engineering Associates Pvt. Ltd.,
Allahabad as Territory Project Manager
Project Executed:
< Constructing new retail outlets (Petrol Pumps) for Reliance Petroleum at
Allahabad (Dist.), UP.
Responsibilities:
< Completing the construction work in planned time with required quality.
Attainments:
< Successfully completed and handover to client (i.e. Reliance Petroleum)
11 Petrol Pumps in Allahabad region.
Nov'98 to Dec 04 with Gupta Associates, Lucknow as Construction Manager
Projects Executed:
< Construction Manager for Various Industrial (Oil Depot & Petrol Pumps),
Residential & Commercial Projects for M.E.S., Indian Oil Corporation
Ltd., Hindustan petroleum Corporation Ltd., IBP Ltd. and Reliance
Engineering Associates Pvt. Ltd.
< Construction Manager for Construction 10 Storied Shopping Mall &
Multiplex under Consultancy of Ar. Hafeez Contractor, (costing INR 55
Cr.).
< Project Management Consultant for Commercial & Residential Projects.
< Structural designing for Several Commercial & Residential buildings.
< Surveyor/ Loss Assessor for Immovable Property Several Industrial,
Commercial & Residential Projects.
Attainments:
< Completed many construction projects as a contractor for M.E.S., Indian
Oil Corporation Ltd., Hindustan petroleum Corporation Ltd., IBP Ltd. and
Reliance Engineering Associates Pvt. Ltd.
Dec'94 to Oct'98 with Gangotri Enterprises Ltd., for Power Plant owned by
Gas Authority India Limited located at Pata, Etawaha and Cement Plant
Owned by Associated Cement Company Ltd. located at Amethi, UP, as
Construction Manager
Site Engineer for Earth Work for Area Grading & Construction of 175
Residential Units for Township of Gas Authority India Ltd., Dibiapur
Duration: Dec'94 to Mar'97
Construction Manager for construction of Non Plant Buildings, Internal
Roads and Earth works" at Associated Cement Companies Ltd., Tikaria
Industrial Area, Dist. Amethi, under Consultancy / Supervision of Tata
Consulting Engineers.
Duration: Apr'97 to Oct'98
Attainments:
< Executed the project costing Rs. 8 Cr. in given time frame with required
quality.
Certification
< Surveyor/ Loss Assessor for immovable property approved from Ministry of
Finance from Govt. of India in year?
Academia
< B.E. in Civil Engineering from Amaravati University, Maharashtra in 1994
with 62.3%.
IT Skills
< Well versed with Primavera P6, MS Project (for project planning &
control), STAAD Pro (for Structural Designing), Auto CAD (for
architectural drawing), SAP (Material Management Module) & familiar with
AutoCAD Civil 3D (For Master Planning).
Membership
< Member of Institution of Engineers (India).
< Member of Institution of Valuers (India).
Personal Details
Date of Birth: 4th February 1973
Passport No.: H-7438033
Permanent Address: F 102, Indrlok Colony, Krishna Nagar, Lucknow:
226023, (U.P), India, Ph 052*-*******