Post Job Free
Sign in

Project Power Plant

Location:
Quezon City, NCR, Philippines
Salary:
1200 US dollar
Posted:
March 14, 2014

Contact this candidate

Resume:

INSTRUMENT FOREMAN

Name : RODELIO NISAY

Address : 717B Banawe, Quezon City, Philippines

Mobile No. : +639*********(Phil.)

Telephone No. : +637436008(Phil.)

Passport No. : EB2677997

Email Add. : mailto:************@*****.***

PERSONAL DATA:

Date of Birth : January 3, 1957

Place of Birth : Balanga, Bataan, Philippines

Civil Status : Married

Nationality : Filipino

Gender : Male

Religion : Roman Catholic

Languages : English and Tagalog

EDUCATIONAL QUALIFICATION:

Primary : Cupang Elementary School

Cupang, Balanga, Bataan

1964-1970

Secondary : Tomas Del Rosario Academy

Balanga, Bataan

1964-1970

Tertiary : Feati University

Sta. Cruz, Manila

Marine Engineering

1976- 1978

OBJECTIVE: To apply and utilized my work experienced in a much challenging

role where my capabilities may lead to expertise in the field of

instrumentation.

WORK EXPERIENCES:

PROJECT: TAKREER RUWAIS REFINERY EXPANSON 7(MARINE OFFSHORE)ABU DHABI

COMPANY: DONG YEONG/G.S. ENG'G E/I

POSITION: INSTRUMENT FOREMAN

DURATION: JUNE 28,2012 to DECEMBER 05, 2013

DUTIES AND RESPONSIBILITIES:

Comply safety measures precautions at all times. Planning the schedule of

work one week ahead..Discuss all necessary woks to my superior. Give the

instructions of work to my foreman or co-workers. Handles other related

task assign by my superior.

Objective: To apply and utilize my work experience in a much challenging

role where my capabilities may lead to technical expertise in the field of

Instrumentation.

WORK EXPERIENCES:

PROJECT: QATAR FERTILIZER COMPANY EXPANSION (QAFCO)

COMPANY: DONG YEONG/ HYUNDAI ENG'G & CONST.

POSITION: INSTRUMENT FOREMAN

DURATION: AUGUST 18, 2011 to JUNE 28, 2012

DUTIES AND RESPONSIBILITIES:

Comply safety measures/precautions at all times. Work on several

installation of cable tray and conduit .Knowledgeable in installation of

tubing,impulse line and leak testing. Give assigned work to my co-worker.

Time management.

WORK EXPERIENCES:

PROJECT : Independent Water Power Plant (IWPP)

COMPANY : Dong Yeong, Bahrain / Hyundai Heavy Industries

(HHI)

POSITION : Instrument Foreman

DURATION : March 03, 2010 to March 31, 2011

DUTIES AND RESPOSSIBILITIES:

Doing take-off for the activities along with foreman. Discuss all

installation and fabrication job to the foreman. Discuss the problems

in the site and monitor daily progress .Forwarding list/name locations of

all crew member before starting the job to superiors. Planning the schedule

of work one week ahead and discuss al necessary access like scaffolding and

hot work activities. Giving the target dates completion to the foreman.

Supervision of all instrumentation works which includes but not limited to

installation, pre commissioning. Knowledge in Instrument Installation for

gas turbine, steam turbine, duct burner, diverter damper, main and bypass

stack. Handles other related tasks as assigned to me by my superior.

WORK EXPERIENCES:

PROJECT : Sohar Aromatic Project (SAP)

COMPANY : Oman Eng'g Co. / GS E&C .

ADDRESS : Sohar, Sultanate of Oman

POSITION : Instrument Foreman

DURATION : July 16, 2009 up to February 28, 2010

DUTIES AND RESPONSIBILITIES:

Knowledgeable in reading P & ID and hook up drawing. Knowledgeable in

instrument installation, impulse line and fault findings activities. Assist

in the preparation of pre-commissioning and commissioning procedures.

Worked on several different applications of Instrumentation and control

systems.

WORK EXPERIENCES:

PROJECT : Sohar Aromatic Project (SAP)

COMPANY : Hanyang Corporation

ADDRESS : Sohar, Sultanate of Oman

POSITION : Instrument Foreman

DURATION : September 4, 2008 up to July 15,

2009

DUTIES AND RESPONSIBILITIES:

Comply safety measures / precautions at all times. Knowledgeable in reading

P&ID and hook up drawing.

Knowledgeable in instrument installation, tubing, impulse line and leak

testing. Assigned in QC department for pre-commissioning / testing. Time

management. Punch list clearing.

WORK EXPERIENCES:

Project : RL (3) Common OFF plot Projects for Ras

Gas (Condensate and LPG

Tanks Phase 1 & 2) under CBI /

Flour Arabia main contractor

: Ras Laffan B Power and

Desalination Plant

Under Siemens / Ansaldo main

contractor

Company : Comsip Al A! Ali Cegelec

Address : Ras Laffan Industrial City, Qatar

Position : Instrument Foreman

Duration : Sepiember 25, 2005 up to April 28, 2008

DUTIES AND RESPONSIBILITIES:

Comply safety measures / precautions at all times. Knowledgeable in

Instrumentation and Electrical job .

Knowledgeable in quality and competiting job. Time management.

Knowledgeable in reading P & ID / Hook-Up Drawing. Knowledgeable in

instrument fitter / technician ( instrument installation, manifolds, tubing

and impulse line leak testing & termination )Knowledgeable in fabrication &

welding job ( installation of cable trays, ladders/perforated at any sizes,

offset making, support & brackets stanchion making )Assigned in QC

department for pre-commissioning / testing. Punch list clearing.

OTHER WORK EXPERINCES:

Project : Saudi Aramco Ethane Recovery

Project

Company : Asyad Int'l. Co. / Saudi Arabia

Address : Berri Gas Plant, Jubail Saudi

Arabia

Position : Instrument Fitter

Duration : January 19, 2002 up to August 15,

2004

DUTIES AND RESPONSIBILITIES:

Comply safety measures / precautions at all times. Installation of raceway

and cable tray. Airline pipe installation (header to branches) .Conduiting.

Installation of instruments like level gauge, pressure transmitter, flow

transmitter, pressure gauge, level transmitter and many others.

Fabrication of panel rack and JB supports. Installation support of cable

trays, tubing and conduits. Tubing.

WORK AND EXPERIENCES:

Project : Nodco Refinery Expansion Project

Company : Shinwha / Dong Yeong Eng'g & Const. Co.

Address : Doha, State of Qatar

Position : Instrument Fitter

Duration : August 23, 2000 up to September 04, 2001

DUTIES AND RESPONSIBILITIES:

Comply safety measures / precautions at all times. Cable tray installation.

Fabrication stanchion and install according to location drawing. Air pipe

installation from header to branches based on drawing schedule. Alignment

of marshalling panel. Instrument installation like pressure transmitter,

flow transmitter, level transmitter, pressure gauges, temperature gauges,

thermocouple, level switch and many other. Tubing like steam tracing, flow

transmitter, pressure transmitter, pressure differential transmitter and

control valves based on hook-up drawing. Junction box rack fabrication and

installation. Installation of support of the cable tray, air line pipe and

tubing. Installation of junction box based on location drawing schedule.

Cable duct installation.

WORK AND EXPERIENCES:

Project : Formosa Petrochemical Corporation

Company : Samsung Engineering & Construction Co. LTD.

Address : OL1 & OL2 Project B Site No. 31-200, HSU-CUO

San Sheng Cun Mailaiao Country, Yuanlin Province,

Taiwan, R.O.C.

Position : Instrument Fitter

Duration : April 10 1997 up to April 07, 2000

DUTIES AND RESPONSIBILITIES:

Comply safety measures / precautions at all times. Installation of raceway

and cable tray. Installation of conduit and airline pipe. Instrument

installation like pressure, level and flow transmitter, temperature,

pressure and gauges, thermo element, pressure differential transmitter and

others related to its proper location, based on location and engineering

specification as stated. Steam tracing or impulse tube. Tubing of flow,

pressure and pressure differential transmitter according to hook-up

drawing. Installation of air supply line from header to designated tap

point such as control valves, pneumatic type transmitter and emergency

supply vessel for emergency shutdown valves. Panel rack installation in the

control room and alignment of marshalling panel. Cable duct installation.

WORK EXPERIENCE:

COMPANY: MATTEL PHILIPPINES INC.

POSITION: LINE LEADER

DURATION: JUNE 01, 1979 to AUGUST 15, 1985

DUTIES AND RESPONSIBILITIES:

Mounting and dismounting the mould in the injection machine. Check the low

pressure. Clean and lubricate the mechanical safety lock. Removal of all

clamping bolts and knots. Measure the clearance of stationery and movable

platen. Dismounting of heat exchanger. Check all machine safety features

like mechanical, electrical, and hydraulic.

[pic]



Contact this candidate