David Anderson

***** ****** ****

Brooklyn Park, MN 55443

Phone 763-***-****

Cell 612-***-****

E-Mail: ************@*****.***

Summary:

. Extensive hands on expertise for Capacity Planning and Scheduling

Inventory.

. Experienced with Inventory planning and ordering of materials to support

production.

. Experienced in generating and maintaining bills of materials for all

contracts.

. Expertise in the generation and maintenance of the Master Schedule.

. Developed the Master Schedule for manufacturing balancing available

capacity and actual capacity available and made recommendations for any

adjustments that needed to be made.

.

Skills:

. Proficient in MS Suite

. Proficient with SAP/ ERP

Education:

. Dassel High School, Dassel, MN, 1956

. University of Minnesota 2years

Certification:

. Certified in Production & Inventory Management (CPIM), 1990

Experience:

Anderson Properties

Mar

11 - Present

Owner and management of Rental town homes and Sales of residential homes

Circuit Check, Plymouth, MN

June 09- Mar 11

Senior Planner/ Scheduler

. Responsible for setting up the manufacturing module in Vantage ERP system

. Worked with engineering to establish operation sequences and reviewed and

update process times.

. Created or updated production equipment which was used in the manifesting

process.

. Established work cells to identify production flow and capacity time

available.

. Set up standard bills of material for product families.

. Set up labor reporting format for operators input of accomplishments.

. Set up dispatch list by work center and priority logic.

. Set up training manuals and trained operators and management on use of

system.

Nilfisk Advance, Plymouth, MN

Apr 07- Aug 08

Senior Scheduler/ Planner

. Released production orders to assure that shipment schedule would be

made.

. Assign production due dates for all orders.

. Planned capacity to accomplish master schedule.

. Determine priority for each factory production group.

. Answer questions from Customer Service on status of orders.

Boston Scientific, Plymouth, MN

Apr 06- Jan 07

Senior Planner/ Scheduler

. Set up Engineering Lab manufacturing scheduling system using Microsoft

Excel and SAP ERP system downloading orders from four engineering systems

to determine gross requirements for quantity and process time.

. Established program priorities by working with engineering development

and program managers to meet product roll out time lines.

. Developed the Master Schedule for manufacturing balancing available

capacity and actual capacity available and made recommendations for any

adjustments that needed to be made.

. Held weekly meetings with each engineering group to report status on

existing product line orders, delivery estimates and estimated cost and

actual cost status. And priorities from each engineering group.

. Gave work direction to Lab production supervisors for priority of work

orders currently in process

. Responsible for raw material and finished stock inventory records and

program transfers for all engineering programs.

Lockheed Martin, Orlando, FL

Sep 02- Jan 06

Master Scheduler Special Weapons

. Responsible for the creation of the Master Schedule using SAP for

production and inventory control and Microsoft project for planning labor

and priorities for Electrical and Mechanical design.

. Used Microsoft Project as a reporting tool for reporting schedule status

and cost status to Air Force.

. Chaired program status meetings for program managers weekly reporting on

status and problems for each program.

. Maintained schedule milestones and progress against those milestones to

the DOD representatives.

. Maintained cost earned hours to measure the status of project cost

against accomplished schedule work.

. Co chaired a cost reduction group of engineers and production people to

improve processes and better production flow to save time on schedules

and cost of product.

Ocean Design Inc, Ormond Beach, FL

Oct 94- Jul 02

Manager Material and Production Planning

. Responsible for the Capacity Planning and Scheduling group of 8 people to

determine delivery promises for all Customer orders balancing available

capacity and material against Customers requirements.

. Represented manufacturing in meetings to review large incoming new orders

with engineering and sales to develop time and estimating labor and

material cost to accomplish the required date.

. Reviewed the Master Schedule in IFS to determine the impact if any on

existing orders and recommend any changes to the schedule to accomplish

the best date.

. Improved on time delivery of product from 80% to 90 + % using lean

manufacturing scheduling techniques and installing shop floor control. .

. Core team member for installation of ERP system IFS, team leader for

manufacturing to determine the existing business process that were being

used and modifying those practices to improve manufacturing thru put and

improve quality.

. Fully qualified in the operation of Advanced Planning Systems, including

MS Excel, Access and power point.

Honeywell/ Alliant Tech Systems, Hopkins, MN

Sep 70- Apr 94

Master Scheduler/ Master Planner

. Managed a staff of 7-10 Production

. Control people responsible for the scheduling, Inventory planning and

ordering of materials to support production.

. Responsible for generating and maintaining bills of materials for all

contracts.

. Signed off on ECO's for all contracts and implementing them into existing

schedule.

. Responsible for the generation and maintenance of the Master Schedule and

for the production plans using Kanban and lean manufacturing scheduling.