Seeking a position in Field Development Dept. for a large corporation with
an international interest. I have extensive & highly diversified
experience and knowledge of production enhancement, Well modeling /
performance, and troubleshooting in Drilling, Workover, Completion, Well
Testing, Well Integrity, Well Intervention, Artificial Lift, Sand control
etc.
02- Summary of experience:
More than 30 years of experience include:
. Almost one year of experience with GDF Suez Qatar / Contract /
Rotation/ Part Time.
. Almost 6 months of experience with Saudi Aramco / Contract / Rotation/
Part Time.
. Almost 2 years of experience with KOC, Kuwait.
. 4 years of experience with PETRONAS, KL, Malaysia.
. 25 years of experience with ZADCO, Abu Dhabi, UAE.
. 5 years of experience with PETROBEL, Egypt.
03- Technical Career Summary (Post Occupied):
From To Post Occupied Division Company Location
Jan, Till Completion & Well Drilling Dept. GDF Suez QATAR
2013 now Testing / DST / TCP
Supervisor
Apr, Sep,201 Workover & Completion Gas Drilling and Aramco Saudi
2013 3 Engineer Workover Dept. Arabia
Mar Oct Petroleum Engineer SEK Petroleum KOC Kuwait
2010 2011 Consultant Development
Nov Mar Staff Well Completion Drilling Dept PETRONAS Malaysia
2006 2010 Engineer
May Nov Sr. Well Engineer UZ Field Development ZADCO Abu
2002 2006 Dhabi
Mar Mar Sr. Sub-surface SU Field Development ZADCO Abu
1998 2002 Supervisor Dhabi
Jul Mar Well Engineer Petroleum ZADCO Abu
1993 1998 Development Dhabi
Nov Jul Well Engineer Drilling Department ZADCO Abu
1983 1993 Dhabi
Jun Nov Well Supervisor Drilling Department ZADCO Abu
1981 1983 Dhabi
Jun Jun Work-over and Completion Drilling & Work-over PETROBEL Egypt
1979 1981 Sup'v Dept
Jan Jun Field Petroleum Engineer Petroleum PETROBEL Egypt
1977 1979 Engineering Dept
04- Handling Projects / Special Task Force:
From To Project Title Field Company Comment
Apr, Till HPHT GAS FIEDL HARAD GAS ARAMCO Completed two
2013 now DEVELOPMENT FIELD wells
Jan, Jan, Block 4 EPSA,to explore North GDF SUEZ Completed two
2012 2013 Pre-Khuff and Post-Khuff Qatar wells.
sections.
April, Oct, Smart Field, Digital SEK, On KOC Completed 55
2010 2011 Oilfield implementation shore wells had been
with Weatherford as selected as a
third party. first stage as a
good candidates
for smart field
implementation./
one horizontal
well with Fiber
Optic had been
workedover.
Nov Oct Shut-in and Problematic SEK, KOC 50 Wells had been
2010 2011 Wells Onshore investigated &
selected as
workover
candidates
Oct Oct Smart completion with SEK, KOC 2 Wells have been
2010 2011 ICD / ICV / Fiber Optic Onshore planned
in Horizontal wells
May Nov Five years plan for SEK SEK, KOC 230 Candidates
2010 2010 ESP project Onshore wells
had been selected
from
14 GC
Nov Jan Subsea HP/HT Horizontal Mauretania PETRONAS (4Wells Hor. Dev.
2006 2010 Well Completion Atlantic + 2 Wells W/O)
Ocean & had been
Brunei completed as open
Gulf hole sand screen
Deepwater completion.
+ 700 M.
Mar Feb Selective Completion / Boker, PETRONAS 10 wells had
2008 2010 Sand Control Offshore, been completed
Malaysia in the first
phase
May Dec Well Testing of Turkismest PETRONAS 2 Wells had been
2009 2009 Exploration Well an, On tested
procedures, HP/HT, H2S shore
Gas Well
Jun Apr Casing While Drilling Malaysia, PETRONAS 3 Wells had been
2007 2008 Offshore drilled as a
pilot
2004 2006 Stimulation / PLT UZ, ZADCO 2Wells had been
Logging Taskforce of Offshore pilot tested
Horizontal Wells.
2002 2005 Well Integrity Taskforce UZ, ZADCO In continued Task
Offshore
2002 2005 Downhole Communication UZ, ZADCO Part of Well
problems Offshore Integrity
Taskforce
2002 2005 Gas Injection/ UZ, ZADCO 4 Gas injectors,
Artificial Lift Offshore 4 Oil producers,
Taskforce in Western 2 observers
area
2004 2004 High annulus pressure UZ, ZADCO Part of Well
study in oil producers / Offshore Integrity
water/gas injection Taskforce
wells
2003 2004 WHPT W.H/ X-tree valves UZ, ZADCO Part of Well
integrity Offshore Integrity
Taskforce
Mar Apr UA DALLKAH field ESP Umm ZADCO 3Wells on same
2003 2004 application task force Dalakh, WHPT had been
Offshore completed as ESP
Oil producers
2001 2002 Rigless Operation UZ, ZADCO Coiled Tbg
Taskforce Offshore Application
1991 1993 Feasibility Study of UZ, ZADCO One Well had been
utilizing jet pump in Offshore Pilot tested
Western area development
1990 1991 Wells abandonment UZ, ZADCO 5 WHPT had been
Taskforce for small Offshore cannibalized
mature fields
1988 1990 Artificial Lift Task UZ, ZADCO ESP / GL
Force Offshore
1987 1988 Completion Task Force UZ, ZADCO For Multi / Dual
Offshore lateral
Dec Aug Testing of KHUFF Gas Adnoc ZADCO 2 Reservoirs had
1982 1983 Wells Reservoir Block A&B, been tested
Offshore
Jan May Well intervention to Belaayim, PETROBEL 8 Wells had been
1977 1981 tie-in the Damaged wells Offshore completed as ESP
/ re-completed as ESP on Oil producers.
Offshore WHPTS
05- Areas of Exposures (Qualifications):
. Safety, Healthy & Environment.
. Well Construction.
. Well Control.
. Well Completion.
. Well Integrity.
. Work-over and Well / Field Abandonment.
. Steam Injection and/or Thermal wells - Heavy Oil.
. Rig less operation covering snubbing and hoists, wire-line, well logging,
well stimulation/pumping
(including use of coiled tubing).
. Well Intervention (Water Break through, Gas break through, etc).
. Well Testing (Oil, Water, Gas, HPHT, Horizontal, MLTI LATERAL, and H2S
Wells).
. Well Performance & Well Modeling using prosper.
. Well Stimulation, Acid Frac.
. Sand Control Management design, planning and execution of variety of
sand control completion types
(gravel pack, frac packs, expandable screens, stand alone screens).
. Wellhead maintenance / Well Integrity
. High Annulus Pressure in Oil, Water &Gas Wells / Well Integrity.
. Downhole Corrosion Management / Well Integrity
. Special Completion (Subsea, Deep Water, HPHT & Smart Completion)
. Artificial Lift Technology (ESP & GL, SRP, JET, CPC).
. Production Optimization in line of Reservoir Management guidelines.
06- Consultant Capability:
. Master for HSE and hazards of well control issues.
. Driving performance improvement by using appropriate "limit methodology"
tools and techniques (e.g. Realize-the-Limit: RtL).
. Risk identification and mitigation, logistics and QA/QC activities
assurance, and the monitoring and timely reporting of land/offshore based
on completion and intervention operations.
. Identify working limits, time and budget of the planned project.
. Learn the importance of adequate subsurface, surface equipment selection.
. Increase knowledge on the latest technology.
. Apply to growth field applications including, rigless operation.
. Overcome existing and future challenges in well design and operations.
. Improve planning, implementing, supervising of E&P projects.
. Improve company guidelines and procedures for well completions.
. Understand planning challenges of complex environments.
. Clarify well proposal / reservoir data / production data.
. Develop a strategy to monitor performances of existing wells.
. Avoid costly design mistakes and common practices.
07- References:
- Mr. Giuseppe Mennilli.
Well Testing and Operation Supt.
GDF Suez E & P Block #4 Qatar
Direct Line: +974-****-**-**
Cell Phone: +974-****-**-**
email: acb457@r.postjobfree.com
- Mr. Dawood Al Matar.
KOC, Ahmadi
KUWAIT Pet. Dev. Team Leader,
Cell Phone: +965********,
email:acb457@r.postjobfree.com.
- Dr. Paul R Rampersad, Ph.D.
Completion Engineer Sr.
BP Central USA.
38580 Mocking Bird Dr
Prairieville, Louisiana 70769 USA
Direct Line: +1-206-***-****
Cell Phone: +1-225-***-****
email: acb457@r.postjobfree.com
Location Time: US Central.
- Mr. Moustafa EL Refaie.
Drilling Engineering Manager
AL Hosn Gas Company
Direct: +971-*-***-****
Mobile: +971-**-*******
Email: acb457@r.postjobfree.com
08- Education:
Bachelor of Petroleum Engineering
Faculty of Engineering, Cairo University,
Egypt, July 1975.
09- Key Skills:
. Excellent communication, Interpersonal skills, sound business judgment &
Operate in multi-cultural, multi-national environment.
. Adhere to Company policies & guidelines.
. Strong analytical and quantitative skills.
. Long experience from multidisciplinary teamwork.
. A great facilitator with excellent presentation & reporting skills.
. Experienced with economic evaluation and risk assessment of different
projects.
. Undergone a number of training programs on technical and managerial and
safety aspects.
. Easy adaptable and very enthusiastic Co-operative and self-motivated.
As a person Skill:
. People skills * Quality Assurance focus
. Good understanding of the upstream E&P business
. Good understanding of reservoir geology and reservoir engineering
. Knowledge of well drilling and completion operations
. Good analytical and communication skills
. Fluent command of the English language.
10- Computer Skills:
. Normal computer skills; MS Word, Excel, PowerPoint, etc.
. Reservoir management software - Oil Field Manager (OFM).
. Schlumberger Database software - Finder.
. Petroleum Experts - Prosper, Gap for well modeling, etc.
. Schlumberger PIPESIM 2000 software.
. Landmark/ WellFlo, WellCat, WellPlan, Compass.
. Stimplan and/or FracPro software.
. Sub-pump software for ESP design.
11- Work Contacts:
. Internal frequent contacts to department heads/manager level.
. External contacts with Specialists Company Management, Consultants,
Shareholders and Well Engineering, Intervention experts & Contract
Services companies.
12- Independence of Operation:
Works in accordance with directives from my Manager, company policies and
professional engineering standards. Independent in development of
policy and procedures including company standards in the field of
well intervention & well integrity management. Fully independent for
technical evaluations and decision making, to lead my team and perform my
task.
13- Volume of Work Load:
Total number of project: 004 Projects:
. 2 projects are being under executing phase
. 2 projects are being under planning phase.
14- Professional Development - Training:
> Courses
Year Title Performed By Location
2011 Behavioral Based Safety & Safety UK Consultancy Group Kuwait
Observations and Conservations (SOC)
2010 The 2nd Artificial Lift Intelligence SPE International Egypt
for Production Optimization
2010 Artificial Lift Methods with a Focus SPE International Egypt
on Beam Pumping Practices for Oil &
Gas Wells in the Middle East
2008 HPHT Wells Planning Training Stuart Wright Training Malaysia
Academy
2006 Artificial Lift Systems Gulf Reservoir Abu Dhabi
Modeling Technology
2006 SPE Continuing Education Course SPE International Abu Dhabi
2005 Gas Lift PetroSkills Dubai
2003 Articial Gas Lift Techniques Gulf Reservoir Abu Dhabi
Modeling Technology
2000 Advanced First Aid course GTSC Abu Dhabi
2000 Introduction to FINDER ZADCO. Abu Dhabi
1998 Oil Spill Response Workshop ADNOC Pet. Authority Dubai
1998 Computer Application Al - Khuwarizimi Abu Dhabi
1996 Dea-67 Slim Hole & Coiled Tubing Well Services Abu Dhabi
Technology
1996 MS Execel 5.0 Application Emirates Institute of Abu Dhabi
Technology
1996 Freelance Application Emirates Institute of Abu Dhabi
Technology
1995 Corrosion Management Course Projacs. Dubai
1995 Computer Software Application Emirates Institute of Abu Dhabi
Technology
1993 Computer Application Al - Khuwarizimi. Abu Dhabi
1992 Sea Survival Viking Abu Dhabi
1991 Computer Application Al - Khuwarizimi Abu Dhabi
1990 Water Injection Technology Oil Plus Abu Dhabi
1989 Gas Lift Optimization Int'l Training & Abu Dhabi
consulting Inc
1988 Pumping Optimization of Oil Well Int'l Training & Abu Dhabi
consulting Inc
1981 Practical Well Testing Oil & Gas consultant Egypt
Int'l
1980 Oil and Gas Well Completion and Rick Services U.K.
Workover
> Conferences
Year Title Performed By Location
1998 Abu Dhabi International Exhibition Abu Dhabi
and Conference
1997 Drilltech' 97 Conference Institute for Dubai
International Research
1997 Artificial Lift Equipment (ALE' 97) Institute for Dubai
Conference International Research
1996 Abu Dhabi International Exhibition Abu Dhabi
and Conference
1994 Coiled Tubing Forum Dowell- Schlumberger Dubai
> Certificates
Year Title Company Location
2011 Service Award KOC Kuwait
2011 Certificate Of Appreciation KOC Kuwait
(2010-2011)
2010 Service Award PETRONAS Malaysia
2001 Long Service Award (20 years) ZADCO Abu Dhabi
1996 Long Service Award (15 years) ZADCO Abu Dhabi
1991 Long Service Award (10 years) ZADCO Abu Dhabi
1981 Service Award PETROBEL Egypt
1975 BSc. Petroleum Engineering Cairo University Egypt
15-Professional Affiliation:
. Member, Society of Petroleum Engineer (SPE), since 1982.
. Member, Society of Egyptian Petroleum Engineer since 1977.
16-Professional Experience Details:
16.1 GDF SUEZ
. Period: [From Jan, 2012, to Oct, 2013]
. Position: [Completion & Well Testing Supervisor, part time]
. Company: [GDF Suez, Qatar]
. Project Involved:
> Qatar Exploration Gas Field HPHT .
Block 4 EPSA,to explore Pre-Khuff and Post-Khuff sections.
16.2 Saudi Aramco
. Period: [From, Apr, 2013, till, now]
. Position: [Workover & Completion Engineer]
. Company: [Aramco, Saudi Arabia]
. Project Involved:
> Development of HRDH Gas Field /HPHT Well Completion / Well
intervention / Re-entry& Sidetracking
16.3 Mar, 2010 - Oct, 2011 "Petroleum Engineer Consultant" (SEK -
Petroleum Development Div.)
Kuwait Oil Company, Ahmadi, Kuwait.
Principal Accountabilities:
. Adhere to QHSE policy.
. Leverage on industry's best practices and share experiences.
. Implement Specialized Studies short, medium and long-term activities by
assessing project requirements and promoting the right up-to-date
technologies and collaborations with technology providers, research
institute, and partners, in order to enhance Production Technology
contributions to resource growth and maximize recovery.
. Initiate and plan the pacing and emerging technologies for new frontier
applications such as HPHT completion, High CO2 Field and Flow Assurance
through identification and evaluation of fit for purpose technologies in
collaborations with technology providers, research institute and partners
to achieve competitive advantage in order to enhance technical
capabilities and deliver highest standard of technical solution in
supporting global championship and corporate image.
. Carry out Specialized Studies technical matters and solutions to all
domestic and international operations by providing technical inputs and
regulating technical reviews in compliance with the technical standards
requirements for sound decision making in sustaining and achieving
successful Development projects.
. Artificial lift design (ESP, Gas lift, & SRP).
. Develops, evaluates and deploys new technology, provide consultation
and/or recommend procedures for well completions.
. Teaches in selected seminars / courses concerning well completion
technology related topics.
. Provides mentoring in house to trainees.
. Review completion design and performance to provide lessons learnt.
. Identify opportunity to implement alternative completion technology as a
pilot or trial for larger scale implementation.
. Submission of Statement of Requirements for 3 well types.
. Submission of Basis of Design for 3 well types.
The following scope covers from the sand face to wellhead:
. Completion design and feasibility.
Cost vs. benefit study based on budgetary pricing only.
. Risk assessments and managing risk register.
Quality Assurance Plan
. Material take-off list.
. Prove the financial benefits or otherwise to CLIENT via the application
of alternative completion designs.
. Provide a fully documented and risk assessed process for the selection of
the optimum completion concept.
. Recommend a Water Injector completion concept to meet the strategy
requirements.
. Water control (ICV, ICD etc).
. Material selection for design life.
. Instrumentation requirements (PDHPG, Wimax etc.)
. Perforating strategy.
. Tubing size.
. Surveillance options.
. Future workover practicality and techniques.
. Water Source Wells.
. Recommend a Water Source well completion concept to meet the strategy
requirements.
. Material selection for design life - casing and tubing.
. Sand face completion for potential sand control.
. ESP design (in conjunction with Well Surveillance Team)
. Recommend a Producer well completion concept to meet the strategy
requirements.
. Recommendation for dual completion opportunities and potential for trial
using EWPMP.
. Work with Well Surveillance Team and GC to ensure work is not completed
in isolation.
. Design to consider potential water shutoff/control requirements
16.4 Nov, 2006 - Feb, 2010 "Staff Engineer - CTE" (Well Completions
&Workover)
PETRONAS Carigali SDN. BHD. Co. - Kuala Lumpur, Malaysia
Position Details: COMPLETIONS ENGINEERING RESPONSIBILITES:
Completion Engineer creates fit-for-purpose completion designs for
offshore, deep-water, and land wells, conducts risk assessments, and
estimate probabilistic costs. They are also responsible for initial
well completion, walkovers, well intervention, and appraisal well
testing.
Job Responsibilities for this position include:
. Modeling completion performance.
. Performing stimulation technologies (for example, acidizing, fracturing,
water shutoff) based on well and reservoir diagnostics.
. Designing and installing sand control applications (for example, gravel
packing, frac packing, and consolidation, expandable or mesh rite
screens).
. Optimizing completion and work-over designs and operations.
. Designing, implement and supervise well testing programs for exploration
wells (Production Test and DSTs).
. Designing intelligent completions for horizontal and multilateral wells.
. Determining primary and remedial cementing procedures along with the
design and installation of tubulars, packers, subsurface control and
surveillance equipment.
. Evaluating and selecting appropriate equipment to achieve completion
objectives.
. Designing through tubing/concentric walkovers and intelligent
completions.
. Preparing cost estimates and risk in terms of probability and potential
remedies.
. Provides technical support to operating companies in the application of
sand control completions for all well types including vertical and
horizontal well applications.
. Participates as a technical resource on project peer reviews.
. Supports major capital project teams with early phase development concept
selection and design.
. Develops, evaluates and deploys new technology, provide consultation
and/or recommend procedures for well completions.
. Provides on-site support for implementation of completion procedures.
. Teaches in selected schools / seminars / courses concerning well
completion technology related topics.
. Provides mentoring in house to trainees.
. Participates in activities to help achieve objectives in such areas as
financial performance, portfolio development, customer feedback, quality,
safety, and environment.
16.5 Jun, 1981 - Oct, 2006, "Sr. Well Engineer Operation"
Zakum Development Co. (ZADCO) - Abu Dhabi, U. A. E.
About 25 years of experience as Sr. Petroleum Engineer in the reservoir
development of the largest worldwide offshore oil Field, Upper Zakum Field.
Of the two largest carbonate reservoirs of the field (Thamama-1A and
Thamama-II), (More than 500 producing and Injection Strings with 500
MBOPD).
Responsibility includes
. Design horizontal & multi lateral wells.
. Production operation in onshore/offshore overseas.
. Implement and supervise well testing programs (Production Test and DSTs).
. Well site supervision for workover, completion & well testing operation.
. Well diagnosis & well prognosis for further field development.
. Data acquisition for optimal reservoir and well performance.
. Optimizing well flowing performance using Pet, eng. Expert Software /
Prosper.
. Optimizing existing and new surface facilities.
. Well stimulation. & Acid Frac.
. Production well logging & wireline operations.
. Rigless Workover and Completion operations.
. Chemical treatments (Downhole corrosion inhibition, Scale inhibition,
Scale removal,)
. Artificial lift design (ESP, Gas lift, & hydraulic pump).
. Specify all the required equipment for all the above operation modes.
. Process all the CFTs procedures required for above equipment / operation.
. Preparing the required special studies for some of the above mentioned
phases, such as completion task force, artificial lift task force, rigless
work-over operations, and rigless well stimulation and well testing, gas
injection and gas lift down-hole communication problem, etc.
. Preparing annual and 5-year business plan.
. Following up/ and control budget and operational cost.
. Adhere to QHSE policy
16.6.1 Jun, 1979 - May, 1981," Workover & Completion Supervisor"
Belayim Co. Sinia Abu Redis "PETROBEL" - Egypt.
2 years of experience as a Drilling, Workover & Completion Supervisor with
PETROBEL, and a joint venture company between the Egyptian Government
(EGPC) and AGIP / ITALY, in Sinia fields. Some of these sandstone
reservoirs are producing naturally, where the reservoir energy is supported
by natural water influx or gas cap expansion, others are producing with
water flooding. Duties include:
. Full responsibility for conducting drilling, workover, completion &
stimulation.
. Preparing the drilling, completion & workover programs.
. Implement and supervise well testing programs (Production Test and
DSTs).
. Supervise cased & openhole logs.
. Selection of production / injection perf (s) intervals.
. Remedial jobs, water shut off & gas shut off & sand production.
. Revise and analysis stimulation and well testing operations.
. Prepare the materials/ budget for all above-mentioned phases.
. Supervise casing, liner & cementing jobs on shore / off shore rigs.
. Supervise a different artificial lift completions specially ESP, HYD.
PUMP & SR PUMP.
. Well diagnosis & discussing the downhole problems and find the best
solution.
16.6.2 Jan, 1977 - Jun, 1979, "Field Operation Engineer"
Belayim Co. Sinia Abu Redis "PETROBEL" - Egypt.
2 years of experience as a Field Pet. Engineer with PETROBEL, a joint
venture company between the Egyptian Government (EGPC) and AGIP / ITALY, in
Sinia fields. Some of these sandstone reservoirs are producing naturally,
where the reservoir energy is supported by natural water influx or gas cap
expansion, others are producing with water flooding. Duties include:
. Participating in informal operation teams with Field operation Engineers,
Drilling Engineers, and Projects Engineers to evaluate the economic ways
to complete the wells and the evaluation of the production and process
facilities.
. Issue periodical (semi-annual) reports to summarize the activities and
outlining the future plans in the fields.
. Maintaining database of the historical data for each well.
. Evaluate the pressure, production and injection performance of the
fields. Recommend the different development schemes. Study all the
possibilities. Carryout varies New technologies are accessed to bring the
fields into production with economic means.
. Well site witness all operation jobs:
> Rig & rigless Workover operations.
> Well completion jobs.
> Tie in well operation to production.
> Acid stimulation.
> Cased hole logging
> Well testing.
> Design/Implement/Analysis the required tests of the wells:
> Pressure tests (PBU, PFO, DDT, Static's, DST, RFT, Flowing Surveys,
> Production logging (TDT, Temperature & PLT).
. Analyzing and evaluating all kinds of logs (Open Hole Logs, Cased Hole
Logs)
. Recommending action plans for the daily activities based on the analysis
of the new data of the field.
. Design / Execute completion procedure.
. Responsibility include replacing Drilling Engineer on rig from time open
hole casing set until well on production
. Sharing in developing full daily operational plan.
. Experienced with economic evaluation and risk assessment of different
projects.
. Undergone a number of training programs on technical and managerial and
safety aspects.
. Easy adaptable and very enthusiastic Co-operative and self-motivated.
[pic]
MOHAMED SAID HABIB
Nationality: Egyptian / Canadian
Language: English - Fluent / Arabic - Native
Qualification: B.Sc. in Petroleum Engineering Jul 1975
Professional: More than 30 yrs in Oil & Gas Industry
E-mail: acb457@r.postjobfree.com
Tele: 001 403-***-**** (home Canada)
Mobility: Single - International.
Availability for Interview: Immediately.
Mobilization: One month notice.
Expected Daily Rate: Negotiable.