RESUME
SHIVKUMAR
PERMANENT ADDRESS: TEMPORARY
ADDRESS:
Door No 403, Room No 54,
S.S Patil Apartment, UVCE Boys
Hostel,
AIWAN-E-SHAHI Road, Behind City
Civil Court,
Gulbarga, Bangalore-01.
Karnataka.
E-mail: ****.*****@*****.***
Mobile No: +917*********
_
OBJECTIVE:
Intend to build a career with leading corporate of high tech environment and willing to work
with committed and dedicated people as a key player in challenging and creative
environment.
PERSONAL DETAILS:
Age & Date of Birth: 22 & 8th April 1991
Gender: male
Marital Status: Single
Religion: Hindu
Languages: English, Hindi and kannada.
Hobbies: playing Cricket, Football, badminton, Sudoko, listening music.
_
PROJECT WORK:
PROJECT TITTLE : PRELIMINARY DESIGN OF THE MODEL POSITIONING
MECHANISM FOR MICRO AIR VEHICAL AERODYNAMIC RESEARCH
TUNNEL
COMPANY NA M E : NAT IONAL AEROSPACE LABORATOR I ES
PROJECT D ESCR I P T IO N :
Model incidence system is an essential part of any wind tunnel and is used to Travers
the model over a range of pitch, roll and yaw angles to generate the force data using internal
strain gauge balance. Depending on the tunnel test section dimensions and proposed wind
tunnel tests on the models, different tunnels have adapted model incidence system suitable
for particular tunnel.
As a part of dissertation work preliminary design the model incidence mechanism
and computer control DC servo motor driven three degree freedom (pitch, yaw and roll)
model incident system has been for low speed wind tunnel of the test section 0.8 m (height)
x 1.2m (width) x 2.5 (length) rectangular cross section.
_
Software skills
1. AUTOcad
2. CATIA
3. ANSYS
4. CNC PROGRAMMING
5. CAD, CAM AND ROBOTICS
6. C, Basics of c++
Subject of interest
1. Material Science
2. Strength of materials
3. Engineering Drawing
EDUCATIONAL DETAILS:
Engineering profile: Mechanical Engineering, University visvesvaraya College of
Engineering, Bangalore.
EXAM YEAR % MARKS
Sem – I Sem – II Average
BE(Final year) 2012-13 66.9 73.9 70.4
Third year 2011-12 74.5 74.9 74.7
Second year 2010-11 70.2 68 69.1
First year 2009-10 76.1 67.7 71.9
AVERAGE 71.52%
PUC AND SSLC Profile :
Year of
% Marks Main Subjects
passing
Exam I nstitution
Physics, Mathematics
PUC 2009 77.2
Al-sharay College,
& Chemistry
SSLC Saint Ambrose Convent 2007 74.88 Mathematics, Science
High school, Wadi(Jn) & English
Gulbarga.
E xtra cur r icular activities
1. Won the Divisonal level Football in high school.
2. Passed “D rawing grade exam ” with fi rst class.
3. Organized cricket competition for f iesta i n the year 2011-12.
4. Attended 5 days of “Jungle t rekking camp ” conducted by al-sharay
college.
5. Represented Gulbarga D istrict at divisional level in cricket.
6. Organized “M ilagro-2013” as a co-
college biggest cultu ral fest
ordinator .
7. Won the int ra college cricket in the year 2012-2013
I HEREBY DECLARE THAT THE ABOVE WRITTEN PARTICULARS ARE TRUE TO THE BEST OF MY
KNOWLEDGE AND BELIEF.
SHIVKUM
AR