Piping /Project Engineer

KIRAN K. BORHADE Email: ac9wk2@r.postjobfree.com

Mobile – +91-997******* Passport No : M5147999

BAHRAIN RESIDENIAL PERMIT NO -841161631

Experience Summary

An experienced Piping/Project Engineer with an impressive track record of 9 + years in Piping engineering field such as Piping Design, Layout & detailing in Steam, Thermal Fluid, Oil & Gas, Dairy,Food grade, Pharmaceutical, Paint industries, HVAC etc. services

• Currently working in Arya Engineers & Contractors Pvt. Ltd. as a Asst. Manager Piping /Project. Seeking position to utilize my skills and abilities in an organization that offers professional growth while being resourceful, innovative and flexible.

Possess good technical skills with strong analytical, problem solving abilities. Been Appreciated by M/s.Ester Industries Limited .Uttarakhand for piping engineering works.

Results driven but diplomatic professional able to work effectively in team or independently. Professional Skills:

Job Function :-

Knowledge of Codes & Standred. (ASME, ASTM, API, IS, BS.IBR)

Piping Specification preparation (PMS) according to fluid and service along with Process Dept.

Study piping of whole plant for all above mentioned services.

Bulk and Final MTO Preparation and checking with reference of 3d model and Isometric Drawings.

Isometric drawing checking

P&ID Checking & Making. b) vendor GA drawing checking.

3D piping model checking along with P&ID and all necessary drawings and documents.

Factory inspector drawing Preparation & checking.

IBR Drawing checking.

Piping layout using Orthogen Software (in latest version).

Equipment layout Preparation & checking.

Civil information Layout & drawings Preparation & checking.

Nozzle orientations Preparation & checking as per piping routine.

Structural Drawing checking . GA drg. preparation

Primary & secondary support detail drawing preparation and checking.

Electrical cable tray along with rack system with out rack system & Substation Layout setting.

As Built Drawings Preparation & checking on site.

Site visit for Finalization of layout, kick of meeting along with vendor or client.

Man Power planning, Project activity planning

Project Scheduling for vendor, Client,Internal planning,Timing evaluation for Contractor.

Erection & Execution plan preparation

Site Supervision (if client will request)

Marketing for new projects. 2) All kind /type of Engineering work related to layout engineering, piping design work, civil & structure work. Software Proficiency:

CAD Works Plant Professional (3D Piping Modeling Software latest version ). CAD Works Equipment (3D Equipment Modeling Software latest version). NAVIS Works : (3D reviewer software latest version) AUTO CAD-2016,ZWCAD,BRICSCAD CADMATIC : Plant modelling software almost same as PDS PDMS.(only known during interview ill explain.

PDMS: Software known. software handled upto 15 day only.Need to practice or training. Present Employer:

Organization : ARYA ENGINEERS & CONTRACTORS PVT. LTD (Pune)

Designation : Piping/Project Engineer. (Actual working as a Assit Manager) Period : From 1 Jan 2010 to till date.

Project Experience :-

OVERSEAS HANDLED PROJECT’S .

1) ALBA GAS STATION : (Gas distribution project. HP side & LP Side. Project Location- Bahrain)

(Site Visited) HP Tapping did directly on live gas line (line size 400 NB) 1st largest project of Bahrain country.

2) TATWEER PETROLIUM : (Gas distribution project. HP side. Project Location- Bahrain) (Site Visited) HP Tapping did directly on live gas line (line size 400 NB) Project awarded based AGS Project. 3) KFCD MALL : (LPG Gas distribution in commercial mall.Mall is having 2 acre area. Project Location- Bahrain) (Site Visited)

4) ARMACELL : (LPG Gas distribution in Industrial Building . Project Location- Bahrain) (Site Visited)

5) BAPCO PETROLIUM : Revamping Piping work with piping Engineering . Project Location- Bahrain) (project completed at Site only as per stake holder requirement) 6) Mondelez International : Green Field project. worked as a Project manager Site, including Design and approvals from ministry.

7) KFCD Mall: Chilled water Plant room.

8) ALBA PUMP STATION : Utility Water Distribution in full Alba Factory. Project Location- Bahrain) 9) TLS Jetty : Unloading Arm At jetty. Project Location- Bahrain)10) Tebodin Consultancy : Design for LPG Bullet Tank & Connected Piping as a mobile skid Project Location- Bahrain) . ALSO OTHER 3 TO 4 PROJECT DID FOR OVERSEAS AND 2 PROJECTS ARE ONGOING.DURING INTERVIEW ILL EXPLAIN.

1) HPCL Ltd. (Refinary) – (Project Location-Mumbai-Honeywell & Jacob involved ) HSD Blending System :Euro IV Diesel generation (DIU Plant) 2 no of project completed. 2) BPCL Ltd. (Refinary) – (Project Location-KOCCHI-Sulzer India Ltd. ) Hydrocarbon line & Vent Line revamping and distillation column main inlet line nozzle replacement nozzle size was 600 NB.

3) Total oil & Gas Ltd. Maysur – Jetty 13 --Loading unloading arm . 4) PIDILITE Ind. – Adessive manufacturing plant (for Saftey shoe sole) (Utility section also) 5) THERMAX INDIA LTD Hot Oil & Steam Generation--Utility side. 6) HEMRL.PASHAN. (20 kg & 5 kg ) Project is confidential during interview ill explain. 7) INDOCO REMIDIES: Detail Engineering project for Distillation coloumn and associated equipment along with all Electrical & Instrument work. (Sulzer India ltd). 8) JM Huber: Silica plant.

9) Rakhoh Industries: (Project Location-Singapore-Punj Llyoid and Shell marina consultant) 10) JFE Engineering.Pune (Project Location-Myanmar-Japanese & chinies consultant involved). 11) QATAR POLYSILICON.(QATAR)-- Steam Generation Plant.

Ester Industries Ltd. - Product: Film Paper roll & Plastic Chips -Uttarakhand- (Site Visited).

Polyplex Industries Ltd- Product: Plastic Chips Uttarakhand- (Site Visited)

Gulf Petrochemical Ltd. Product: Hand gloves –QATAR

Indo Count Ltd .Product: Text tile Ind.-Kolhapur (Site Visited)

BARC Ltd.-Mumbai

Sparsh Industries Ltd. - Product: Film Paper roll & Plastic Chips -Kanpur- (Site Visited)

Nerolac Paints.

Shalimar Paints.

OTHER HANDLED PROJECT’S

HOT OIL PROJECT’S

PAINTS SECTOR

MRF Ltd. .(Capacity -20TPH):- (Thermax Ltd)

Gulf Petrochemical Ltd.( Capacity -75 TPH)- -QATAR (Shell Eastern Marine. Singapore)

Parikh Power Ltd. .( Capacity-120 TPH) :- Gujarat .(Thermax Ltd)

Bank Note Paper Mill. .( Capacity-3x10 TPH) :- Maysur.(TCE CONSULTANT)

Steam Generation Ltd. .( Capacity -2x15 TPH oil fired - (Shell Eastern Marine. Singapore)

Hindustan Uni-Lever Ltd. Product: Noodles . (Site Visited)

Hindustan Uni-Lever Ltd. Product: TEA Powder . (Site Visited)

Mondelez India food pvt.ltd-Induri. Pune Product: Cadbury, Bubbly chocolate (Site Visited)

Tetra Pak Ltd :- Globlej Ltd Product: Mango Pulp. Capacity: 40 klph

Tetra Pak Ltd :- Bidadi Ltd Product: Mango Pulp. Capacity: 10 klph

Hindustan Uni-Lever Ltd. Product: ICE Creame . (Site Visited)

Have worked experience with different STAKE HOLDER in the same project. In the AGS Project 5 stake holders was involved who is 1) Banagas 2) Bapco 3) EVA ministry of Bahrain 4) Tatweer Petrolium & Bahrain work shop. Name of the Organization: Trigen Energy Design Pvt. Ltd. Pune

(Duration: - 1 year 1 month) from 25 dec 2009 to 1 Jan 2010 Company Profile: This organization is working in the Energy Sector Precisely in the Air Conditioning (HVAC) field.

STEAM GENERATION PROJECT’S (POWER SECTOR)

FOOD GRADE PROJECT’S

PREVIOUS EXPRIENCE

Sumarry of Roles & Responsibilities :-

Reporting project activities to Project manager. b) Preparing weekly project reports.

Project Scheduling meeting on day Basis & Catch up Plan.

Checking all project Documents. b) Client Co-ordination

Intra department co-ordination b) To Complete the project within scheduled period.

Man power Planning

Educational Qualification:

Degree with Branch College/University Year of Passing Percentage Post Graduate Diploma in

Piping Design & Engineering

MIT COLLAGE, Pune. 2010 GRADE-B

Diploma in Mechanical

Engineering

Suyash Polytechnic Pune

, MSBTE, Mumbai.

2008 68.00%

HSC Pune University 2004

58.00%

Personal Details :-

Father’s name : Kundlik Baburao Borhade Date of Birth : 16.11.1984 Nationality : Indian. Marital Status : Married.

Sr.No.68/1a/5, Dhiraj Goldy Appt, Flat No-4. Shivaji Chowk,Pimple Nilakh- 411027 Pune, Maharashtra.