GURUPRASHATH VIJAYAN
Cell: +91-637*******/979*******
Email: **********@*****.**.**, ******************@*****.***
Skype ID: guruprashath
Career Objective:
Looking for challenging job responsibility with Hands on 11 Years’ experience (10 years in Gulf) in handling MEP project such as Residential, Hotel, Commercial, Metro Rail and Airport Projects and Knowledge of all aspects of construction activities such as Technical, Design, Co-ordination, Site execution, Site co-ordination,Procurement,QS,Estimation,Quality, Safety, Operation & Maintenance.
Summary of Skills:
Capable of handling critical/Do or Die/Impossible Deadline projects which delays due to lack of design, technical, procurement construction and management.
Capable of suggesting to management Quick analysis of the problems and conclusions to proceed.
Alarming the management about the cost impact, time impact and mismanagement.
Co-ordination with colleagues, client, consultant, sub-contractors, supplier and manufactures.
Capable of developing design drawing to shop drawing and incorporate as built drawing.
Capable to prepare BOQ, procure and material submittals for materials/equipment’s according to the project specification/requirement, ASHRAE, SMACNA, NFPA and IPC.
Supervise and execute the installation of MEP mechanical services such as ducting, chilled water piping, domestic water piping, drainage and fire protection services.
Other than MEP services fuel system for boiler, generator & refuelling facilities, Sewage Treatment System and Irrigation system.
Assist Testing & Commissioning Team, capable of prepare Project handover/finishing activities such as spare parts, training program arrangement to clients and other required details by client.
Contract related claims preparation and reviewing subcontractor claims.
Implement and follow Project and company’s OH&S/HSE procedures. Capable of conducting tool box talk, if required.
Education
2005- 2008: Diploma in Mechanical Engineering- PACR COLLEGE, INDIA.
2010- 2014: B.Tech in Mechanical Engineering-KSOU, INDIA.
Professional History
QATAR RAIL METRO DEPOT PROJECT-REDLINE
DOHA,QATAR.
FUJITA CORPORATION
MEP ENGINEER
2017-Till
KING KHALID INTERNATIONAL AIRPORT TERMINAL-5
RIYADH,
SAUDI ARABIA.
AKFA CONTRACTING/
TAV CONSTRUCTION
MECHANICAL ENGINEER
2014-2017
HILTON HOTEL & RESIDENTIAL
RIYADH,
SAUDI ARABIA.
ETA UNISTAR
HVAC ENGINEER
2011-2014
KING ABDULLAH FINANCIAL DISTRICT-2
RIYADH,
SAUDI ARABIA.
ETA UNISTAR
HVAC ENGINEER
CENTRAL MARKET REDEVELOPMENT (Tallest tower in Abu Dhabi)
ABU DHABI, UAE.
VOLTAS-IOBG
HVAC SUPERVISOR
2009-2008
MOVENPICK HOTEL & RESIDENCIA-DEIRA
DUBAI,UAE.
VOLTAS-IOBG
HVAC SUPERVISOR
WAVE ROCK BUILDING PROJECT,TRAINING-MEP SYSTEM
INDIA
VOLTAS
HVAC SUPERVISOR
2008-2009
FUJITA CORPORATION-DOHA, QATAR (2017-Cont.)
METRO PHASE 1 SYSTEMS ROLLING STOCK AND TRACKWORK- DEPOT 1 (DT.RSD),QATAR.
MEP Engineer
Preparing of Material submittal & Material ordering as per Project Specification.
Supplier/manufacture Co-ordination/follow-up to get equipment’s on time delivery.
Preparing/verifying Method Statements
Co-ordination with client, Sub-contractor and site team for technical issues.
Supporting to prepare shop drawing and As-Built drawing
Select/verify equipment’s such as Chiller, Pumps, Air handling Unit, Fan Coil Unit, DX units, CRAC Unit, Fans, Water Heater, Grease interceptor, Water Tank, Fuel system for generator and Refueling facility, FM 200, Foam Fire suppression system and Sewage Treatment Plant.
Co-ordination with Qatar Government Institution ASHGHAL.
Providing Technical support and solve all Site technical issues to ensure completion of Projects within the stipulated time.
Prepare regular progress reports of MAR, MES,IR,NCR, RFC,FAT and FCR etc.
Preparing O&M and RAM/CMMS related documents
Inform and follow-up with concern QA/QC team regarding Inspection Reports (IR), Non-Conformance Report (NCR), other Quality reports and Quality Control System meetings.
Preparation of variation of claim and assessing sub-contractors claims.
Supporting Testing & Commissioning Team
Preparation for handover activities Snag List, Site NCR, Spare parts, warranty and training program.
Arbitration related documents preparation.
AKFA CONTRACTING (TAV/ACC), RIYADH, SAUDI ARABIA (2014-Cont)
Mechanical Engineer
1)KING KHALID INTERNATIONAL AIRPORT TERMINAL-5, RIYADH, KSA.
Technical Office:
Materials submittal for mechanical system such as Ventilation, Heating & cooling, Plumbing, Firefighting, Irrigation, Water Treatment system and Fuel system, Novec 1230 system with full analysis.
Assuring that material submittal materials complying as per our Project specification and as per project requirement.
Collecting technical details/quotation from suppliers/manufacturer.
Quantity Take-off, Material Ordering and follow-up.
Submitting Pre-Qualification, Method statement and Request for Information.
Arrangement for Client representative’s training Programs and startup.
Collecting materials and prices for the parts that will be used in maintenance point of view.
Variation claim-according to the clause between contract and client requirement.
Final Hand over Documents preparation as per client requirement.
Design Office:
Managing draftsman to produce shop drawings for Ventilation, Heating & cooling, Plumbing, Firefighting, Irrigation and Fuel system.
Confirming that drawings made as per respective standards.
Verifying sub-contractor drawing’s submittal.
Creating typical installation details.
Submitting As built drawings.
Coordinating with other service providers.
Site Supervision:
Regular supervision to site, cross check the execution as per the Project specification, standard and shop drawing.
Review shop drawing prior to submittal for service co-ordination and co-ordination with other construction elements.
To advice on any impact on services caused by Architectural changes and raise Query to Project Manager and Consultant.
Using schedule of MEP equipment’s, Co-ordinating with construction tem for equipment space, movement requirement and maintenance requirement.
To assist internally QS and Planning department for update MEP system progress.
Regular supervision of service installation and confirming that installation going on as per project specification and approved drawings.
Ensuring that services provisions clearance is provided in time for structure.
To provide technical advice to construction team.
Close inspection for MEP contractor installation works.
Carry out site walks and inspection for service installation, identifying poor quality elements and advise construction team.
Ensure that MEP site instruction/NCR are closed out.
Providing Civil and Ceiling clearances according to site progress.
Attending Meeting with other contractor/consultant/client about site progress and other issues.
Sub-contractor work-verifying and billing.
Ensure that Company HSE policies are implemented at site in coordination with HSE department.
Operation & Maintenance;
Assist the Maintenance Supervisor by leading the maintenance team and helpers on the following tasks which include but are not limited to:
• Perform maintenance tasks.
• Follow work instructions.
• Assure that products are handled in a manner that minimizes damages and deterioration.
• Apply preventive maintenance to avoid unplanned repairs or critical breakdowns.
• Establish mechanical / electrical maintenance checklists and record maintenance activities.
• Creating method statement if required by client
ETA-UNISTAR, RIYADH, SAUDI ARABIA, (2011 – 2014)
HVAC Engineer.
1) KING ABDULLAH FINANCIAL DISTRICT-2, RIYADH, KSA.
2) HILTON HOTEL & RESIDENCIAL PROJECT, RIYADH, KSA.
Material Submittal-
Drawing review-
Qty take-off -
Material order-
Site Supervision-
Consultant approval.
VOLTAS-IOBG, DUBAI & ABUDHABI, UAE, (2009 – 2011)
HVAC Supervisor
1) MOVENPICK HOTEL & RESIDENCIAL PROJECT, DEIRA, UAE.
2) CENTRAL MARKET REDEVELOPMENT PROJECT, ABU DHABI, UAE. (Tallest tower in Abu Dhabi)
The incumbent will supervise work on execution of MEP project with special emphasis on HVAC area.
Ensuring that the quality of material and installation of work in accordance with the acceptance criteria identified for the project.
Ensuring that the work is completed in accordance with the specified Quality Management and Control system and in a safe manner.
Responsible for ensuring that the technical parameters and compliance process are supplied as outlined in the contract documents
Handled the tasks of assisting senior engineers in planning and installing materials
VOLTAS-IOBG, HYDERABAD, INDIA. (2008-2009)
HVAC-SUPERVISOR
Training which includes subject of
HVAC system
design, CAD,
Qty-survey,
Language,
Safety,
Management and Presentation
1) WAVE ROCK BUILDING PROJECT, HYDERABAD, INDIA.
Prepare the testing and commissioning schedule for all installed services and assist QC Engineer to raise the inspection with the help of concerned project engineers and supervisors. Follow up with Suppliers, Subcontractors & consultant to complete the task to obtain the status ‘A’
Computer Courses:
MS-OFFICE, Auto-CAD, Revit,Pro-Engineering Wildfire 2.0, SAP Program and HVAC software’s.
Technical Courses:
Scaffolding Inspector Level-I,(Gulf)
OSHAS 18001 Training classes
In-Plant training(Industrial)
CCRM Training
Other Information:
FATHER NAME ; VIJAYAN THIRUPATHI
PASSPORT NO ; R3066989
DOB ; 10.09.1989
CURRENT LOCATION; DOHA,QATAR.
PERMANENT ADDRESS; 2/171, NORTH STREET, R.REDDIAPATTI (PO),
RAJAPALAYAM (TK),
VIRUDHUNAGAR (DT),
TAMILNADU,
INDIA.
626136.