Post Job Free

Resume

Sign in

Civil Engineer

Location:
Karachi, Sindh, Pakistan
Salary:
SAR 13000-15000
Posted:
July 03, 2019

Contact this candidate

Resume:

CURRICULUM VITAE

ENGR SHEERAZ AHMED

Civil Engineer

Cell No. 009*********** Saudi council of Engineers Membership No: 247306

E-mail: ac9q3r@r.postjobfree.com Pakistan Engineering Council Membership No: Civil/25710 IMO & WhatsApp No: 009**-***-***-*** Skype ID: sheeraz.engr

Education: B.E Civil- 2005 & Post Graduate (P.Gd) Civil-2009 evening program from MUET Pakistan.

04 months Diploma in Project Management-2012, from PIM. PMI certified institute.

Experience:

15 Years experience in below disciplines.

1.Construction of AL SALAM Hospital Alkhobar-KSA (13 Floors HB & 04 Floors PB)

2.Construction of 380 kV DC EHV-OHTL b/w Tabuk BSP & Tabarjal BSP

(Saudi Arabia) Contract No. 440*******/00.

2A. Construction of 380 kV DC EHV-OHTL from Al-Jouf 2 BSP to Ar-ar BSP

(Saudi Arabia) Contract No. 440*******/00.

2B. Construction of 380 kV DC EHV-OHTL from Tabarjal BSP to Al-Jouf 2 BSP.

(Saudi Arabia) Contract No. 440*******/00.

2C. Construction of New Tabarjal BSP 380/132/33 kV.

(Saudi Arabia) Contract No. 440*******/00.

(From June 2015 to May 2018).

3.Construction of Hospital, Hostel Buildings & Asphalt roads. (Pakistan)

(March 2014 to May 2015)

4.Construction of Buildings (Basic Health Units & School Buildings) & Asphalt Roads (850 km) along with pipe & Box culverts and Jetties. (June 2005 to Dec 2013)

Last Job status:

1. Job Title: Structural Engineer

Employer: DAR Engineering (Consultant)

Client: AL Salam Medical Services Company (ASMSC).

Contractor: Project Build Company (PBC).

Project Name: a. Construction of Alsalam Medical Hospital

(Hospital Building 13 Floors+04 Floor Parking Building).

Job Responsibilities-1:

1.As per Structural IFC, shop drawing, detail framing plans and Elevations plans/drawing execute the construction work of Structural members such as (Raft Footing, Pile Foundation, Columns, Beams, Shear and retaining walls, water tanks, sump pits etc) as per ACI standard.

2.Check the level of precast hollow core slab and proper locking system.

3.Witnessed concrete compressive strength test i.e (45 MPA for Beam & 40 MPA for Other Structural members).

4.Witness FDT in Backfilling.

5.Monitor the plaster and finishing work.

6.Take permission from Mechanical and electrical section perior pouring and plaster work in any case.

7.Maintain overall quality of Primer, waterproofing membrane, protection board etc.

8.Issue site instructions if construction work is going on without following IFC drawing and specifications.

9.Arrange meeting with consultant inspectors and contractor site engineers regarding project progress.

10.Report to Project Manager.

2. Job Title: Civil Engineer- (EHV-OHTL)

Employer: DAR Engineering (Consultant)

Client: Saudi Electricity Company (SEC).

Contractor: Middle East Engineering Company Ltd. (MEEDCO),

National Contracting Company (NCC).

Project Name: a. Construction of 380 kV DC OHTL b/w Tabuk BSP to

Tabarjal BSP (Contract No. 440*******/00)-COA-KSA

b. Construction of 380 kV DC OHTL from Al-Jouf 2 BSP to Ar-ar BSP (Saudi Arabia) Contract No. 440*******/00.

c. Construction of 380 kV DC OHTL from Tabarjal BSP to Al-Jouf 2 BSP (Saudi Arabia) Contract No. 440*******/00.

Length of lines: 390.793 km, 196 km & 212 km.

No: of Tower foundations: 1019 in first line, 506 in 2nd line & 548 in 3rd line

(Pile foundation, Soil Pier and Rock Pier)

Joining Date: June, 2015 End Date: 21st Feb 2018.

Job Responsibilities-2:

1.Supervise and maintain the quality of construction of Access road and Structural Pad’s as per SEC standard i.e TES-P- 122.11 Rev.0 & TCS-113.02, Rev.0.

2.Inspect the depth and dia of excavated tower legs of Pile foundations, Soil Pier, Rock Pier & Pad & Chimney (Tower type S1N, SIN/SP, TA1N, TA1N/SP, TA2N,TA2N/SP, TA3N,TA3N/SP, DE, TR/SP as per IFC drawing and specifications as per tower type.

3.Inspect the No: of Main Bars, length, dia, number of stirrups of rebar cage before laying into excavated pit.

4.To monitor the quality and quantity of concrete as per SEC standard i.e 70-TMSS-03, Rev.0 & ACI-117.

5.Witness laboratory concrete test (compressive strength), Soil tests (Liquid Limit, Plastic Limit, Plasticity Index, Modified Procter, CBR and Field Density Test (FDT) by Troxler & EDG.

6.Witnessed in calibration of UTM, Concrete Batching Plant, concrete mixture truck water guage etc.

7.Record RFI’s of pre pouring excavation, pouring of concrete, Access road, structural pads, FDT, soil sample, Crash barriers and painting work (Coal Tar epoxy, black PU, white Pu) of tower foundations.

8.Monitor the basic body and upper body erection and torque inspection.

9.Monitor the stringing and OPGW work.

10.Construction of 380 kV Substation, raft footing for GIS building, Super grid transformer, Grid transformer and Auxiliary transformer.

11.Construction of combined footing and isolated footing for Bus support, Gantry structure.

12.Construction of strip footing along with retaining wall for boundary wall.

13.Construction of Asphalt road 06m wide and 02m shoulders both side and concrete sidewalk way.

14.Conduct meeting with staff regarding today’s progress and tomorrow’s schedule.

15.Conduct meeting with Contractor’s Project Manager & Construction Manager fortnightly in order to achieve project goals within estimated budget, time and scope.

16. Meeting with concerned agencies/parties in order to resolve ROW issues, along with contactor team.

17.Report to Project Manager (SEC).

3. Job Title: Civil Engineer

Employer: Project Directorate Wing (LUMHS Jamshoro Pakistan)

Client: Liaquat University of Medical & Health Sciences Jamshoro.

Project Name: 1. Construction and Supervision of 400 bed Post Graduate Hostel.

2. Construction 500 bed Hospital.

3. Establishment of Institute of Pharmacy.

4. Asphalt road along their Premises.

Joining Date: 03rd March, 2014.

End Date: 31st May, 2015.

Job Responsibilities-3:

1.Execution, Supervision and construction of strip footing, isolated footing and combined footing along with Plinth beam as per approved drawings and specifications.

2.Monitoring compaction of earth work in layers during filling up to plinth beam.

3.Witness Field density test of each layer. FDT was conducted by sand cone method by third party i.e. Mehran university geotechnical laboratory.

4.Witness concrete compressive strength test.

5.Record measurement book (MB) as per actual work done.

6.Issue site instructions to contractor for improve quality of work as per specifications, drawings and ACI code as per agreement/ Bidding document.

7.Conduct weekly meeting with contractor PM and site staff regarding progress and future plan.

8.Construction of road (12ft wearing course and 8ft shoulder from both side) monitoring construction of sub grade, sub base and Asphalt wearing course approx 40 km (distributed).

9.Construction of culverts (RCC Box culvert and pipe culvert) as per site conditions.

10.Report to Project Director.

4. Job Title: Infrastructure Engineer (Civil)

Employer: Planning & Development Department.

Client: Asian Development Bank (ADB)

Project Name: Coastal Community Development Project.

(Asphalt roads & Buildings (Basic Health Units, School Buildings)

Joining Date: June, 2005 End Date: Dec, 2013.

Job Responsibilities-4:

Responsible for

1.Reviewing of detailed drawings and PC-1 of (Asphalt Roads & Buildings).

2.Evaluate Bidding documents; Bill of Quantities of Pre qualified contractors.

3.Issue work order to lower Bidder.

4.Supervise & monitoring the construction of sub grade, sub base, base coarse, as per AASHTO standard.

5.Supervise & monitor the Asphalt Base course and wearing course.

6.Witness Laboratory soil tests such as Sieve Analysis (ASTM C136), Modified Proctor test (ASTM D1557), Atterberg Limits (ASTM D4318), Field Density Test by sand cone Method (ASTM D1556), CBR (ASTM D 1883).

7.Witness Aggregate tests i.e Sieve Analysis (ASTM C 136), Specific Gravity & Water Absorption (ASTM C 127 & 128), Soundness test (ASTM C 88), Los Angeles Abrasion (ASTM C 131).

8.Witness Concrete tests i.e Slump measurement of Fresh concrete (ASTM C 143), Determine of Temperature of fresh concrete (ASTM C 1064), casting and preparation of concrete cylinder at site, curing, measuring, and testing of concrete cylinder at lab (ASTM C39).

9.Witness Asphalt tests i.e Prime coat prior to Asphalt pouring, Marshall Stability (set of 3 specimen) of Asphalt (ASTM D 6927), Density and Thickness of Asphalt cores.

10.Monitor Sub & Super structure of Building Projects ( from Excavation to closing ) Monitor as per construction and shop drawing raft & strip foundations, columns, beams, slabs, Brick & Block masonry, Plastering and Finishing work.

11.Monitor the construction of RCC Box culverts.

12.Attend meeting with client and Contractors and manage team of engineers & Foremen.

13.Record measurement book as per actual site work.

14.Prepare daily and monthly progress report then submit to Project Manager.

Final year Project under Bachelor:

Qualitative Analysis of Aggregate (Fine and Coarse Aggregate) with respect to AASHTO, ACI, BS, IS standards.

Computer skills: Ms Office, Internet.

Trainings: Diploma in Project Management (4 months duration) from Pakistan

Institute of Management (PIM) Karachi. (Oct 2011 to Feb 2012) (96 hrs).

PERSONAL:

Father’s Name : Muhammad Usman

Surname : Soomro.

Date of Birth : 01-03-1981.

Nationality : Pakistani.

Religion : Islam.

Marital Status : Single.

SCE Membership No: 247306 (Expiry date Aug 2019)

PEC No : Civil 25710 (Life Time)

Driving License : Saudi Arabia & Pakistan

Languages : English, Urdu, Arabic.

Reference:

Mr. Bahi Hamed

Project Manager

Saudi Electricity Company

009**-***-***-***

ac9q3r@r.postjobfree.com



Contact this candidate