Resume

Sign in

Mechanical Engineer Engineering

Location:
Rawdat Al Khail, Qatar
Salary:
12000
Posted:
June 29, 2019

Contact this candidate

Resume:

Anish S Pillai (B.E Mech with * Years * Months Exp)

Mob No: 77964791

E-mail: ac9pyy@r.postjobfree.com / ac9pyy@r.postjobfree.com

Career Objective

To be a part of a progressive organization which utilizes my professional experience, analytical skills and commitment to perform quality work, while giving me an opportunity to work in a challenging environment and to enriches my knowledge and understanding.

Work Experience:

Company: Hebrron Engineering Company. WLL, Doha-Qatar

Designation: Project Engineer

Duration: December 2018 – Present

Responsibilities:

* Monitoring and controlling projects with respect to quality, cost & time, resource deployment. Inspecting field sites to observe and evaluate condition and operability of facilities and structures, and to collect field survey data and measurements.

* Ensures contractor compliance with applicable engineering codes and standards and QA/QC systems, policies, and procedures.

* Reviews utility submittals including vendors, shop drawings, and utility drawings, surge analysis reports and specifications for compliance with the Contract requirements and design intent.

* Regularly visit the site to inspect the utility installation progress and identify non conformances. Provide utility related insight on construction issues.

* Analyze all root causes for all issues and resolve same and implement all new process tools according to the required order.

* Assuming responsibility for environmental monitoring and ongoing performance of processes and process plant.

* Coordinate all related engineering and planning activities throughout the project’s lifetime.

* Manage all communication with supervisors and ensure efficiency of all fabrication process and resolve all issues for processes.

* Assigned requisite resources and monitored actual project progress of site activities and provided regular updates to the client. Also, monitor the material and drawing submissions.

* Safety is a major one since we install gas trains, pressure regulating systems, modulating motors and solenoid valves. Gas and oil pipelines need intense care in its work.

* Fabrication, erection and commissioning new production units, monitoring modifications and upgrades, and troubleshooting existing processes.

* Fabrication and erection of ducts, piping supports, columns, bracings, roof trusses and tie beams were done at the quality and good workmen ship.

* Arrange material and manpower in time as per the construction program, material flowsheets, and updated the manpower histogram.

Company: Utility Tech International.WLL, Doha-Qatar

Designation: Project Engineer

Duration: Jan 14 – December 2018

Responsibilities:

* Monitoring and controlling projects with respect to quality, cost & time, resource deployment. Inspecting field sites to observe and evaluate condition and operability of facilities and structures, and to collect field survey data and measurements.

* Ensures contractor compliance with applicable engineering codes and standards and QA/QC systems, policies, and procedures.

* Reviews utility submittals including vendors, shop drawings, and utility drawings, surge analysis reports and specifications for compliance with the Contract requirements and design intent.

* Regularly visit the site to inspect the utility installation progress and identify non conformances. Provide utility related insight on construction issues.

* Analyze all root causes for all issues and resolve same and implement all new process tools according to the required order.

* Assuming responsibility for environmental monitoring and ongoing performance of processes and process plant.

* Coordinate all related engineering and planning activities throughout the project’s lifetime.

* Manage all communication with supervisors and ensure efficiency of all fabrication process and resolve all issues for processes.

* Assigned requisite resources and monitored actual project progress of site activities and provided regular updates to the client. Also, monitor the material and drawing submissions.

* Safety is a major one since we install gas trains, pressure regulating systems, modulating motors and solenoid valves. Gas and oil pipelines need intense care in its work.

* Fabrication, erection and commissioning new production units, monitoring modifications and upgrades, and troubleshooting existing processes.

* Fabrication and erection of ducts, piping supports, columns, bracings, roof trusses and tie beams were done at the quality and good workmen ship.

* Arrange material and manpower in time as per the construction program, material flowsheets, and updated the manpower histogram.

Company: ENMAS GB Power Systems Project Ltd., Chennai, India

Designation: Mechanical Engineer

Duration: Aug 2011 – Aug 2013.

Company: Sun Thermal Technologies Pvt. Ltd., Mumbai, India

Designation: Project Engineer. Duration: July 09 – May 11.

1. Company Name: Utility Tech International WLL, Doha-Qatar

Role Played: Utility diversion and MEP works related to Q Rail Metro Project.

(Red line North, Green Line, and Golden line)

Projects : Diversion of utilities like PW, TSE, Ooredoo cables, 66KV Cables

and Drainage/Sewage lines for Redline North Metro Stations.

Road diversion works with all reinstatement including street light

installation, median installation storm water system for Red Line

North Metro Stations.Installation of storm water network with holding tanks and foul

sewer network with lifting station for Golden line Villaggio station.

Installation of protection slabs for underground HV cables and

Ooredoo diversion for Green Line Stations.

Installation and commissioning of temporary air ventilation system

for tunnels in Red Line North Stations (On going).

Company: ENMAS GB Power Systems Project Ltd., Chennai, India

Designation: Mechanical Engineer

Duration: Aug 2011 – Aug 2013.

Company: Sun Thermal Technologies Pvt. Ltd., Mumbai, India

Designation: Project Engineer. Duration: July 09 – May 11.

1. Company Name: Utility Tech International WLL, Doha-Qatar

Role Played: Utility diversion and MEP works related to Q Rail Metro Project.

(Red line North, Green Line, and Golden line)

Projects : Diversion of utilities like PW, TSE, Ooredoo cables, 66KV Cables

and Drainage/Sewage lines for Redline North Metro Stations.

Road diversion works with all reinstatement including street light

installation, median installation storm water system for Red Line

North Metro Stations.Installation of storm water network with holding tanks and foul

sewer network with lifting station for Golden line Villaggio station.

Installation of protection slabs for underground HV cables and

Ooredoo diversion for Green Line Stations.

Installation and commissioning of temporary air ventilation system

for tunnels in Red Line North Stations (On going).

ENMAS GB Power Systems Project Ltd., India

1. Company Name : JK PAPER MILL Pvt. Ltd - Orissa

Role Played : Fabrication, Erection and Commissioning of 1 X 1400 TDS

Recovery Boilers including structural and pressure parts.

Period From July 2012 to Dec13

2. Company Name: SARDA METALS AND ALLOYS Ltd.- Visakhapatnam

Period From Jan 2012 to Jun 2012

Role Played: Supervised the fabrication, erection, and commissioning of 1X 80 MW Power boiler.

Sun Thermal Technologies Pvt. Ltd., India

Period From Aug 2011 to Dec 2011

1. Company Name: NHB Pvt. Ltd - Gujarat

Role Played: Supervised the fabrication, erection, and commissioning of rotary type carburizing furnace.

Period From Jan 2011 to July 2011

2. Company Name: UTTAM GALVA STEELS Pvt. Ltd, Kopholi - Maharashtra

Role Played: Supervised the fabrication works of conversion of oil-fired box furnaces to the natural gas system.

Period From Aug 2010 to Dec 2010

3. Company Name: GORADIA STEELS Pvt. Ltd - Maharashtra

Role Played: Participated in the fabrication and erection of quenching tank for bogie furnaces along with its hydraulic system set up.

Period From Jan 2010 to May 2010

4. Company Name : VALLEY IRON AND STEEL Pvt. Ltd - Himachal Pradesh

Role Played : Participated in the Fabrication and erection of pre-heating oil fired furnace. (Both Structural and Pipe lines)

Period From Jun 2009 to Dec 2009

Academic Courses Institution Board/University Year of Completion % marks

SSLC SBHSS, Mannar STATE BOARD 2003 85%

XII BH HSS,Mavelikara STATE BOARD 2005 81%

Maharaja Engineering College,Coimbatore. 2009 74%

Bachelor’s Degree Mechanical Engineering,

University: (ANNAUNIVERSITY)

Additional Qualification:

Issued by: Industrial Inspection Services, Cochin

NDT Level II Certification in:

Liquid Penetrant Testing (9103/PT)

Magnetic Particle Testing (9103/MT)

Radiographic Testing (9103/RT)

Ultrasonic Testing (9103/UT)

Visual Testing (VT)

Date of Issue: 21/10/2009

Date of Expiry: 20/10/2012

Academic Project:

• Redesign of Steering Gear box in Three Wheelers.

• Design and fabrication of Screw Jack.Computer Knowhow :

• OS: Windows 10, 7 and XP. Microsoft office Suite

PERSONAL DETAILS:-

Father’s Name: Soman Pillai

Date of Birth : 04th May 1987

Marital Status : Married

Sex: Male

Nationality : Indian

Languages : English Hindi Malayalam & Tamil.

Present Address : Bulding No.58, 840 Sadaira street, Flat No.12, 4th Floor, Bin-Mahmoud, Doha,Qatar

Permanent Address: Naduvilaymuriyil, Kuratticad, Mannar PO, Alappuzha, Kerala-689622, INDIA.

PASSPORT DETAILS:-

Passport No. H-5191972

Place of Issue: RPO COCHIN KERALA INDIA

Date of Issue: 30-09-2009

Validity: 29-09-2019

Resident Visa No. 287********

Driving License: Holding Valid INDIAN Driving License:

No. 30/2908/2009

Place of Issue: INDIAN

Date of Issue: 08-10-2009

Validity: 07-10-2029

Driving License: Holding Valid Qatar Driving License:

No. 254********

Place of Issue: QATAR

Date of Issue: 07-03-2016

Validity: 06-03-2021

Place: Doha,Qatar

Date: 28/06/2019



Contact this candidate