MOHAMMAD SAJID HUSAIN

CIOB (on going), Professional Dip. in QS, B.Sc.

in QS, Dip. in Civil Eng.

Email : ac9p5a@r.postjobfree.com

Cell +971*********

Civil Engineering Professional

OBJECTIVE : A Senior Quantity Surveyor/Contract Administrator (Building Construction Industry) willing to take up a Challenging task and grow up with a Organization.

STATUS : Currently working in ACC (Arabian Construction Company) as a Senior Quantity Surveyor at Sheikh Khalifa Mosque Al Aain (UAE)

EXPERIENCE : Twenty One years Gulf Experience (19yrs. Dubai+02yrs. in Qatar) in QUANTITY SURVEYING AND COMMERCIAL FIELD in

Building Construction Industry and Nine Years’ Experience as a Construction Engineer in the same Industry.

DATE : May 2016 – Till date

COMPANY : ACC (Arabian Construction Company), Abu Dhabi (UAE) PROJECT : Sheikh Khalifa Mosque at Al Ain

PROJECT COST : AED 500 Million

CONSULTANT : BAYATY Architects & Engineering

DESCRIPTIOPN : POST CONTRACTING

1. Preparation and submission of Interim Payment Application to Engineer.

2. Site visit with Engineer to record monthly progress of works, Material On Site & preparation of monthly Interim Payment Application for submission.

3. Preparation (Measurement) and submission of Variation Claim to Engineer

4. Negotiation and agreeing the variation claim with Engineers. 5. Agreement of measurements and star rate

6. Discussion and resolving over the Disputed/Rejected Variation Claim (based on the drawing, specification & RFIs). 7. Review and study of Contract Drawings vs Commented Drawings and to find out potential variation for claim 8. Review and study of RFIs (Request for Information) and to study the Engineer’s response and to find out potential variation for claim

9. Participates in periodic meetings with the Clients, Consultants and Sub contractors.

10. Preparation and submission of Final Account to the Engineer 11. Preparation and Forecasting of Cash Flow.

12. Preparation and Forecasting financial Report of the Project 13. Preparation of Variation Log, updating periodically to the Management

14. Preparation of Certified Interim Payment by Engineer and the Client received payment status and updating to the Management 15. Preparation of delay status of Certified Payment Certificate by Engineer and payment received from the Client

16. Updating of Variation Log

17. Preparation of Weekly Commercial Report

18. Preparation of Monthly Commercial Report

19. Responsible for cost control during the construction period. 20. Verification and certification of sub-contractor's monthly Payment Applications and to issue payment certificate. 21. Review and assess Sub-contractors’ Variation claims including forensic analysis of subcontractors’ rates for new items.

22. Drafting a letter to Subcontractors/Suppliers in relation to their working activities on site

23. Performs quantity surveys, measures and records site information as required.

24. Recording of all Back Charges and Contra Charges and notifying to the Subcontractor.

25. Calculates and imposes or reviews penalties in accordance with Contract.

26. Ensure the submission of Subcontractors’ insurances/bonds in accordance with the contract

27. Lead and supervise the QS team comprising for 3-4 people 28. Reviews and settle final accounts with Subcontractors. 29. Prepares or reviews final payments.

30. Prepares or reviews final account.

31. Advises on contractual issues, such as: damages, insurance, and noncompliance.

32. Working knowledge of FIDIC Contracts and management of key Contract Clauses.

DATE : May 2014 – Oct 2015

COMPANY : AKTOR S.A. (QATAR)

PROJECT : New Doha International Airport Project (Qatar) PROJECT COST : Qatari Riyal 250 Million

CONSULTANT : MACE

JOB TITLE : Senior Quantity Surveyor/Contract Administrator DESCRIPTIOPN : POST CONTRACTING

1. Measurement, preparation and submission of Interim Payment Application to the Engineer

2. Measurement, preparation and submission of Variation Claim 3. Negotiation and agreeing the variation claim.

4. Agreement of measurements and star rates

5. Participation in site visits & preparation of monthly Project Reports

6. Participates in periodic meetings with the Clients, Consultants and Sub contractors.

7. Verification and certification of sub-contractor's monthly Payment Applications and to issue a payment certificate. 8. Verification and certification of suppliers’ invoices and issue payment certificates.

9. Review and assess Sub-contractors’ claims including forensic analysis of subcontractors’ rates for new items.

10. Notification letters to Subcontractors/Suppliers in relation to their working activities on site

11. Performs quantity surveys, measures and records site information as required.

12. Ensure the submission of Subcontractors’ insurances/bonds in accordance with the contract

13. Lead and supervise the QS team comprising for 3-4 people 14. Reviews and settle final accounts with Subcontractors. 15. Participates in settlement of claims

16. Prepares or reviews final payments.

17. Prepares or reviews final account.

18. Releases of retentions and bonds.

19. Calculates and imposes or reviews penalties in accordance with Contract.

20. Prepares Payment Certificates.

21. Negotiates costs of revisions with Subcontractors. 22. Updates Contract amount.

23. Advises on contractual issues, such as: damages, insurance, and noncompliance.

24. Working knowledge of FIDIC Contracts and management of key Contract Clauses

DATE : 2012 – 2014

COMPANY : Brookfield Multiplex Constructions LLC Dubai (UAE) PROJECT : Foremarke School Al Barsha, Dubai (UAE)

PROJECT COST : AED. 150 Million

CONSULTANT : SWETTEE GROUP

JOB TITLE : Senior Quantity Surveyor/Contract Administrator DESCRIPTIOPN : POST CONTRACTING

1. Cost Planning based on NRM1 and NRM2, Budget Preparation, Forecasting of Budget of each packages based on current drawings.

2. Updating of forecasting Budget subject to the change in Design drawings vs. revisions.

3. Study of Subcontractor’s shop drawings vs. Design Drawings for cost control.

4. Responsible to Senior Administrator for measurement and preparation of all Client variation and claims submitting monthly claims to Client for monthly payment.

5. Negotiation to get the approval from the Client for our Claimed Variations

6. Raising interim payment applications and agreeing with Consultant and preparation of statement at completion and agreeing the Final Account

7. Negotiation and agreeing the variations with Consultants 8. Responsible for review and re-measurement of

Subcontractors/Suppliers monthly Bills

9. Assessment of the Monthly Bill based on the work done on site walk around.

10. Taking off Quantities for Subcontractors/Suppliers Billing. 11. Tendering and preparation aid, reporting to Senior Administrator including bulk checking, document assessment and preparation and sundry duties as required

12. Assessment, Processing and checking of all out going payments 13. Responsible for review and re-measurement of

Subcontractors/Suppliers Variations and measurement, assessment and negotiation there-of.

14. Subcontractors/Suppliers payments and Contra charges 15. Notification letters to Subcontractors/Suppliers in relation to their working activities on site

16. Keeping all the records and notifying through official letters to Subcontractors/Suppliers/Traders for all their Back Charges and Contra Charges.

17. Coordinating with sub-contractors and vendors, preparing payment certificates

DATE : 2010 – 2012

COMPANY : Brookfield Multiplex Constructions LLC Dubai (UAE) PROJECT : Abu Dhabi Golf Club Resort & Hotel (UAE) PROJECT COST : AED. 700 Million

CONSULTANT : GREC

CLIENT : TDIC

JOB TITLE : Senior Quantity Surveyor/Contract Administrator DESCRIPTIOPN : POST CONTRACTING & PRE CONTRACTIN G 1. Budget Preparation, Forecasting of Budget of each packages based on current drawings.

2. Updating of forecasting Budget subject to the change in Design drawings vs. revisions.

3. Study of Subcontractor’s shop drawings vs. Design Drawings for cost control.

4. Responsible to Senior Administrator for measurement and preparation of all Client variation and claims submitting monthly claims to Client for monthly payment.

5. Negotiation to get the approval from the Client for our Claimed Variations

6. Detail study of revised drawings issued by the Client vs. Original Design Drawings and to pick up the changes to make Client variations.

7. Raising interim payment applications and agreeing with Consultant and preparation of statement at completion and agreeing the Final Account

8. Negotiation and agreeing the variations with Consultants 9. Responsible for review and re-measurement of

Subcontractors/Suppliers monthly Bills

10. Assessment of the Monthly Bill based on the work done on site walk around.

11. Taking off Quantities for Subcontractors/Suppliers Billing. 12. Tendering and preparation aid, reporting to Senior Administrator including bulk checking, document assessment and preparation and sundry duties as required

13. Assessment, Processing and checking of all out going payments 14. Responsible for review and re-measurement of

Subcontractors/Suppliers Variations and measurement, assessment and negotiation there-of.

15. Notification letters to Subcontractors/Suppliers in relation to their working activities on site

16. Keeping all the records and notifying through official letters to Subcontractors/Suppliers/Traders for all their Back Charges and Contra Charges.

17. Coordinating with sub-contractors and vendors, preparing payment certificates.

PRE-CONTRACTING

1. Preparation of Tender Documents including BOQ, Specifications, Drawings, Scope of Works, Programs, General Condition of Contract and all other required documents.

2. Take off Quantities and preparing of BOQ for Tendering 3. Meeting with Subcontractors/Suppliers and to judge their capabilities and capacity of doing the job and to issue the Tender Documents for Pricing.

4. Study the Tender Priced Documents, short-listing of Subcontractors/Suppliers/Traders and preparation of BID TABS of the Tender Prices for Senior Managements’ Approval. 5. Monitoring estimations, submitting tenders, negotiating terms and conditions for the contract award, finalizing BOQ, planning cash flow and material flow and budget allocation for the projects 6. To discuss and obtain Tender Clarification from Subcontractors/Suppliers/Traders.

7. To convince them and force (up to some extent) to make a final discount in their Contract Value.

8. To obtain the prices for substitute materials as well. 9. Preparation of Agreement for Subcontractor/Supplier/Trader DATE : 2006 – 2010

COMPANY : Brookfield Multiplex Constructions LLC Dubai (UAE) PROJECT : Index Building Residential & Commercial Building (UAE)

(4B+3PD+G+80)

PROJECT COST : AED. 1.50 Billion

CONSULTANT : BG&E, Woods&Bagot

CLIENT : Union Properties

JOB TITLE : Senior Quantity Surveyor/Contract Administrator DESCRIPTIOPN : POST CONTRACTING

1. Budget Preparation, Forecasting of Budget of each packages based on current drawings.

2. Updating of forecasting Budget subject to the change in Design drawings vs. revisions.

3. Study of Subcontractor’s shop drawings vs. Design Drawings for cost control.

4. Responsible to Senior Administrator for measurement and preparation of all Client variation and claims submitting monthly claims to Client for monthly payment.

5. Negotiation to get the approval from the Client for our Claimed Variations

6. Raising interim payment applications and agreeing with Consultant and preparation of statement at completion and agreeing the Final Account

7. Negotiation and agreeing the variations with Consultants 8. Responsible for review and re-measurement of

Subcontractors/Suppliers monthly Bills

9. Assessment of the Monthly Bill based on the work done on site walk around.

10. Taking off Quantities for Subcontractors/Suppliers Billing. 11. Assessment, Processing and checking of all out going payments 12. Responsible for review and re-measurement of

Subcontractors/Suppliers Variations and measurement, assessment and negotiation there-of.

13. Subcontractors/Suppliers payments and Contra charges 14. Notification letters to Subcontractors/Suppliers in relation to their working activities on site

15. Keeping all the records and notifying through official letters to Subcontractors/Suppliers/Traders for all their Back Charges and Contra Charges.

16. Coordinating with sub-contractors and vendors, preparing payment certificates

DATE : 2004 – 2006

COMPANY : Nasa Multiplex Construction Dubai (UAE)

PROJECT : Grosvenor House Hotel (UAE)

(3B+3PD+45)

PROJECT COST : AED. 230 Million

CONSULTANT : Archon (Arch Group)

CLIENT : H.H. Sheikh Bin Saeed Al Maktoum

JOB TITLE : Senior Quantity Surveyor

DESCRIPTIOPN : POST CONTRACTING

1. Budget Preparation, Forecasting of Budget of each packages based on current drawings.

2. Updating of forecasting Budget subject to the change in Design drawings vs. revisions.

3. Study of Subcontractor’s shop drawings vs. Design Drawings for cost control.

4. Responsible to Senior Administrator for measurement and preparation of all Client variation and claims submitting monthly claims to Client for monthly payment.

5. Negotiation to get the approval from the Client for our Claimed Variations

6. Raising interim payment applications and agreeing with Consultant and preparation of statement at completion and agreeing the Final Account

7. Negotiation and agreeing the variations with Consultants 8. Responsible for review and re-measurement of

Subcontractors/Suppliers monthly Bills

9. Assessment of the Monthly Bill based on the work done on site walk around.

10. Taking off Quantities for Subcontractors/Suppliers Billing. 11. Assessment, Processing and checking of all out going payments 12. Responsible for review and re-measurement of

Subcontractors/Suppliers Variations and measurement, assessment and negotiation there-of.

13. Subcontractors/Suppliers payments and Contra charges 14. Notification letters to Subcontractors/Suppliers in relation to their working activities on site

15. Keeping all the records and notifying through official letters to Subcontractors/Suppliers/Traders for all their Back Charges and Contra Charges.

16. Coordinating with sub-contractors and vendors, preparing payment certificates

DATE : 2003 – 2004

COMPANY : Nasa Multiplex Construction Dubai (UAE)

PROJECT : Deira Creekside Apartment, Dubai (UAE)

(4B+3PD+G+80)

PROJECT COST : AED. 65 Million

CONSULTANT : WS Atkins

CLIENT : Union Properties

JOB TITLE : Quantity Surveyor

DESCRIPTIOPN : POST CONTRACTING

1. Responsible to Senior Administrator for measurement and preparation of all Client variation and claims submitting monthly claims to Client for monthly payment.

2. Negotiation to get the approval from the Client for our Claimed Variations

3. Raising interim payment applications and agreeing with Consultant and preparation of statement at completion and agreeing the Final Account

4. Negotiation and agreeing the variations with Consultants 5. Responsible for review and re-measurement of

Subcontractors/Suppliers monthly Bills

6. Taking off Quantities for Subcontractors/Suppliers Billing. 7. Assessment, Processing and checking of all out going payments 8. Keeping all the records and notifying through official letters to Subcontractors/Suppliers/Traders for all their Back Charges and Contra Charges.

DATE : 2002 – 2003

COMPANY : Bu Haleeba Contracting Co., Dubai (UAE)

PROJECT : Madinat Jumeirah Hotel & Resort, Dubai (UAE) PROJECT COST : AED. 350 Million

CONSULTANT : Mirage Milli, KYP

CLIENT : H.H. Sheikh Bin Saeed Al Maktoum

JOB TITLE : Senior Quantity Surveyor

DESCRIPTIOPN : POST CONTRACTING

Estimating, Forecasting, Budgeting, Re-Measurement, BOQ preparation, Preparation of Subcontractors Bill, Billing/Variation assessment as per site progress. negotiation with variation, preparation of Interim payment Certificate, preparation of Final, Responsible for review and re-measurement of Subcontractors/Suppliers monthly Bills, Taking off Quantities for Subcontractors/Suppliers Billing, Assessment, Processing and checking of all out going payments

Subcontractors/Suppliers/Traders for all their Back Charges and Contra Charges.

DATE : Jan 2002 – Jan 2003

COMPANY : Bu Haleeba Contracting Co., Dubai (UAE)

PROJECT : Hotel Grand Hayat Accommodation, Dubai (UAE)

(G+2)X19Bldgs

PROJECT COST : AED. 65 Million

CONSULTANT : Arkitecnik

CLIENT : Grand Hayat

JOB TITLE : Quantity Surveyor

DESCRIPTIOPN : POST CONTRACTING

Estimating, Forecasting, Budgeting, Re-Measurement, BOQ preparation, Preparation of Subcontractors Bill, Billing/Variation assessment as per site progress. negotiation with variation, preparation of Interim payment Certificate, preparation of Final, Responsible for review and re-measurement of Subcontractors/Suppliers monthly Bills, Taking off Quantities for Subcontractors/Suppliers Billing, Assessment, Processing and checking of all out going payments

Subcontractors/Suppliers/Traders for all their Back Charges and Contra Charges.

DATE : 2000 – 2002

COMPANY : Bu Haleeba Contracting Co., Dubai (UAE)

PROJECT : Hotel Royal Le Meridian (B+G+16, Dubai (UAE) PROJECT COST : AED. 80 Million

CONSULTANT : Arenco (Arch Group)

CLIENT : H.H. Sheikh Bin Saeed Al Maktoum

JOB TITLE : Quantity Surveyor

DESCRIPTIOPN : POST CONTRACTING

Estimating, Forecasting, Budgeting, Re-Measurement, BOQ preparation, Preparation of Subcontractors Bill, Billing/Variation assessment as per site progress. negotiation with variation, preparation of Interim payment Certificate, preparation of Final, Responsible for review and re-measurement of Subcontractors/Suppliers monthly Bills, Taking off Quantities for Subcontractors/Suppliers Billing, Assessment, Processing and checking of all out going payments

Subcontractors/Suppliers/Traders for all their Back Charges and Contra Charges.

DATE : 1998 – 2000

COMPANY : Bu Haleeba Contracting Co., Dubai (UAE)

PROJECT : Hotel Royal Mirage, Dubai (UAE)

PROJECT COST : AED. 160 Million

CONSULTANT : Rice Perry Ellis

CLIENT : H.H. Sheikh Bin Saeed Al Maktoum

JOB TITLE : Quantity Surveyor

DESCRIPTIOPN : POST CONTRACTING

Estimating, Forecasting, Budgeting, Re-Measurement, BOQ preparation, Preparation of Subcontractors Bill, Billing/Variation assessment as per site progress. negotiation with variation, preparation of Interim payment Certificate, preparation of Final, Responsible for review and re-measurement of Subcontractors/Suppliers monthly Bills, Taking off Quantities for Subcontractors/Suppliers Billing, Assessment, Processing and checking of all out going payments

Subcontractors/Suppliers/Traders for all their Back Charges and Contra Charges.

DATE : 1997 – 1998

COMPANY : Al Muhaidib Contracting Co., Dammam (KSA) PROJECT : Junior High School (G+3)

PROJECT COST : SR. 20 Million

CLIENT : Saudi Ministry of Education

JOB TITLE : Site Engineer

DESCRIPTIOPN : Works/Site supervision, Checking of all concrete elements before and after concrete pouring, Finishes layout, land surveying, allocation planning of manpower in accordance with the programme, follow up subcontractors works and official notification for any delay or non-complaint with the Contract

DATE : 1995 – 1997

COMPANY : Al Muhaidib Contracting Co., Dammam (KSA) PROJECT : King Fahad Hospital Al Khober

PROJECT COST : SR. 60 Million

CONSULTANT : Arabisque

CLIENT : Saudi Ministry of Health

JOB TITLE : Site Engineer

DESCRIPTIOPN : Works/Site supervision, Checking of all concrete elements before and after concrete pouring, Finishes layout, land surveying, allocation planning of manpower in accordance with the programme, follow up subcontractors works and official notification for any delay or non-complaint with the Contract

DATE : 1994 – 1995

COMPANY : Al Muhaidib Contracting Co., Dammam (KSA) PROJECT : Extension of King Faisal University Dammam PROJECT COST : SR. 65 Million

CONSULTANT : Arabisque

CLIENT : Saudi Ministry of Education

JOB TITLE : Site Engineer

DESCRIPTIOPN : Works/Site supervision, Checking of all concrete elements before and after concrete pouring, Finishes layout, land surveying, Allocation planning of manpower in accordance with the programme, follow up subcontractors works and official notification for any delay or non-compliance with the Contract

DATE : 1989 – 1994

COMPANY : B.S. Builders Lucknow (India)

PROJECT : Commercial Building (B+G+7)

JOB TITLE : Site Engineer

DESCRIPTIOPN : Works/Site supervision, Checking of all concrete elements before and after concrete pouring, Finishes layout, land surveying, allocation planning of manpower in accordance with the programme, follow up subcontractors works and official notification for any delay or non-complaint with the Contract

GENERAL

1. Knowledge and Application of FIDIC

2. MS Office and Auto Cad

3. Well versed about POMI, NRMI & NRM2

4. English Language (Fluent)

5. Arabic Language (Basic)

6. Urdu Language (Fluent)

7. Hindi Language (Fluent)

8. Leadership quality

PROFESSIONAL EDUCATIONAL DETAIL

CIOB (CHARTERED INSTITUTE OF BUILDING)

Contract and Commercial Practice, Management,

Construction Technology, Health, Safety and

Environment.

(Anticipated Completion Date: 2020).

From: College of Contract Management (UK)

PROFESSIONAL DIPLOMA IN QUANTITY

SURVEYING (2015 - 2016)

From: BTEC Edexcel (UK)

Bachelor of Science (B.Sc.) in Quantity

Surveying & Construction Management

(2007 - 2010)

From: Port Jefferson University (USA).

Diploma in CIVIL ENGINEERING (1986 -1989),

From: Aligarh Muslim University Aligarh.

(U.P.) INDIA.

PERSONAL DETAIL

NAME : MOHAMMAD SAJID HUSAIN

NATIONALITY : INDIA

MARITAL STATUS : MARRIED

CHILDREN : (20yrs. Old Daugter+16yrs. Old Daughter+11yrs. Old Boy) DATE OF BIRTH : 18 October 1967

DRIVING LICENSE : A valid UAE & QATAR driving License