D.SUNDARAVADIVEL

NO.* LILLY NAGAR,

AMMAPETTAI-PO,

CHIDAMBARAM-TK,

CUDDALORE-DIST,

TAMIL NADU – 608401, S.INDIA

CELL: 0091-958-***-****

CELL: 0091-904-***-****

Email:ac9p4v@r.postjobfree.com

POST APPLIED : PIPING SUPERVISOR / PIPING QC./ / PIPING FORMAN

EXPERIENCE : 25 YEARS

QUALIFICATION : DIPLOMA IN MECHANICAL ENGINEERING

PASSPORT DETAILS : J 9421827 VALID UP TO DEC 8th 2021

NATIONALITY : INDIAN

DRIVING LICENSE : QATAR DRIVING LICENSE& INDIA

SUMMARY OF WORK EXPERIENCES

1. Position: Piping Supervisor Manali Refinery Limited India in Manali.

From Oct. 2017….. Chennai India.

2. Position: Piping Supervisor Mitsui Engineering & Shipbuilding Co.,

Feb. 2016 to July. 2017 Ltd.Aurora EOS Project in

Exxonmobil Chemical Asia Pacific,

Jurong Island, Singapore.

3. Position: Piping Supervisor SMOE -DETNORSKE--SINGAPORE

Aug. 2015 to Feb 2016 Sembawang Ship yard in

IvarAasenDevelopmentproject Singapore.

Epcic of the Detnorske processing Platform.

4. Position:Piping Supervisor Shutdown project…2 months Technip…

Dec 2014 to Jan 2015 Equate Petrochemical Company limited in

Equate Ethylene Project Kuwait.

5. Position: Piping Supervisor Technip and Chiyoda joint venture (TCJV)

Mar. 2012 to Dec. 2013 in Qatar Gas, PMP Project Qatar

6. Position: Piping Supervisor Chiyoda and Technip joint venture (CTJV)

June. 2009 to Apr. 2010 in Qatar Gas, Project Qatar.

7. Position: Piping Supervisor. Technip France in RasLaffan

June. 2008 to Mar. 2009 Olefins Project, Qatar.

8. Position: Piping Supervisor Japan Gas Company in Rabigh Olefin

Sep. 2007 to Feb. 2008 Plants Project, Saudi Arabia.

9. Position: Piping Supervisor Sohar Refinery Company in IpmfProject

Jul. 2006 to Apr. 2007 Muttra Omen, Muscat.

10. Position: Piping Supervisor Japan Gas Company in Sohar Refinery

Feb. 2005 to May. 2006 Project Oman – Muscat.

11. Position: Piping Supervisor Saudi Aramco in Qatif Gas Project

June. 2003 to Sep. 2004 Saudi Arabia.

12. Position: Piping Supervisor Saudi Aramco in Haradh Gas Project

Dec. 2001 to Mar. 2003 Saudi Arabia

13. Position: Piping Supervisor Saudi Aramco in Hawiyah Gas Project

Nov. 2000 to Aug. 2001 Saudi Arabia.

14. Position: Piping Supervisor Chiyoda Petro Star Limited in Sharq

Nov. 1998 to Aug.2000 Second Expansion Project Saudi Arabia.

15. Position:Piping Supervisor Bechtel Limited in Shaybah producing

Feb. 1998 to Nov. 1998 Facilities Saudi Arabia.

16. Position:Piping Supervisor Saudi Aramco in RasTanura Refinery

Sep. 1997 to Feb. 1998 Upgrading Project Saudi Arabia.

17. Position:Piping Supervisor Equate Petrochemical Company limited in

Mar. 1996 to Sep. 1996 Equate Ethylene Project Kuwait.

18. Position:Piping Forman Chiyoda Petro Star Limited, Bechtel Limited

Apr. 1993 to Sep. 1995 in LNG Project Das Islad, OGD-1 Project

HabsanAbudhabi.

19. Position: Forman Manali Refinery Limited India in Manali

Apr. 1992 to Apr. 1993 Refinery Expansion Project Chennai India.

20. Position:Forman BHEL Limited India in NeyveliThermal

Apr. 1991 to Mar.1992 Power Station 2 India.

SAFETY AWARNESS COURSES

PTW course in Chiyoda – Technip training center, Doha.

Pre-mechanical clearance (PMC) safety induction in CTJV – PMC training center.

Gas testing courses (H2 SO4, CO,S)

Hazardous identification and precautionary measure and escaping (Red mask) Training in Doha chiyoda – technip training centre.

CAPABLITY

Professional experience in Pipe spool marking as per erection requirement, Pre-fabrication, and Pipe spool erection.

Attending daily meeting. (Production and Safety).

Conducting daily toolbox meeting with team and Sub contractor.

Prepare daily reports of work progress and man power utilization.

Method statement preparation for pre-fabrication, Erection and Method statement preparation for Golden joint (Tie-in location)

Co-ordinate with the sub contractors to achieve the targets and schedule set by the planning.

Preparation of method statement for hydrostatic test, Pneumatic test and service test.

P & ID and 3D model verification, Test limits marking as per standard testing methods.

Review and ensure that all material certificates and certification files are up to date, including documentation from vendors and contractors

Pre-line checking prior to hydrostatic and pneumatic test.

Testing activities (like, Hydrostatic test, Pneumatic test and Service test).

Witness for Hydrostatic test and pneumatic test.

Co-ordinate change of design modification at site.

Monitor and control the implementation on site of the approved drawings and plans.

Conduct site safety walk through in co-ordination with the safety department on weekly basis.

Pre-commission activities like Air-blowing, Steam blowing, Pigging, Flushing, and Purging.

Punch killing and re-instatement prior to commissioning.

Supervision of all piping works and ensures safety and quality standards of the client.

Co-ordinate with client representative for the final visual inspection of the completed system prior to final hand over

Study the work plans / drawing to determine the work to be done. Using P&ID Isometric and 3D models.

Raise queries regarding drawing discrepancies.

Monitor the work deficiencies (repair rate in particular), and ensure the implementation of the necessary corrective actions

Inspecting the Piping line before client review and final walk through with client for mechanical completion.

Conduct rigid line checking to assure conformity with project standard.

Prepare weekly reports of the total spool erection, isometric weight installed, welded dia inches of supports and joints and the remaining work front with the materials available.

Supervise reinstatement activity.

Participating and preparing of task risk assessment for the given job to categorize and measure the precaution for the task carry out job safely and without LTI.

Supervise and witness bolt torquing and tensioning activity.

Maintaining Proper housekeeping of the Work Location.

1. FROM. OCT 2017….

Position : PIPING SUPERVISOR

Company : Kirubha Erectors.

Client : Manali Refinery Limited India.

Project : MRL Chennai.

Responsibilities:

Conducting the meeting to achieve the erection target with sub-contractor superintendent / Supervisor.

Enforces safety rules and regulations to ensure maximum protection to life and property.

Performs other related duties as may be assigned from time to time.

Checking of re-fabricated spools (Line medication)

Supervise piping installation and other field works.

Resolving technical queries to co-ordination with the client for site modifications and getting approval as per the standards and revised drawings also.

Check the installed piping components as per P & ID and reviewing isometric, Support drawings and details

Prepare and checking as built drawings.

Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details.

Lien check to verify the use of correct material fittings, valves, and supports, prior to hydro test and prepare punch list for incomplete works, check and closing after the work is done.

Prepare punch list and issue to construction team to clear.

Supervise punch clearing, line testing and line Re-instatement.

Maintaining Proper housekeeping of the Work Location.

2.MAR. 2016 to JULY 2017

Position : Piping Supervisor

Company : Mitsui Engineering & Shipbuilding Co., Ltd.

Client : Exxonmobil Chemical Asia Pacific.

Project : Aurora EOS Project jurong Island Singapore.

Responsibilities:

Conducting the meeting to achieve the erection target with sub-contractor superintendent / Supervisor.

Prepare daily reports of work progress and man power utilization.

Prepare weekly reports of the total spool erection, isometric weight installed, welded dia inches of supports and joints and the remaining work front with the materials available.

In charge of Plant Piping, Pre-Fabrication at site and Erection, hydro Test and final box-up.

Conduct safety walk through in the site in co-ordination with the safety department on weekly basis.

Supervision of all piping works and ensures safety and quality standards of the client.

Resolving technical queries to co-ordination with the client for site modifications and getting approval as per the standards and revised drawings also.

Check the installed piping components as per P & ID and reviewing isometric, Support drawings and details.

Ability to make As-Built drawings and maintain all the revised documents / Close Co-ordination with QA/QC dept for all concern Inspection and documentation.

Conduct piping system punch list completion activity.

Prepare punch list and issue to construction team to clear.

Punch killing and re-instatement prior to commissioning.

Prepare as built drawings as per requirement.

Check flow direction arrows on valves; verify that they are properly identified and valves are installed in accordance with flow direction.

Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details.

Line check to verify the use of correct material fittings, valves, and supports, prior to hydro test and prepare punch list for incomplete works, check and closing after the work is done.

Co-ordinate with client representative for the final visual inspect of the completed system prior to final hand over.

Testing activities (like, Hydro test, Pneumatic test and Service test).

Witness for Hydrostatic test and pneumatic test.

Pre-commission activities like Air-blowing, Steam blowing, Pigging, Flushing, and Purging.

Pre-line checking prior to hydrostatic and pneumatic test.

Maintaining Proper housekeeping of the Work Location.

3. AUG. 2015 to FEB 2016

Position : Piping Supervisor

Company :SMOE, DETNORSKE Sembawang Ship Yard.

Project :IvarAasenDevelopment Project Singapore.

Epcic of the Detnorske processing Platform.

Responsibilities:

Conducting the meeting to achieve the erection target with sub-contractor superintendent / Supervisor.

Co-ordinate with client representative for the final visual inspection of the completed system prior to final hand over.

Prepare daily reports of work progress and man power utilization.

Prepare weekly reports of the total spool erection, isometric weight installed, welded dia inches of supports and joints and the remaining work front with the materials available.

Witness hydrostatic / pneumatic testing.

Prepare and issue punch list.

Prepare as built drawings as per requirement.

Testing activities (like, Hydro test, Pneumatic test and Service test).

Pre-commission activities like Air-blowing, Steam blowing, Pigging, Flushing, and Purging.

Check the installed piping components as per P & ID and reviewing isometric, Support drawings and details.

Ability to make As-Built drawings and maintain all the revised documents / Close Co-ordination with QA/QC dept for all concern Inspection and documentation.

Pre-line checking prior to hydrostatic and pneumatic test.

Punch killing and re-instatement prior to commissioning.

Maintaining Proper housekeeping of the Work Location.

4. DEC2014to JAN 2015

Position : Piping Supervisor (Shutdown project)

Company : Technip

Client : Equate Petrochemical company Limited

Project : Equate Ethylene Project Kuwait.

Responsibilities:

Co-ordinate with client representative for the final visual inspection of the completed system prior to final hand over.

Witness hydrostatic / pneumatic testing.

Prepare and issue punch list.

Communication with maintenance discipline in the preparation andsupervision of delicate or risky field operations

Inspecting the Piping line before client review and final walk through with client for mechanical completion.

Resolving technical queries to co-ordination with the client for site modifications and getting approval as per the standards and revised drawings also.

Check the installed piping components as per P & ID and reviewing isometric, Support drawings and details.

Ability to make As-Built drawings and maintain all the revised documents / Close Co-ordination with QA/QC dept for all concern Inspection and documentation.

Conduct rigid line checking to assure conformity with project standard.

Conduct piping system punch list completion activity.

Participation to regular progress coordination meetings and shutdown preparation meetings

Ensure that required material have been procured and have been properly checked,

Participation to regular progress coordination meetings and shutdown preparation meetings,

Ensure the reliability and consistency of technical information on site

Maintaining Proper housekeeping of the Work Location.

5. MARCH. 2012 to DEC. 2013

Position : Piping Supervisor

Company : Technipand Chiyoda Joint Venture (TCJV)

Client : Qatar Gas. Qatar.

Project : PMP. Plateau maintenance project.

Responsibilities:

Conducting the meeting to achieve the erection target with sub-contractor superintendent / Supervisor.

Co-ordinate with client representative for the final visual inspection of the completed system prior to final hand over.

Witness hydrostatic / pneumatic testing.

Prepare and issue punch list.

Inspecting the Piping line before client review and final walk through

with client for mechanical completion.

Conduct safety walk through in the site in co-ordination with the safety department on weekly basis.

Supervision of all piping works and ensures safety and quality standards of the client.

Resolving technical queries to co-ordination with the client for site modifications and getting approval as per the standards and revised drawings also.

Check the installed piping components as per P & ID and reviewing isometric, Support drawings and details.

Ability to make As-Built drawings and maintain all the revised documents / Close Co-ordination with QA/QC dept for all concern Inspection and documentation.

Conduct rigid line checking to assure conformity with project standard.

Conduct piping system punch list completion activity.

Supervise reinstatement activity.

Maintaining Proper housekeeping of the Work Location.

6. JUN. 2009 to APR. 2010

Position : Piping Supervisor

Company : Chiyoda and TechnipJoint Venture (CTJV)

Client : Qatar Gas. Qatar.

Project : QCS.

Responsibilities:

Follow up for Spool fabrication, erection and support fabrication.

Study the work plans / drawing to determine the work to be done.

Raise queries regarding drawing discrepancies.

Conduct rigid line checking to assure conformity with project standard.

Supervise and witness bolt torquing activity.

Supervise reinstatement activity.

Conducting the meeting to achieve the erection target with sub-contractor superintendent / Supervisor.

Co-ordinate with client representative for the final visual inspection of the completed system prior to final hand over.

Prepare daily reports of work progress and man power utilization.

Prepare weekly reports of the total spool erection, isometric weight installed, welded dia inches of supports and joints and the remaining work front with the materials available.

In charge of Plant Piping, Pre-Fabrication at site and Erection, hydro Test and final box-up.

Conduct safety walk through in the site in co-ordination with the safety department on weekly basis.

Witness hydrostatic / pneumatic testing.

Prepare and issue punch list.

Maintaining Proper housekeeping of the Work Location.

7. JUN. 2008 to MARCH. 2009

Position : Piping Supervisor

Company : Technic France

Client : RasLaffan Olefins Company Qatar

Project : RasLaffan Olefins Project

Responsibilities:

Follow-up for Spool fabrication, erection and support fabrication

Reviewing the Test Package and coordinating with Process,

Engineering Design construction, contractors, sub contractors and Pre-commissioning Representatives.

Inspecting the Piping line before client review and final walk through with client for mechanical completion.

Ability to make As-Built drawings and maintain all the revised documents / Close Co-ordination with QA/QC dept for all concern Inspection and documentation.

Conduct piping system punch list completion activity.

Prepare punch list and issue to construction team to clear.

Prepare as built drawings as per requirement.

Check flow direction arrows on valves; verify that they are properly identified and valves are installed in accordance with flow direction.

Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details.

Conduct rigid line checking to assure conformity with project standard.

Conduct piping system punch list completion activity.

Maintaining Proper housekeeping of the Work Location.

8. SEP.2007 to FEB.2008

Position : Piping Supervisor

Company : Consolidated Contractors Company W.L.L

Client : Japan Gas Company KSA

Project : RabighOlefin Plants Project.

Responsibilities:

Co-ordinatingAllocating resources Planning monitoring activities Related to Construction, Reporting to the Management.

Study working plane / drawing to determine the extent of work to be done.

Raise queries regarding drawing discrepancies.

Conduct piping system punch list completion activity.

Conduct piping system punch list completion activity.

Prepare punch list and issue to construction team to clear.

Prepare as built drawings as per requirement.

Check flow direction arrows on valves; verify that they are properly identified and valves are installed in accordance with flow direction.

Ensure that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details.

Lien check to verify the use of correct material fittings, valves, and supports, prior to hydro test and prepare punch list for incomplete works, check and closing after the work is done.

Prepare and issue punch list to the construction team to clear and maintain piping standards as per ISO drawing.

Maintaining Proper housekeeping of the Work Location.

9. JULY.2006 to APRIL. 2007

Position : Piping Supervisor

Company : Consolidated Contractors Company W.L.L.

Client : Sohar Refinery Company

Project : IPMF Project, Muttra Oman

Responsibilities:

Regularly inspection of Contractor equipment to ensure it is maintained fit for intended service operations,

Preparation of works permits of the disciplines

Communication with vendors and contractors’ representative for site survey and work visits,

Participation to regular progress coordination meetings and shutdown preparation meetings,

Ensuring that Contractors are fully compliant with safety and environmental procedures.

Ensuring the quality of service in the preparation and execution of assigned

Study the work plans / drawing to determine the work to be done.

Raise queries regarding drawing discrepancies.

Co-ordinate with engineering and other related disciplines related work plans and other activities.

Prepare punch list as per test packages.

Supervise field construction activities as well as punch clearing activities.

Maintaining Proper housekeeping of the Work Location.

10. FEB.2005 to MAY.2006

Position : Piping Supervisor

Company : Consolidated Contractors Company W.L.L.

Client : Japan Gas Company

Project : Sohar Refinery Project. Oman.

Responsibilities:

Study the work plans / drawing to determine the work to be done.

Raise queries regarding drawing discrepancies.

Co-ordinates with engineering and other related disciplines regarding work plans and other activities.

Prepare daily reports of work progress and man power utilization.

Prepare weekly reports of the total spool erection, isometric weight installed, welded dia inches of supports and joints and the remaining work front with the materials available.

In charge of Plant Piping, Pre-Fabrication at site and Erection, hydro Test and final box-up.

Conduct safety walk through in the site in co-ordination with the safety department on weekly basis.

Supervision of all piping works and ensures safety and quality standards of the client.

Prepare as-built drawings as per Requirement.

Supervise field construction activities as well as punch clearing activities.

Enforces safety in construction activities.

Maintaining Proper housekeeping of the Work Location.

11.JUN. 2003 to SEP.2004

Position : Piping Supervisor

Company : Consolidated Contractors Company W.L.L.

Client : Saudi Aramco

Project : Qatif Gas Project.

Responsibilities:

In charge of Plant Piping, Pre-Fabrication at site and Erection, hydro Test and final box-up.

Conduct piping system punch list completion activity.

Co-ordinate with client representative for the final visual inspect of the completed system prior to final had over.

Prepare punch list and issue to construction team to clear.

Prepare as built drawings as per requirement.

Maintaining Proper housekeeping of the Work Location.

12. DEC. 2001 to MARCH. 2003

Position : Piping Supervisor

Company : Consolidated Contractors Company W.L.L.

Client : Saudi Aramco

Project : Haradh Gas Project.

Responsibilities:

Study the work plans / drawing to determine the work to be done.

Raise queries regarding drawing discrepancies.

Co-ordinate with engineering and other related disciplines regarding work plans and other activities.

Prepare as built drawings as per requirement.

Prepare and issue punch list to construction team to clear.

Supervise field construction activities as well as punch clearing activities.

Enforces safety in construction activities to achieve the goal in safe manner.

Maintaining Proper housekeeping of the Work Location.

13. NOV.2000 to AUG.2001

Position : Piping Supervisor

Company : Consolidated Contractors Company W.L.L.

Client : Saudi Aramco

Project : Hawiyah Gas Project

Responsibilities:

Attend co-ordinate / scheduling the meeting with area engineers, and related discipline supervisors and contractors.

Review comments and approve the work method statement and ensure the procedures to satisfy the project specification.

Co-ordinate and interface with schedule requirement with area engineers and other related disciplines.

Prepare testing schedule.

Study the test limits and check existing plan against new one.

Prepare as built drawings as per requirement.

Prepare punch list and issue to construction team to clear.

Maintaining Proper housekeeping of the Work Location.

14. NOV.1998 to AUG.2000

Position : Piping Supervisor

Company : Consolidated Contractors Company W.L.L.

Client : Chiyoda Petro Star Limited KSA

Project : Sharq Second Expansion Project.

Responsibilities:

Studies the plans and working drawings to determine extend of work to be done, materials and equipment to be sued.

Prepares, co-ordinates, assign and controls schedule of activities giving priority to critical areas, requisition for materials and equipment needed. Conducts routine inspection on progress of work to ensure conformity with plans and specifications and reports it to superior.

Enforces safety rules and regulations to ensure maximum protection to life and property.

Performs other related duties as may be assigned from time to time.

Checking of re-fabricated spools (Line medication)

Supervise piping installation and other field works.

Prepare and checking as built drawings.

Prepare punch list and issue to construction team to clear.

Supervise punch clearing, line testing and line Re-instatement.

Maintaining Proper housekeeping of the Work Location.

15. FEB.1998 to NOV. 1998

Position : Piping Supervisor

Company : Consolidated Contractors Company W.L.L.

Client : Bechtel Ltd KSA

Project : Shaybah Producing Facilities

Responsibilities:

Supervise the pipe erection activities.

Control of Packages and material storage.

Reviewing of Test Packs, line checking and punch points closing prior to Testing.

Assist to close punch points in order to speed up test activities.

To monitor the preparation of testing activities like Hydrostatic, pneumatic and service test.

Supervise punch preparation and punch closing activities.

Maintaining Proper housekeeping of the Work Location.

16. SEP.1997 to FEB.1998

Position : Piping Supervisor

Company : Consolidated Contractors Company W.L.L.

Client : Saudi Aramco

Project : RasTanura Refinery Upgrading Project

Responsibilities:

Installation of pipe spool erection for process & utility line.

Re-fabrication of missing spool (modified piping spools)

Installation of piping for lube oil system (steam turbines and compressors)

Hydrostatic / Pneumatic testing of piping system as per test package.

Final checking of re-installed piping lines.

Supervise punch clearing and line testing activities.

Maintaining Proper housekeeping of the Work Location.

17. MAR.1996 to SEP.1996

Position : Piping Supervisor

Company : Consolidated Contractors Company W.L.L.

Client : Equate Petrochemical Company Limited

Project : Equate Ethylene Project Kuwait.

Responsibilities:

Supervise the cracking gas furnace piping and other areas piping.

To monitor the Piping activities. (Erection, fit up, and tie-in)

Prepare furnace piping schedule and spools status.

Conduct rigid line checking.

Prepare punch list.

Supervise punch clearing, line testing and line re-instatement.

Maintaining Proper housekeeping of the Work Location.

18. APRIL. 1993 to SEP.1995

Position : Piping Foreman

Company : Consolidated Contractors Company W.L.L.

Client : Chiyoda Petro Star Limited, Bechtel Limited.

Project : LNG Project Das Island Abudhabi. OGD -1 project HabsanAbudhabi

Responsibilities:

Supervise the day-to-day Erection activities.

Supervise the installation of piping components and other related things.

Hydrostatic / Pneumatic testing of pipes and equipment.

Pre-fabrication of piping spools.

Conduct routine inspection on progress of work.

Maintaining Proper housekeeping of the Work Location.

19. APRIL. 1992 to APRIL.1993

Position : Foreman

Company : M/S ECC Larson & Toubro limited.

Client : Manali Refinery Limited India

Project : MRL Expansion Project.

Responsibilities:

Prepare schedule for work implementation.

Prepare spool marking in drawing, before fabrication of pipe spools / supports.

Assign work force to respective area.

Enforces safety rules and regulations.

Give assignment, giving priority to critical areas.

Checking of Pre-fabricated spools prior installation.

Conduct routine inspection on progress of work to ensure conformity with plan and specification

Maintaining Proper housekeeping of the Work Location.

20. APRIL. 1991 to MARCH. 1992

Position : Foreman

Company : Kirubha Erectors.

Client : M/s BHEL limited India

Project : Neyveli Thermal Power Station II.

Responsibilities:

Prepares schedule for fabrication / installation.

Assist the piping supervisor in work implementation and sees to it that work is complete as per schedule.

Ensure the quality of fabrication and installation of pipes / supports.

Prepare daily progress report noting down, encountered and anticipated problems.

Advance preparation of punch list.

Enforces safety rules and regulations in construction activities.

Maintaining Proper housekeeping of the Work Location.

Computer Proficiency : Smart Plant Review and Auto cadd.

Driving license no. : Indian driving license # TN31 199********

Driving license no. : Qatar driving license # 268********

.

Personal Information

Age : 50

Date of Birth : 10.07.1968

Place of Birth : Tamil Nadu – India

Civil Status : Married

Nationality : Indian

Sex : Male

Passport No. : J 9421827

Date of Issue : 09.12.2011

Place of Issue : Chennai

Date of Expiry : 08.12.2021

Blood Group : O +ve