Post Job Free

Resume

Sign in

Manager Construction

Location:
Durban, KwaZulu-Natal, South Africa
Salary:
Neg
Posted:
June 23, 2019

Contact this candidate

Resume:

Personal

Nationality: South African

ID Number: 620********** (53)

Date of Birth 19 /08 / 1962

Gender: Male

Marital Status: Single

Home Language: English

Other Languages: Afrikaans / Zulu

Drivers License: Yes

Passport: Yes

Phone: 073******* / 078*******

EDUCATION

Secondary:

Institution: Evander High School

Qualification: Standard 9

Completed 1978

:

Tertiary:

Institution: Evander Technical Collage

Qualification: NTC 2 - 6

Completed: 1980:

Additional

Trade Tested Boilermaker / Plater

Department of Manpower

Olifantsfontein SECTION 13

MEZ 25619 CERTIFICATES

ADDITIONAL COURSES

Emergency first aider GOLD

Advanced safety NOSA

LEGAL LIABILIATY CERT

HIRA COMPETENT CERT

Practical Loss Control Leadership

Interaction Management

Computer Literacy

MS Office / Outlook

M S Project Management

Email ac9n55@r.postjobfree.com

SKYPE: Allen Marc Du Preez

Present Residential Area:

Kwa Zulu Natal

DURBAN

GOBLE ROAD 42

MORNING SIDE

4001

CAREER SUMMARY AND RESPONSIBILITIES

I enjoy my work and enjoy challenges

KEY COMPETENCIES AND SKILLS

Fabrication and Welding: Ferrous, Non Ferrous and Duplex Steels

Structural Steel: Fabrication, Erection, Mechanical Installation and Plant Commissioning

Bulk Material Handling: Tanks, Silos, Conveyors, Conveying Pipelines

Pipelines: Fabrication and Installation

Pressure Testing, Purging, Pigging and Commissioning

Heat Exchangers, Driers, Vessels

Project, Site & Operational Management

Health and Safety Regulations (OSH Act 85 of 1993 and Mine, Health, Safety Act 1996)

Implement and Control SHE Management

Computer Literate, MS Works, Project

Contract negotiations, Tenders & Bid Management

Construction materials

QA/QC: Quality control, Quality Plans, Welding Procedures, Mechanical Inspections.

Cold and Hot Commissioning. Construction Site Establishment

Conveyor belt roller frames; Feeders; Magnetic box Chutes; Wet drum chutes;

Plate replacement on buckets of tippers, pay loaders, graders, rollers, mould boards, water trucks, extractor fans and construction machines. Maintenance of all mobile equipment and machines.

Heavy fabrication and repair of buckets, truck bodies and GET’s.Construction

COMPANY

ANMAR AFRICA

IMPALA SMELTER FURNACE REBUILD

ANMAR AFRICA ANGLO AMERICA POLOKWANE SMELTER FURNACE RING REPAIR

HATCH SOUTH AFRICA

RUSTENBURG ANGLO AMERICA WATER-FALL SMELTER

REBUILD

MORECARE ENGINEERING ARCELOR MITTAL NEWCASTLE SOUTH AFRICA

ENZA ENGINEERING SERVICES KZN SOUTH AFRICA

PHOENIX WASTEWATER TREATMENT WORKS UPGRADE

JCR STEEL SOLUTIONS SAPPI NGODWANA SHUTDOWN

SOUTH AFRICA

S & N ENGINEERING

AMATIKULU SUGAR MILL SOUTH AFRICA

WATTPOWER SOLUTIONS

TPL KLERKSDORP TRANSNET PIPELINES DEPOT SOUTH AFRICA

PHILCON ENG

NORTHERN CAPE XINA SOLAR PLANT

ABENSIA

SOUTH AFRICA

IMPROVAIR /SOCLIMA MOZAMBIQUE

MAPUTO

BANK OF MOZAMBIQUE

3C METALS SUBSEA 7 TEN PROJECT SOUTH AFRICA

CAPE TOWN

POSITION

SITE SUPERVISOR

2.9.2

PIPING TEAM LEAD

SMPP SUPERVISOR

\

SITE MANAGER

HANDS ON MECHANICAL / PIPING SUPERVISOR

BOILERMAKER SUPERVISOR

SITE SUPERVISOR

ASST CONTRACTS MANAGER /

HANDS ON SITE SUPERVISOR

ASSISTANT SITE MANAGER

SITE HANDS ON FABRICATION SUPERVISOR

SENIOR CONSTRUCTION SUPERVISOR / HANDS ON

PROJECT PIPING SUPERVISOR

DATE

06/01/2019 TO 17/04/2019

01/08/2018—01/09/2018

21/3/2018-24/07/2018

03 JANAUARY 2018 -20/3/2018

06 JUNE 2017- 20TH OCTOBER 2017

WORKS COMPLETED

6 MAY 2017- 16 MAY 2017

JAN 2017 – April 18, 2017

FEB 2016- OCT 5/10/2016

SEPTEMBER 2015 – DEC 2015

APRIL 2015—AUGUST 12TH

JAN 2015-

MARCH 2015

RESPONSBILITIES

LEAD TEAM IN THE DEMOLISHING OF ELECTRIC ARC FURNACE AND REBUILD THE SAME

HEAVY ENGINERING IN HEAVY GAUGE PLATE WORK AND ALL HEAVT STRUCTURE STEEL WORKS

FABRICATION AND MODIFICATIONS TO ALL TUNDISH LOW PRESSURE PIPING OF FURNACE LEAD TEAM OF PIPE FITTERS AND MECHANICAL FITTERS, WELDERS TO COMPLETE THE SCOPE OF WORK

OVERSEE SUB-CONTRACTORS ON THE REBUILD OF THE ACP FURNACE, LEAD A TEAM OF 40 MEMBERS IN THE INSTALLATION OF ALL HP PIPING, LOW PRESSURE PIPING, WELDING OF ALL STRUCTURAL AND FURNACE SIDE PANELS

REVIEW ALL QUALITY DOCUMENTATION, ISSUE PERMITS TO WORK, MAKE SURE TEAM COMPLY WITH ALL HEALTH AND SAFTY REGULATIONS

OVERSEE THE MODIFICATIONS

THE AMBEINCE ESP REFURBISHMENT OF A BAGFILTER

END OF CONTRACT

COORDINATE THE FABRICATION AND INSTALLATION OF ALL DEWATERING PIPING, PROCCESS PIPING, SCREENS, SCREW PUMPS AND POLLY LINES

CO-PLANNING OF DAILY TEAM WORK WITH SITE MANAGER, COORDINATION OF MATERIALS AND ACTIVITIES WITH SITE MANAGEMENT, ACCURATE KEEPING OF TIMESHEETS AND SITE DIARIES,SITE QUALITY CONTROL,HEALTH AND SAFETY MANAGEMENT AND REPORTING, ASSISTANCE WITH COMMISSIONING, DIAGNOSIS OF PROBLEMS AND REPAIRS TO FAULTY EQUIPMENT, ASSIT CONTRACTORS ON SITE IF INSTRUCTED, INTERPRETING OF TECHNICAL DRAWINGS, MANUAL ASSISTANCE AND LABOUR AS REQUIRED, UTLIISATION OF SKILLS WHEN REQUIRED I.E FITTING, WELDING, ETC

LEAD A TEAM OF BOILERMAKERS IN THE REFURBISHMENT OF THE COAL SILOs 5 OFF IN TOTAL DO CUT OUTS ON SILO SHELL AND INSERT NEW SHELL STRAKES MAKE SURE ALL SAFTEY PROCEDURES ARE ADHEARD TO AT ALL TIMES PLUS TIME KEEPING

END OF CONTRACT

LEAD PROJECT TEAM ON VARIOUS PROJECTS

ENSURE SAFETY IS ADHEARD TO AT ALL TIMES

REMOVE AND FABRICATE NEW EVAPORATOR PIPING 32 “ SCH 40 PIPE 90 +45 +30 DEGREE LOBSTER BACKS AND INSTALL 90 METERS OF PIPING ON EVAPORATORS

FABRICATE AND INSTALL SPLITTER BOXES ON VARIOUS AREAS

FABRICATE AND INSTALL MAIN WATER SUPPLY PIPING 48” PIPING INCLUDING ALL LOBSTER ELBOWS, FABRICATE AND INSTALL,3CR12 X 1METER SQUARE X 120 METERS OF DUCKTING

WORKS COMPLETE E.O.C

OVERSEE THE CONSTRUCTION WORKS TO ENSURE ALL ASPECTS OF THE PROJECT SCOPE i.e DOCUMENT CONTROL,PROCRUMENT,FABRICATION,PAINTING,QUALITY ASSURANCE,QUALITY SURVEYING,DELIVERIES TO SITE, AND THE ERECTION ARE INTERGRATED AND EXECUTED WITH IN THE AGREED PROJECT TIME,COST,QUALITY AND SAFETY REQUIREMENTS

LEADING,GUIDING, MANAGING OF PROJECT TEAM,UPDATING SCHEDULES I.E QCPS, PROGRESS REPORTS,MONTHLY CLAIMS,CONTRACTURAL LETTERS, STATS,ETC

FABRICATE AND INSTALL NEW FIRE WATER SYSTEM CONSISTING OF 6”,4”CARBON STEEL LINES, CONSTRUCT NEW FIRE PUMP HOUSE,HANDS ON IN THE FABRICATION OF ALL PIPING CONSISTING OF FROM 12’ DOWN TO 4”, FABRICATE 2” STAINLESS STEEL AND INSTALL ON FOAM SYSTEM IN NEW FIRE PUMP HOUSE

WORKS COMPLETED (EOC)

CORDINATE THE FABRICATION AND INSTALLATION OF THE WATER TREATMENT PLANT WHICH INCLUDES THE FABRICATION AND ERECTION OF 3 OFF 12MT DIAMETER STAINLESS STEEL TANKS TO API 650 SPECS

ALL PIPING 6” TO 2” STEEL AND HDPE PIPING ALL SKIDS, FIBRE WOUND TANKS,CHEMICAL DOSING HOLDING TANKS, ALL ELECTRICAL RACKS AND CABLING, LIAISE WITH CLIENT WITH ALL SITE ISSUES, MAKE SURE ALL QC PACKS ARE UP TO DATE UP TILL HAND OVER TO CLIENT

WORKS COMPLETED

END OF CONTRACT

OVERSEE THE SUB- CONTRACTOR ON THE FABRICATION AND INSTALLATION OF THE CHILLED WATER SYSTEM HVAC PIPING RANGING FROM 400MM DIAMETER DOWN TO 15MM PIPING ALL WELDS 100 PERCENT X-RAYS COACH SUB –CONTRACTOR ON ALL CORRECT PROCEDURES ON THE FABRICATION AND WELDING

HYDRO TESTING ON ALL PIPING AND SPOOL PIECES PUNCH LISTING OF SYSTEMS AND HAND OVER TO CLIENT

WORKS COMPLETED

END OF CONTRACT

SET UP AND OVERSEE THE FABRICATION OF SUBSEA PIPING FOR THE TEN PROJECT IN GHANA OIL AND GAS

OVERSEE AND CONTROL THE FABRICATION OF DUPLEX AND SUPER DUPLEX 2” PIPING AND SET UP CONTROL MEASURES

SET UP AND CONTROL THE FABRICATION OF 6”, 8” INCANAL PIPING

WORK CLOSE WITH THE QUALITY DEPARTMENT IN THE COMPLETION OF ALL WORKS

WORKS COMPLETED

END OF CONTRACT

Shanahan Eng

Kusile Power

Station

WITBANK

Alstom Power S A

Medupe Power

Station

FOSTER & WHEELER

SOUTH AFRICA

DURBAN

IDWALA LIME Mine

Northern Cape

KENTZ

CONSTRUCTION

RICHARDSBAY

FOSKOR

BEVLINE

ENGINEERING

MADUPE

POWER

STATION

SOUTH

AFRICA

Group 5

International

MENA

Middle East

Jordan

DISI WATER

PROJECT

AUX BAY

Piping

Supervisor

COMMISSING

Piping Supervisor

TANKAGE

PIPING

SUPERVISOR

CONSTRUCTION

KILIN

SUPERVISOR

BOILERMAKER

SUPERVISOR

PIPING

SUPERVISOR

Pipe line

Superintendent

/ Supervisor

May 2014

Jan 2015

JAN 2014-

MAY 2014

JAN 2013-

Jan 2014

AUG 2012-

JAN 2013

JULY2012

TILL

AUG2012

MARCH 2012-

June 2012

Jan 2011-

Sep 2011

INSTALL BALANCED, FEED WATER PIPING 588mm DIA,MAIN STEAM 550mm DIA,COLD REHEAT 825mm DIA,HOT REHEAT 800mm DIA. ALL SPOOLS BALANCED ON LOAD CELLS . INSTALLATION DONE FROM AUX BAY TO TURBINES, ALL SPOOLS FITTED UP WITH A J PREP WITH THE USE OF EXTERNAL PIPE CLAMPS

1) Oversee and be responsible to assist the construction manager in all erection

activities on the Boiler.

2) Control man hours allowed for erection, ensure all budgets are met or improved

3) This includes updating construction schedules and assisting with drawing up of

construction schedules.

4) Ensure high standards of safety and quality are adhered to.

5) Assist the Construction Manager in running the site in a safe manner and within

budget and on time

END OF CONTRACT

PRESSURE TEST OF FEED WATER LINES FROM FIN FANS, CP PUMPS TO TURBINES PIPING VARIES FROM 600mm TO 150mm FABRICATE SPOOLS FOR PRESSURE TEST AT ALL VALVE POINTS . COMMISION ALL AUXILIARY PIPE LINES FROM FIN FANS TO TURBINE HOUSE

Construction Support to Commission Dept

On the commission of all H P Piping on

Turbine

End of Contract

OVERSEE THE CONSTRUCTION OF 24” PIPE LINES FROM TANKAGE TO NEW PUMP HOUSE,DO MODIFICATIONS ON CERTAIN STORAGE TANKS CUT OUT TANK NOZZLES AND REINSTALL PRE FABRICATED INSERTS WITH NOZZLES ALL 24” PIPING

Ensure that all construction contractors’ supervision and manpower are instructed in and comply with all aspects of the Health, Safety, Environment and Security (HSES) policy, site regulations, permit to work procedures and instructions and Client requirements.

Ensure that construction contractors working within his discipline adhere strictly to the latest Approved for Construction (AFC) project drawings, Specifications, ITP’s, Procedures and Site Instructions.

Responsible for the HSES, and quality aspects of the work within assigned areas and for ensuring construction contractors complete their work in accordance with the project schedule

Review and monitor the availability of drawings, specifications, job instructions, material deliveries and tools applicable to his/her particular discipline and area of work.

In conjunction with the contractors’ supervision, planning engineers, and the Construction Engineer, develop detailed daily and weekly work plans in accordance with the overall planning schedule.

Inform the Discipline Superintendent on specific areas where the programme needs to be adjusted in accordance with site conditions and material deliveries.

Continually review material and equipment deliveries and report discrepancies and/or shortages to the Discipline Superintendent and Material Controller.

Routinely review the construction contractors’ scope within his area as detailed in drawings, specifications, requisitions and instructions, ensuring contractors proper interpretation and compliance with latest revision AFC issues.

Ensure proper control of changes by assisting the Discipline Superintendent to issuing FI’s for all changes, reviewing TQ’s to ensure responses are appropriate and practical, review and action ARN’s to ensure correct use of construction resources.

Ensure that contractors record all quality control checks, and that all quality documentation is available for inclusion in the handover dossiers. Ensure all quality control checks and tests are executed in accordance with the contractors’ agreed ITP, method statements and project specifications.

Witness, inspect and maintain surveillance checks on contractors work in accordance with the site quality plan requirements, and agreed ITP’s. Ensure that all inspection activities are recorded in the appropriate records.

Carry out progressive punch listing to ensure that the works are completed to the fullest extent possible prior to acceptance.

Responsible for monitoring the discipline and timekeeping of contractors’ staff and labour in a defined work area, identifying any disciplinary action required, and informing the relevant Discipline Superintendent.

Review contractors’ manpower, plant, equipment, and coordinate resource requirements with the Discipline Superintendent in a timely fashion to ensure a high level of productivity. Continually monitor the need for contractor overtime and obtain approval of the Discipline Superintendent when required.

Ensure plant equipment certification is current and available at site with inspection and maintenance carried out in the prescribed manner.

Inform the Discipline Superintendent of the availability of contractors plant and/or tools as they become surplus to his area requirements.

Assist in maintaining proper security and safeguards over and Client property, equipment, tools and materials, ensuring, by good housekeeping that items are not left around the site with a risk of loss or damage.

Assist the Discipline Superintendent in preparing all reports relative to the work progress in his area and attend progress meetings as and when required.

Inform the construction contractors within his area of any changes to Client or site policy and ensure that any complaints or grievances are immediately advised to the Discipline Superintendent for action.

Continually monitor the installation progress comparing planned and actual progress measures claimed by the Contractor. Inform Discipline Superintendent of shortfalls and anomalies.

End of contract

CONSTRUCT TWO VERTICAL KILNS

Lead team in the construction of 2 vertical kilns

Fabricate and install all utilities and process lines Ranging from 8” to 2” carbon steel

Install all conveyor belt systems +- 6km off

Install all structure steel work

WORKS COMPLETED

END OF CONTRACT

LEAD TEAM OF BOILERMAKERS

ON THE REMOVAL OF BAG FILTER PLANT

STRUCTURE AND INSTALL ALL NEW STEEL

WORK

STRIP ACID STORAGE TANK 24MT DIA 19 MT HIGH AND REBUILD SAME

REINSTATE ALL PLATFORMS AND WALKWAYS AND STAIRWAYS

WORKS COMPLETED

END OF CONTRACT

LEAD PIPING TEAM CONSISTING OF PIPE

FITTERS AND WELDERS ON THE INSTALLATION OF 1”, 2”,4”

PIPES ON BOILER Auxiliary

SUPERVISE FABRICATION IN FABRICATION

WORKSHOP

Understanding PI&D's, Isometrics and GA's relative to scope of work

• Update progress versus workload and planning to the Construction Manager

overall responsibility for managing personnel and construction activities within his assigned area on

site, in compliance with the site procedures and orders received from the Construction Manager;

END OF CONTRACT

Construct 66 inch overland Water convey

Pipe line 120 km long

Supervise the Coding of Welders in the Stove

Piping Technique Uphill and downhill STICK

SMAW

Set up and Train personnel in Automatic Welding

FACAW

Set up and train personnel in Semi Automatic

Welding Or known as Co2 welding

Supervise the setting up of external bevel mill on 66

Inch pipes

Supervise the operation of 66 inch internal pipe clamp

• Supervise prefabrication in yards

• Assist Manager with definition of consumables, tools, and equipment requirements

• Preparation and mobilization of materials and equipment prior to works

• Lead construction team (pipe-fitters, either local or expatriate personnel )

• Confirm to the Construction Manager on a daily basis the personnel requirements for Welders, Pipe-fitters, Riggers, and Scaffolders linked to their own activity

• Propose modifications if clashes/problems are encountered due to incorrect/inexact engineering

• Update progress versus workload and planning to the Construction Manager

• Assist Pre-commissioning / Commissioning team

WORKS COMPLETED

END OF CONTRACT

Steel dale

Engineering

Durban

Workshop

Manager /

Supervisor

JAN 2011

DEC 2009

Overall responsibility for Health, Safety & Environment in assigned area of responsibility. Champions compliance with health and safety regulations and a ‘’zero accident’’ culture, and makes this mandatory throughout the area team; is pro-active with personnel to promote a safe and hazard-free work environment

Monitor the daily production on Vertical and horizontal boring mills and lathes

Assist Artisans on a daily basis in workshop on

Lathes,boring mills, milling machines, fabrication,

Developments,and the quality control in all welding

Techniques TIG,SMAW,

Fabrication of Various

Structural and other Steelworks .Developments Square to Rounds, Pipes, Hoppers

Tank Fabrication 24 mt dia by 19 mt high

Supervise prefabrication in workshop

Supervise site installations

Reason for leaving:

Opportunity to work Overseas Jordan

Gain Expat Experience

Hydro Turnkey

Projects

Steelpoort

NORTHWEST

PLATIUM MINE

Workshop

Manager /

Supervisor

Jan 2008-

Dec 2009

Supervise the operation of vertical and horizontal

Boring mills in workshop and on site

Fabrication and repairs on Drill

Frames, Screw Conveyors, Bucket

elevators, Belt Trippers and Rotary

Scoop Classifiers, Fabricate Feed

Chutes, Steel Structures, Water Coo-

Led Panels (Furnace Roofs).Fabric-

action and Installation of Various

Sluice Gates for Dams, Gates up to

8000 Kg’s. Fabrication of Various

Structural and other Steelworks.

Fabrication of Transformer Bodies

And Tanks.

Carried out scheduled and unscheduled line maintenance tasks, base check and snag ratification

( Prepared and controlled Maintenance Planning Documents (MPD), and compiled required assessment tools for Production Planning Control (PPC)

( Reviewed and maintained work control documents, Directives, Service Bulletin and Technical Service to ensure compliance standards are met

END OF CONTRACT

Group 5

Construction

Sapref

Shell Oil

Refinery

Durban

Boilermaker /

Piping

Supervisor

Dec 2007-

Jan 2008

● Overall responsibility for Health, Safety & Environment in assigned area of responsibility. Champions compliance with health and safety regulations and a ''zero accident'' culture, and makes this mandatory throughout the area team; is pro-active with contractors to promote a safe and hazard-free work environment;

● provides assistance to the Safety Manager and safety coordinators to ensure a safe work site, and attends safety meetings with the contractors;

● overall responsibility for managing personnel and construction activities within his assigned area on

site, in compliance with the site procedures and orders received from the Construction Manager;

● determines manpower requirements and coordinates construction plans prepared for the area together with associated schedules; coordinates work to be performed;

● participates in the overall supervision, coordination and direction of contractors' activities within the designated area in conjunction with the other superintendents / coordinators and the safety coordinator;

● ensures that all construction activities within the designated area are well planned, coordinated and prioritized, and makes best use of the available resources;

● ensures that all work packages are executed safely, in compliance with the prescribed quality standards and design specifications and in accordance with the cost and schedule requirements

Supervise Argon welders and assist welders

When problems arise

Understanding PI&D's, Isometrics and GA's relative to scope of work

Experience in leading teams and managing people's performance

Ability to give instruction and to be understood in English spoken and written

Reason for leaving:

END OF CONTRACT

KENTZ

Construction

E & I

Engen Oil

Refinery

Durban

BOILERMAKER

Mechanical

Supervisor

-AUG2006

Dec 2007

Installation of cable racks

Removal of process valves

Refurbish of process valves

Time keeping, and project

Planning, making sure that H.S.E

Standard are kept all time.

Making sure all fabrication

is done to Q C P specs

Fabrication of pressure

Vessels i.e. Heat Exchangers fabrication of all staircase steelwork Fabrication of all Process

And utilities piping

● ensures that all construction activities within the designated area are well planned, coordinated and prioritized, and makes best use of the available resources;

● ensures that all work packages are executed safely, in compliance with the prescribed quality standards and design specifications and in accordance with the cost and schedule requirements;

END OF CONTRACT

LTA

Grinaker

Sappi Sycor

South Coast

K Z N

MORECARE

ENGINEERING

RICHARDSBAY

RENNIES CARGO TERMINAL

J H B BRANCH

SAMANCOR

KRUGERSDORP

PLANT

Fabrication /

Piping

Supervisor

JAN 2006-

AUG 2006

BOILERMAKER

SUPERVISOR

FEB 2002 –

JAN 2006

BOILERMAKER/

FOREMAN

JULY 1996 –

FEB 2002

BOILERMAKER

APRIL 1986-

JULY 1996

Tank, Storage Vessel Fabrication 24 mt dia

Fabricate new 6 inch -24 inch pipe lines

Install pipe lines

● ensures that all work packages are executed safely, in compliance with the prescribed quality standards and design specifications and in accordance with the cost and schedule requirements● participates in the overall supervision, coordination and direction of contractors' activities within the designated area in conjunction with the other superintendents / coordinators and the safety coordinator;

● ensures that all construction activities within the designated area are well planned, coordinated and prioritized, and makes best use of the available resources;

● ensures that all work packages are executed safely, in compliance with the prescribed quality standards and design specifications and in accordance with the cost and schedule requirements;

END OF CONTRACT

:FABRICATE AND INSTALL BAG FILTER

PLANT ON FOSCOR ACID PLANT

TANK (VESSEL) FABRICATION

FABRICATE PONTOONS FOR RBM

AND ALL WALKWAYS, STAIRWAYS AND

PLATFORMS

REFURBISH BAG FILTERS ON MONDI

RICHARDS BAY PLANT AND CARRY OUT

MAINTENANCE ON SAME BAG FILTER PLANTS

TIME KEEPING AND PROJECT MANAGEMENT

OVERSEE ALL MAINTENANCE ON ALL BIG

FIVE COMPANYS IN RICHARDS BAY

END OF CONTRACT

FABRICATION AND ERECTION OF BAG FILTER PLANTS ON PALMIET CHROME SMELTER

FABRICATION OF HOT WATER BOILERS

FABRICATION OF 6MT AND 12MT CONTAINERS

CONTAINER REPAIRS

PIPE DEVELOPMENTS AND SQUARE 2 ROUND DEVELOPMENTS

FABRICATION AND INSTALLATION OF CONVEYOR SYSTEMS

RETRENCHED

FABRICATION OF BAG FILTER PLANTS AND INSALLATION OF SAME

OPEN ARC FURNACE MAINTENANCE

PLANT MAINTENANCE

MAINTENANCE ON BAG FILTERS

PIPE FABRICATION

RETRENCHED

Hobbies and Interests

Fishing, Camping, Reading

GENERAL SUMMARY OF KNOWLEDGE SKILLS AND EXPERIENCE

SNR (Management) Construction Piping/Mechanical Superintendent/Piping Field Engineer/QC Inspector. With more than 33 years experience (including Middle East) in the petrochemical /oil refinery industry on large construction projects /extensions / shutdowns / turnaround / from erection stages to system completion, handover and commissioning

• Thorough understanding and knowledge of oil and gas production and operating facilities.

• Excellent working level knowledge of all EPMC Contractors work phases, in required disciplines

• Experience and understanding of working across many cultures in an international execution environment. Sound communication, interpersonal and coordination skills coupled with good intercultural intelligence.

• Knowledge of practices and procedures for project control,

• Knowledge of the Construction and Procurement aspects of EPC project execution

• Knowledge of the Safety requirements of the EPC industry, from a design and construction viewpoint, as well as Quality Assurance and environmental aspects of major project execution

• Competent ability to read and interpret design engineering drawings and specifications.

• Working knowledge of typical Safety Regulations and Procedures for oilfield related facilities from both a design and construction viewpoint, as well as Quality Assurance and environmental aspects of major project execution

• Strong oral and written communication skills., able to deal with senior management on all scales

• Excellent team player with motivational skills, can handle multiple tasks under a medium level of stress in the typical dynamics of a large scale Construction Project

• PC literate MS Office AutoCAD 2004

• Excellent knowledge of relevant International codes and standards / industry practices (ASME ANSI API DNV)

• QC QA Administration

• Leadership, management, organizational skills

• Customer / Team Focus

• Problem solving abilities and innovative approach. Disciplined, energetic and determined to make things happen.

• SIGNIFICANT all-round technical and relevant large scale construction project experience in multi disciplines

It is apparent from the aforementioned that my strength lies in many years of my working experience. I am confident in saying that I am able to communicate at all levels and can be relied upon to fulfill the positions of managing staff.

I am well adapted in working in an environment of extreme pressure. I have always been punctual and have an excellent attendance record at work. My work is always my priority. I am always willing to assist where possible. I am transparent and am always willing to go the extra mile when duty calls.



Contact this candidate