Eduardo Rosero
Objective,
Seek a position where I can fully utilize my skills and capabilities through my experience at the same time contribute for the attainment of the company's goal, to my remaining productive years.
Work Achievements,
- Operate and maintained to useful life with innovation an integrated Poultry Project for 12 years.
- Operate and maintained the ADB HQ Facility O&M for 7 years at the highest degree of professional integrity with no
major breakdown, and complied with different ISO, and LEED requirements.
-Assisted Tertiary Hospitals in the JCIA Accreditation
Willing to relocate: Anywhere
Manual Drafting,
Project Management,
Computer literate
Forklift Operator
B.S. in Mechanical Engineering
Professional Mechanical Engineer
ASEAN Registered Engineer
Century Property Management, Inc.
member of the Century Property Group
August 2012 to March 2019
6th Floor Pacific Star Bldg.
Gil Puyat Ave., Makati City
Assigned at,
- Asian Development Bank(ADB) Headquarter, and Business Continuity Facility
Ortigas Center Mandaluyong City, and Clark Pampanga, Philippines
August 2012 to March 2019
Facility Manager and General Supervisor for Operations and Maintenance(O&M) of the Bank 6.5 Hectares Bldg. Grounds, Utility and Facility.
1.Conduct the Facility Rounds monitoring of the 24/7 operation.
2.Daily Supervision of the Building. Grounds, Utility, BMS, MEPF, STP activities, monitoring of Preventive, and
Corrective Maintenance, for ADB Headquarter(HQ)
and Clark Pampanga Business Continuity Facility(BCF), a total of 95 Engineers, and Technicians. According to
the Service Level Agreement(SLA) contract.
3. Maintained the Six Sigma, ISO 50001, ISO 14001.45001,\ OSHA 8001, and LEED of the facility.
4. PLOC of Operation, and Maintenance to meet the SLA requirement.
5. Report to the Lead Bank Facility Management, Senior Engineering Officers, the CPMI VP for Technical
Services, and Property Operations.
6. Prepare the monthly Operations and Maintenance performance Report. Century Property Management Inc.
- Makati Medical Center
January 2011 to August 2012
Facility Manager and Chief Engineer
1. Daily Supervision of the Hospital Building. Grounds, Utility, and MEPF activities, monitoring of Preventive, and
Corrective Maintenance, according to the Service Level Agreement(SLA) contract.
2. Weekly Facility Tour and rectification of findings.
3. MMC Preparation, and presentation of monthly Operation Performance Report according to KPI, and Service
Level Agreement ( SLA).
4. Unit Emergency Response Manager.
5. Report to the CPMI VP for Technical Services, and Property Operations.
6. Report to Makati Medical Center AVP, and Bldg. Grounds Manager.
7.Conduct Facility and Building Engineering Audit to different clients of CPMI.( Audited Makati Cinema Square,
Toffany Place Condominium, and Aircon Inspection of Essensa. )
Asian Hospital and Medical
August 2008 to August 2010
2205 Civic Drive
FILINVEST Corporate City,
Alabang, Muntinlupa City,
Philippines
Tertiary Hospital, 217 Beds
Director for Plant Operation Division(POD )/Facility Management and Safety. Medical Center Facility Management
1. Planning, Leading Organize, and Control of the 7Hospital Management Plan following
2.,- Facility Engineering,( Stand By 4. 5 Megawatt GenSet,1.5 k Tons Trane Water Chillers, AHU, MEPF,BMS,
Electro Mechanical, Building Facility Maintenance, Energy Savings and Facility upgrading.
- Bio-Medical Equipment Maintenance Facility.
- Hospital Safety
- Security
- Emergency Response Team Deputy Chief/Incident Commander.
- Environmental, Hazardous Waste Facility (WTF),-
- Fire and Safety.
3. Report to the President and Chief Finance Officer.
Cardinal Santos Medical Center
February 2008 to August 2008
Tertiary Hospital
No.20Wilson St. Greenhill's,
San Juan City, Metro Manila
Facilities Management and Safety Manager (FMS)
Medical Center Facility Management
1. Planning, Leading and Organize the Hospital Civil Maintenance Section. Planning, Leading, and Organize the
Hospital Electrical Mechanical Equipments and Biomedical Equipments.
2. Planning, leading, Organizing and Control of the JCI, 7 Management Plan (Safety, Fire Safety, Emergency, Hazardous, Medical Equipment, Security and Bldg. Utilities Equipments HVAC, MEPF, WTF, GenSets).
3. DENR Accredited Pollution Control Officer of CSMC from November 2007 to February 2009.
4. Report to the Managing Director.
COCACOLA BOTTLERS PHILIPPINES INC.(CCBPI)
AP GENCO NORTH SERVICES INC
July 2006 to February 2008
Operations and Maintenance Contractor operating the Sta. Rosa Laguna Plant.
- 12MW BFO Power Plant
- CO2 Plant
Operations Manager
1. Planning, Organizing and Control of the Operations for Base Load 12 MW Rolls Royce Gen Sets, 1,800 Hp
(Boiler)Steam Generation Units, and assure the Continuous Profitablecost of Operations.
2. Planning Organizing and Control of the Maintenance.TPM, Supervise Preventive/Corrective activities, Oversee that all Machineries are in good Working/operating conditioned
3.Set up and monitoring of the Preventive Maintenance Schedule.
4. Pollution Control Officer (PCO).
5. Preparation and presentation of Monthly Operation Report (MOR), those operation standard parameters, KPI, and cost are within the Budget.
6. Report to the (CCBPI) Technical Directorate, ManufacturingManager, and to San Miguel Energy Corporation (SMCEnergy) and AP Genco.
ALBAY AGRO INDUSTRIAL DEVELOPMENT CORPORATION (ALINDECO)
March 2004 to June 2006
Balading, Malinao, Albay
3rdFlr. Sagitarius Bldg.
Dela Costa St. Makati City
Pulp Paper Mills using Abaca Fibers as Raw Material.
Technical Services and Maintenance Head.
1.Planning Organizing and Control of Plant Electro Mechanical and Civil Maintenance Group.
2.Project coordinator for the construction, expansion of Paper Mills No.3 (PM3).
3.9001- 2000 Internal AuditoroOther duties that are given from time to time by the Management Management.
4.Report to the Vice President for Production.
MOFELS Food International
August 2001 to January 2004
Barangay Langkaan FCIA
Dasmarinas Cavite
Food Tool Packing, for RFM, Purefoods, and Pacific Food Corp. Process Meat and Canning Operations.
Plant Engineer Maintenance Head
1. Planning Organizing and Control of Meat Processing Equipment and Cold and Freezing Storage Maintenance,
2. Head the Facility Maintenance for stand GenSets, Boilers, and Electrical
3. Report to the Plant Manager and the President.
Al Majdouie Group of Co - Riyadh, SA
May 2000 to July 2001
Riyadh, Saudi Arabia
The Largest Transport Company Providers in the Kingdom of Saudi Arabia.
Workshop Engineer
1. Planning Organizing and Control for the Maintenance of Mercedes Benz, Volvo, Scania, and Hyundai Heavy
Equipments, Trucks, Lorries, Trailers 2,500 units that enters the Riyadh Central Terminal Facility.
2. Head the Vehicle Satellite Maintenance Warehouse.
3. Safety Officer for the Terminal Facility.
4. Report to the Operations Manager of the Transport Group in Dammam Headquarter.
Philippine Jurong Engineering Ltd
June 1997 to January 1999
Calumpit, Bulacan, Philippines
● IHI 50 Megawatts Thermal Co Generation Thermal Power Plant Project
● IHI 400 Tons/Day Paper Mills Project
Sr. Mechanical Site Engineer to Project Coordinator
1. Preparation and supervision of Boiler Pipe Installation and help in erection works.
2. Reports to the Site Manager and IHI Project Manager.
3. Heads the Personnel and Purchasing Department.
4. Monitor the Construction activities and development.
5. Assures the Personnel, Materials, and Equipments availability in the site.
6. Weekly Project Cost Reports.
7. Report to the Site Manager and Country Resident Manager.
Arab Co. for Poultry Production
PO BOX 780 Fujairah
United Arab Emirate
● Fully Integrated Poultry Project of United Arab Emirates
● Poultry Processing Plant, Cold Storages, Rendering Plant, Breeder and Broiler Farms,Power Plant
1988 to 1996
Corporate Maintenance Managewr
1. Operations & Maintenance:
- 19 unit Caterpillar GenSet with combine capacity of 14 Megawatts.
- 10 Pump Stations with individual 750 cu. meter water reservoir
- 20 Tons/hour Van Aarsen Feed Mill.
- Sabroe 1,500 Tons Ammonia Refrigeration Plant (Blast freezer, chiller and cold store).
- Linco Danish brand Poultry Processing Plant 2,000 Birds/Hour.
- Van Aarsen Holland Made Feed Mill 10 Tons/Hr
- 2 Units, 2 Tons/Hr Fire tube boilers
- 11 KV transmission Line, Substations
- Road Network and 32 Water Deep wells.
- In-house workshop for fabrication and maintenance of 100 units Transport, Heavy Equipment and Plant
Equipment's.
- Compress Air Plant, and Vacuum Plant.
2. Facility Utility Operations and Management.
3. Reports to the General Manager
Plant Manager
10 TPH Feed Mill Plant
1984 to 1988
1. Planning, Organizing and Control of Production for20 TPH Feed Mill Plant.
2 . Forecast of raw material requirement and delivery of Livestock feeds to customers
3. Reports to the Production Manager
Manila Bank Group Puyat Corporate Projects
1979 to 1984
Metro Manila
- Integrated Processing Center of The
- Philippines, Inc. (IPCPI)
- Breeders Feeds, Inc. (BFI )
Farm and Plant site, Planas, San
Jose Del Monte, Bulacan
Project Engineer, Construction Engineer to Production Manager
● Poultry Dressing Plant, Ice Plant, Cold Storages,
● Rendering Plant and Feed Mill. Construction Coordinator for Electro - Mechanical
1. Training and apprentice in Holland and in Denmark.
2. Construction Designing, Planning, Scheduling and Bill of Quantities preparation.
3 . Planning Organizing and Control of the Production.
4. Annual Production Targets planning, monitoring against the Corporate Plans.
5. Managing and coordination with different Product Corporate venture.
6. Safety and Environmental Engineer of the Facility.
7. Report to the General Manager
Manila Brickworks, Inc
1975 to 1979
San Jose Del Monte, Bulacan
3rdflr. D&E Bldg. Quezon Ave.Q.C.
Ceramics Manufacturer of Construction Red Bricks
Construction Mechanical Engineer to Production Engineer
1. Engineer assigned to the Foreign Technical Consultant.
2. Mechanical Designing, Drafting, Bill of Quantities Preparation, and Site Construction Supervision. Mechanical
3. Commissioning of Production Machineries.
4. Production and Maintenance Shift Engineer.
5. Report to the Production Superintendent.
UE Automotive Manufacturing Inc
1974 to 1975
Automotive OEM Parts,
Manufacturing, Leaf Spring,
Radiator, Tire rim, Exhaust
system, and Hydraulic Jack.
Cadet Engineer/Trainee to Production Engineer.
1. Quality inspection of manufacturing materials in process.
2. Monitor all rush order in process.
3. Replace absent Line Manufacturing Foreman.
4. Manual Drafting works of new product line.
5. Filing, control of all product specification.
6. Issuance of Job Order, base on stock requirement.
7. Report to the Production Supervisor..
**********@*****.*** / *********@*****.***.**
0063-0915-4163992
Land line 006**-*******
SKILLED AND EDUCATION
Professional Work Experience