N (056-******* / (052-******* *************.**@*****.*** Dubai, UAE
+971-**-***-**** / +91-938**-***** LAKSHMAN KUMAR SUBBIAH Page 1 of 3 Lakshman Kumar Subbiah
Mechanical QA/QC Engineer Certified Welding & Painting Inspector Professional Summary: Deadline-driven & detail-oriented B.E Mechanical QA/QC Engineer with 7 years of experience in Fabrication Field (Oil & Gas) includes Pressure Vessels, Pressure Piping & Steel Structures (Site Assembly). Certified Welding & Painting Inspector (CSWIP 3.1 & BGAS Grade 2) with knowledge on Non-Destructive Testing (NDT) & Standard Codes (ASME, BSEN C O R E C O M P E T E N C I E S & H I G H L I G H T S
+ QC Inspection, Comment & Reporting + SKID Package Site Assembly
+ GA, ISO, Assembly and Detailed Drawings + Defining quality & monitoring
+ Client & TPI Inspection Coordination + Precision measuring
+ Welding Symbols, Specs & Standards + Fitup, Weld Visual & Final C E R T I F I C A T I O N S & T E C H N I C A L S K I L L S
+ CSWIP 3.1: Certified Welding Inspector (TWI) – Oct 2015 (CERT NO: 103139)
+ BGAS Grade2: Certified Painting Inspector (TWI) – Mar 2016 (CERT NO: 106839)
+ ASNT LEVEL–II: Non-Destructive Testing (NDT) RT, UT, MT, PT & RTFI – Sep 2014
+ Software Skills: AutoCAD, Pro/E, Solidworks, ANSYS (Basic) & C Programming
+ OS: Windows 10/8/7, Tools: MS Office (Word, Excel, Power Point) & Photoshop. W O R K E X P E R I E N C E
May 2012 - Present QUALITY CONTROL ENGINEER– Nash Engineering FZCO, JAFZA, Dubai, UAE
[7 Years] Duties:
QC Inspections & Reporting of Raw material, Fit-up, Weld visual, Final dimensional, Follow up NDE Activities, Stage wise Site Assembly Inspection & Final release in accordance with Engineering Standard Codes & Project Requirements. Witnessing, Reporting and Coordinating Inspections with Client/TPI. Strict adherence to safety requirements & regulations, Inspections & Final dossier. Monitoring and Control of Implemented Work Procedure as per the requirements. Preparation, submission and maintaining updates of QA/QC documents and responding to client comments and clarifications related to QA/QC procedures. Monitor planning & execution of QC inspection & preparation of QA/QC dossier. Monitoring all fabrication, welding and painting activities as per the QAP. Evaluation of test package contents, lines checking against drawing requirements to ensure completeness & accuracy of the piping system& fabrication equipment.
Stage-wise inspections and fabrication, structures and installation of equipment. N (056-******* / (052-******* *************.**@*****.*** Dubai, UAE
+971-**-***-**** / +91-938**-***** LAKSHMAN KUMAR SUBBIAH Page 2 of 3 Projects:
+ Client: National Oil Varco (NOV) RIG Systems
Project: Petroleum Development of Oman (PDO), Grey-Wolf (GW) & BURGAN Description: Platform Structures Fabrication & Generator House SITE Assembly
+ Client: JOHN ZINK/ TECHNIP / THYSSENKRUPP Project: ZAPSIB-2 Project Description: Fabrication & SITE Assembly of Derrick Structure & RISER STACK
+ Client: Lamprell Energy Limited Projects: East Anglia Offshore Windfarm, ZAKUM Field Development & Golden Eagle Area Development (NEXEN) Description: Fabrication & SITE Assembly for RIG (Boat Landing & Pipe Rack)
+ Client: Lewa Middle East-Petrofac/BP & Lewa-NPCC/ADMA-OPCO. Projects: CPF KHAZZAN Project & ZAKUM Field Development Project (PHASE-II) Description: SITE Assembly (SKID STRUCTURES, PIPING & PRESSURE VESSEL)
+ Client: Alderley FZE. Projects: JAZAN Refinery, Yanbu Development End USER: GASCO, KOC/KNPC, MAERSK OIL & SAUDI ARAMCO Description: Fabrication & SITE Assembly (SKID STRUCTURES & PIPE SPOOLS)
+ Client: SPX/HYUNDAI/SAUDI ARAMCO & IFS/GCC/SAUDI ARAMCO Projects: JAZAN Refinery-Terminal & JEDDAH South Thermal Power plant Description: SITE Assembly (SKID STRUCTURES, PIPE SPOOLS & PRESSURE VESSEL)
+ Client: ETA & SCHLUMBERGER (MI-SWACO)
Project: Produced water Treatment & Chemical Injection Skid Package Description: SKID Package SITE Assembly (SKID STRUCTURES & PIPE SPOOLS)
+ Client: Afras/Cairn Energy India Limited/AGT FZCO Project: Bhagyam Field Development Project
Description: Skid Package SITE Assembly (SKID STRUCTURES & PIPE SPOOLS)
+ Client: DUBAI PETROLEUM (DPE) & DUBAI SUPPLY AUTHORITY (DUSUP) Project: Fuel Gas Filters Project & MARGHAM Plant SITE WORK Description: Fabrication & SITE Assembly (SKID STRUCTURES & PIPE SPOOLS)
+ Client: GASTECH-Dubai Project: SOUTH-PARS GAS FIELD DEVELOPMENT Description: SKID STRUCTURES & PIPING for MEG Re-Generation Package
+ Client: ELSTER-INSTROMET SDN BHD/DODSAL/GASCO
Project: HABSHAN MAQTA TAWEELAH (HMT) Gas Pipeline Project Description: Fabrication & SITE Assembly (SKID STRUCTURES & PIPE SPOOLS)
+ Client: SIDEM-FRANCE. Project: SADARA FIELD DEVELOPMENT IN JUBAIL 2. Description: Fabrication & SITE Assembly (SKID STRUCTURES & PIPE SPOOLS) Jan 2011– Mar 2012 PRODUCTION SUPERVISOR–Cethar Vessels Ltd @ Cethar Limited, Trichy, India
[1 Year 3 Months] Duties:
+ Maintained Production by established & enforced organization standards.
+ Ensures operation of equipment by calling for repairs and maintenance.
+ Maintained workflow by monitoring steps of the process, set processing variables, observed control points and equipment.
Monitored personnel and resources, study methods, developed reporting procedures and systems, facilitated corrections to malfunctions within process control points and documented the same for organization assets and Projects.
N (056-******* / (052-******* *************.**@*****.*** Dubai, UAE
+971-**-***-**** / +91-938**-***** LAKSHMAN KUMAR SUBBIAH Page 3 of 3 E D U C A T I O N A L Q U A L I F I C A T I O N
+ BACHELOR OF ENGINEERING – MECHANICAL ENGG. (B.E. MECH) Karunya Institute of Technology and Sciences– 1st Class76.2% 2006 – 2010
+ HIGH SCHOOL & SECONDARY SCHOOL (HSC & SSC)
Vairams Matric Hr. Sec. School – HSC 67.5% on 2006 and SSC 79% on 2004 A D D I T I O N A L Q U A L I F I C A T I O N & P R O F E S S I O N A L T R A I N I N G S
+ IN-PLANT TRAINING: Undergone In-plant training in Suryabala HYUNDAI plant and learnt about "Various sensors used in HYUNDAI cars and their functions" and about types of braking system used in HYUNDAI Cars in Jun 2009.
+ SEMINAR:Key Participant in One day National Level seminar on topic
“Measurement techniques for performance parameters during metal cutting” conducted by CMTI (Centre for Manufacturing Technology & Institute), TAEGU TEC & KIZTLER, (Bangalore) in Karunya University on 6th Apr 2009.
+ SOFTWARE COURSES: Pro/E (CADD Designing/Modeling Software) in Jan 2011 S T R E N G T H S & A B I L I T I E S
Problem-Solving &Decision-Making Efficient & Diplomatic Customer Care Analytical & Creative Thinker Dependable, Flexible & Adaptable Strong Inter-Personal Skills Sound Technical Knowledge Efficient Communicator Good Team Player
P E R S O N A L I N F O
Date of Birth : 24thDec 1988
Nationality : Indian
Marital Status : Married
Languages : English, Hindi, Tamil & Malayalam (Intermediate) Visa Status : Employment Visa (JAFZA)
Passport : Valid till June 2020
Notice Period : Immediately Available
LinkedIn : https://www.linkedin.com/in/lax-sp/
References : Upon Request