BSc. in Mechanical Engineering from University Of Santo Tomas, Philippines, 1979

WORK EXPERIENCES:

Company: Fabricom SVEZ LTD.

Address: Stavanger, Norway

Date joined: (Jan. 2008-Jan.2009)

Position: Senior Piping/Valve Engineer

Reliance BP/ Shell Conoco Phillipps project.

Prepare Valve Datasheets (VDS)in conformance with Shell DEP& Conoco Philipps Requirements.

Evaluate Vendor’s Documents i.e. datasheets (DS) if these complies with the Client requirementsuch as Pressure Equipment Directive (PED), ATEX Certification, inpection and Test Plans (ITP’s), Certificate of Conformities., etc.

Participate with the valve testing in conformance with API 598.

Check with the client the required tie-in Equipment & tools & interface as stated above.

Check with the Piping Key Plan,Piping GA’s,& Isometrics done by the PDMS modeller if these complies with the process & Client Requirement’s.

Check Stress Analysis done by the Stress Engineer’s, Flowlines & the Pipe Support into the System Requirements.

Check the Pipe Support Location Plans & Details & MTO’s done based on the final Stress Model & Stress Output.

Company: Worley Parsons Resources & Energy (Abu – Dhabi)

Address: Level 13 Dhafir tower, Bin Mubarak Street Abu Dhabi, United Arab Emirates U.A.E.

Date joined: (Jan. 2009 – Jan. 2012)

Position:Senior PipelineEngineer

BriefDescription: Project ManagementConsultancy(PMC) seconded to Abu Dhabi Marine Operating Company (ADMA-OPCO- pipelineReplacement Project – Demothballing Operating Company(ADMA-emothballingProject.- Operator –OPCO) - Operator: 36” Main Oil Project Gas Processing Facilities Project, Zakum West Super Complex.

Duties and Responsibilities:

Preparation of Technical Requisition Packages (TRP’s) such as. for valves and other Piping Speciality items.

Preparation of ROW’s (Right Of Way).

Preparation of Site Visit Report.

Preparation of Topographical drawings sucxh as Plan & Profile, Road crossing Details, Kilometre Marker & Cathodic Protection Details(CP’s).

Company: RNZ Integrated (M) Sdn Bhd.(Petrofac) Note; 1

Note; 1: Assigned (seconded) to Akersolutions Norway for the North sea Crestal Gas Lift (CGL)North Sea BP Project.

Address: Menara Great Eastern Mall, Kuala Lumpur, Malaysia.

Date Joined:(Jan. 2012 – Sept. 2012)

With AkerSolutions Norway:

Position: Senior Mechanical/Piping Engineer

Duties and Responsibilities:

Assist advised on Piping Support team for the Stress Calculations especially on pipelines & Sub-sea Piping.

With Aker Solutions:

Position; Senior Pipeline Engineer

Duties and Responsibilities:

Preparation of Material Deliverable Register (MDR) for the new incoming projects.

Preparation of Right of Way (ROW) for the new Pipeline involvement.

Preparation of Site Visit check list for the tie-in interface at toing “A” Platform.

Company: AKER Solutions AS Norway

Address: Buoy bldg.. 4-10 Stavanger, Norway: North Sea Crestal Gas lift (CGL)North Sea BP Project.

Date joined : (Sept. 2012-Jan. 2013)

Position; Project Responsible Engineer (PRE) for Manual Valves.

Duties and Responsibilities:

Prepare valve datasheets (VDS) in conformance with Shell DEP & Conoco Philipps Requirements.

Evaluate Vendor documents such as Pressure Equipment Directives (PED) ATEX Certification, inspection and Test plans(ITP’s) & Certificate of conformities.

Participate with the valve testing in conformance with API598.

Check with the client the required tie-in equipment & tools & Interface as stated above.

Check with the Piping Key Plan, Piping GA’s & Isometrics done by the PDMS modeller if these comply with the peocess & Client Requirements.

Check the Pipe Support Location Plan (PSL) & Details & MTO’s done based on the Final Stress model & Stress Output.

Company: Technip Geoproduction (M) Sdn. Bhd.

(FPSO) PROJECT

Address; Jalan Tun Razak 50400, federal territory of Kuala Lumpur, Malaysia

Date joined; (Jan.2013 – Present)

Position: Senior Piping Engineer

Duties and Responsibilities:

Performed 30%, 60% model reviewduring HAZOP, HAZID & SIL

Review for safety issues & for preparataion of PDMS/PDScompletion.

Ensure that the completed project shall be “fit for purpose” prior to “load-out” & start-up & shall be in conformance with API RP14E requirements.

Check pipe Supports,pans & Detailsthru the aid of Navisworks & shall be in conformance with the final Stress Model & Stress Output.

Preparation of Technical Requisition packages (TRP’s)

For all those Piping Speciality items like corrosion Coupons (CC’s) & Corrosion Resistant Alloys (CRA’s) & Interlocking Device for PSV’s.

Company:KVAERNER Engineering S.E.A. (Petrominco)

Address: 17th floor west Wing Rohas perkasa no.8 Jalan tun Perak, Kuala lumpur, Malaysia.

Date joined: (Jan.2002 – Jan. 2008)

Position:Senior Mechanical/Piping Engineer

Project; Reliance KGD6 Sub-Sea Project

Duties and Responsibilities:

Check Wall Thickness Calculations for the Sub-Sea Distribution Assembly (SDA), Umbilical Distribution Hubs( UDH) done if there in conformance with the process and client requirements.

Check material specifications prepared if this comply with the client rquirements.

Coordinate with the client the tie-in interface such as from the tie-in tools, jumpers, pipelines & tie-in to the Wellhead riser Platform (WHRP), Gas injection PLEM (Pipeline end manifold& the floating storage Offloading (FPSO).

Check wiwth the client the required tie-in equipment & tools & interface as stated above.

Check the Piping Key Plan, Pipng GA’s & Isometrics done by the PDMSmodeller if these conforms to process & client requirement.

Check pipe Stress Analysis done by the Stress Engineer’s Flowlines & the required pipe support into the system requirements.

Check the pipe Ssupport Location Plan and Details & MTO’s done based on the final stress model and Output.

Project: F6 Rejuvenation Project, topside Facilities(Petronas)

Position; Senior Piping engineer/Lead Engineer

Duties and esponsibilities:

Check Wall Thickness Calculations for the Sub-sea Distribution Assembly (SDA) & Umnbilical Distribution Hubs (UDH) done if these are in conformance wiith the process & client requirements.

Check material Specification prepared if these conforms with Petronas requirement.

Coordinate with the clcient (Petronas) for the Piping works that needs to be rejuvenated.

Chek actual Piping configuration “As-Built” & condition at site (offshore).

Coordinate with other discipline which are related to Piping works.

Check & coordinate wwith PDMScontractor, which are related to Point clouds system all the deliverables that needs to be issued to Petronas.

Prepared weekly progress report to Petronas.

Project: Kikeh Sub-Sea Project for Murphy Oil

Position; Senior Piping Engineer/Lead Engineer

Duties and Responsibilities:

Prepare Wall Thikness calculations for the Production manifold, Water injection Manifolds & Gas Injection PLEM(Pipe line End Manifold as per the process requirements and Design Condition

Prepared Material Specifications.

Coordinate with the client for the tie-in interface.

Check with the client the tie-in equipment & tools.

Such as interfacing with WHRP’s (Wellhead Riser Platforms & FPSO’s (Floating Platform Storage Offloading.

Preparation of Piping Key Plan, GA’s & Isometrics including interface as stated above.

Perform Stress analysis including flowlines & Sub-Sea Pipng as per ASMEB31.8 chapter VII & FOS DNV-OS-FO1requirements.

Preparation of new Pipe Support Location Plan & Details & MTO’s.

Preparation of Pipe Support Location Plan, Details & MTO’s based on the stress analysis output.

Prepare valve Datasheets (DS).

Prepare Piping Specility Items such as Corrosion Coupons (CC’s), Interlocking device for PSV’s & for Doble block & Bleed Valaves (DBB’s).

Project: Prai Bulk Deport Project for Petronas Dagangan Berhad/ Warga Hikmat Kejuruteraan Sdn. Bhd.

Position: Senior Piping/Mechanical Engineer

Duties and Ressponsibilities:

Provide Engineering Services for the addiditional tank Facilities as per API 650 requirements.

Revised existing GA, preparation of new Piping arrangement for both process & Utility Lines Lyout for the two (2) additional tanks as DEP requirements.

Checking of Vendor’s calculations (two nos. ) as per NFPA requirements.

Perform stress analysis done into the system

Project; BRA project for Lundin

Duties and Responsibilities:

Checked and modified Piping GA.

Prepared Pipe Support Location Plan & Details for Production Deck & Heating Media.

Revised Pipe Support Location Plans & Details as per the latest GA’s & Stress Analysis done into the system.

Perform Stress Analysis using Autopipe 6.0 and CAESAR II version 6.10 program.

Was based and seconded to Vinashin Yard(Vietnam) to provide engineering support to HHI ( Hyundai Heavy Industries.

Project: Nippon Oil Exploration

Position; Senior Piping/Mechanical Engineer

Duties and responsibilities:

Audit for Piping, Piping components, Static & rotating equipment, on behalf of Nippon Oil.

Check all Vendor drawings,calaculations,data’s & specifications if these comply with client (Nippon Oil requirement.

Check materials received are all in good condition & as per their(Vendor’s) specifications & requirement..

Check all materials installed including ship-loose items & excluding electrical & instrument at site if these are all comply & as per aaaaapproved drawings.

Project: Stress analysis for Modification of Bintulu Lateral Pipeline.

Position: Senior Piping/Mechanical Engineer

Duties and Responsibilities:

Perform Stress analysis for the 12”, 10”,8”,4” & 2” lines.

Perform stress analysis into the system such as from scraper Launcher & Receiver using Auatopipe Version 6.10.

Provide Stress eport.

Prepare Pipe Support Details as per Stress output.

Project: Stress analysis at Gebeng metering Station in Kuantan, Kuala Lumpur, Malaysia.

Position: Senior Piping/ mechanical Engineer

Duties and Responsibilities:

Perform stress analysis using Autopipe-plus version 6.10. & in conformance with ASMEB31.8 requirements.

Provide stress Report.

Prepare Pipe support Detail as per the stress output.

Company: Technip Geoprouction (M) Sdn. Bhd. : (FPSO Project)

Date joined: (Jan. 2013 to Present)

Address: Jalan Tun Razak, 50400, Federal Teritory of Kuala Lumpur, Malaysia

Postion: Senior Piping Engineer

Duties and Responsibilities:

Experience with PDMS/PDS. We had to perform 30% 60% model during HAZOP, HAZID & SIL review for safety issues. PDMS normally used in offshore project and once we had completed the feed phase, we could properly check wether there is a piping clashed with regards to structures & other piping auxillary items& also we could study the Material Handling ( Ergonomics)specially with regards to maintenance & piping safety studies & further, it is more useful to review the smart plant review (SPR), it is also link to Autocad& you can easily generate the fabrication Isometrics once PDMS is completed. & also linked to CAESAR II and further you can easily run the Stress Analysis once completed. Based on actual exposure, PDMS/3D modelling, we could perform the conceptual design using the 3D technology & will be more useful for review & checking since you had to input the piping material Specification prior to perform the basic modelling of the piping system.

Preparation of Pipe Support & details using the final Stress output & using the piperack area involved. For PDS, we normally used for onshore workslike Refineries and Petro-chemicals.

Preparation of Technical requisition packages (TRP’s) e.g. for valves, i.e. combination valves i.e. Compact Flange Double Block and Bleed Valves and other piping Speciality items based on the approved P& ID’s.

Preparation of ROW’s (Right of way) for the pipeline.

Preparation of Site visit Check list for the tie-in interface at Crestal Gas Lift (CGL) on the North Sea Platform.

Preparation of site visit report.

Preparation of topographical drawings, Plan and Profile, road crossing details, kilometer marker and cathodic protection (CP) details.

Preparation of Tie-In Interface if these complies with the client’s and process requirements new incoming projects.

Company: Worley Parsons Resources and Energy(Abu Dhabi)

Address: Level 13,Dhafir tower, Bint Mubarak Street, Abu Dhabi, United Arab Emirates

Project Management Consultancy (PMC) seconded to Abu Dhabi Marine Operating Company (ADMA-OPCO: Operator) (Gas Processing Facilities Project Zakum West Super Complex)

date joined:(Jan.2002- Jan.2009)

Position: Senior Pipeline Engineer

Duties and Responsibilities:

Preparation of Material Deliverables Register (MDR) for the new incoming Projects.

List all the Cost time Resources (CTR) for the new incoming projects.

Preparation of ROW’s (Right of way) for the new pipeline involvement.

Preparation of Site visit Check List for the tie-in interface at Tiong “ A” Platform.

Preparation of Critical Line List for the Stress requirements.

Preparation of ROW’s (Right of way)

Position : Restoration of Bekok “C” Platform; Front End Enigineering Detailed Design FEED: PCSB

Preparation of Technical requisition packages (TRP’s) e.g. for valves and other piping Speciality items.

Preparation of ROW’s (Right of way)

Preparation of Site visit Check List for the tie-in interface at Bekok “C” and Bekok “A”Platforms.

Preparation of site visit and provision of report.

Provision of Design Basis Memorandum (DBM).

Preparation of topographical drawings, Plan and Profile, road crossing details, kilometer marker and cathodic protection (CP) details.

Preparation of Tie-In Interface if these complies with the client’s and process requirements.

COMPANY: WORLEY PARSONS RESOURCES AND ENERGY (Abu Dhabi)

Address: Level 13,Dhafir tower, Bint Mubarak Street, Abu Dhabi, United Arab Emirates

date joined:(Jan.2009- Jan.2012)

brief description:

Project Management Consultancy (PMC) seconded to Abu Dhabi Marine Operating Company (ADMA-OPCO: Operator)36" Main Oil Pipeline Replacement Project/Demothballing

Position: Senior Pipeline Engineer:

Duties and Responsibilities:

Preparation of Technical requisition packages (TRP’s) e.g. for valves and other piping Speciality items.

Preparation of ROW’s (Right of way)

Preparation of site visit report.

Preparation of topographical drawings such as Plan and Profile, road crossing details, kilometre marker and cathodic protection (CP) details.

Preparation of Tie-In Interface if these complies with the client’s and process requirements.

Check EPCC Contractor (Technip Abu Dhabi and National Petroleum Construction Company: NPCC)(Contractor) documents if these complies with COMPANY requirements.

Review and check Vendor documents including Skid Packages.

Participate in 60% and 90% PDMS model review.

Participate in Material Handling Study (Ergonomics) review.

Check pre-fabricated spools at the yard.

Coordinate with the Third Party Authority (Bureau VERITAS) for the Inspection of delivered materials and fabricated spools.

Resolved all Contractor’s Engineering Queries and Concession Request and Management of Change (MOC) which are related to Piping.

Participate in weekly progress meeting with the EPCC Contractor.

Check all Stress Analysis done by the Contractor and Vendor

Check all the detail of Pipe Supports it these are all in accordance with the Final Stress done into the system

Provide technical support to pre-commissioning and commissioning team.

) Duties and: Responsibilities:

Preparation of Technical requisition packages (TRP’s) e.g. for valves and other piping Speciality items.

Preparation of ROW’s (Right of way)

Preparation of site visit report.

Preparation of topographical drawings such as Plan and Profile, road crossing details, kilometre marker and cathodic protection (CP) details.

Preparation of Tie-In Interface if these complies with the client’s and process requirements.

COMPANY: AKER KVAERNER ENGINEERINGS.EA ( Petrominco)

ADDRESS: 17TH floor West wing Rohas Perkasa no.8,Jalan Tun Perak, Kuala Lumpur, Malaysia date joined: (jan.2002 –jan.2008)

Position :Senior Mechanical/Piping Engineer

Duties and Responsibilities:

Fabricom SVEZ LTD. (2008 – 2009)

Position : Senior Piping Engineer/ Valve Engineer

Reliance BP/ Shell : Conoco PhillipsProject

Prepare Valve Data Sheets in accordance with Shell DEP/ BP and Conoco Phillips requirements.

Evaluate Vendors documents i.e. Datasheets if this complies with Client’s requirements i.e. Pressure Equipment Directives (PED), ATEX Certification, Inspection and Test Plans (ITP’s), Certificate of Conformities, etc.

Partiipate for the Valve Testing in accordance with API 598.

Check with the client the required tie-in equipment and tools and interface as stated above

Check the Key Plan, Piping GA’s and Isometrics done by the PDMS modeller if these complies with the Process and Client requirements.

Check Stress Analysis done by the Stress Engineer’s Flow lines and required pipe support into the system requirements

Check the pipe support location plans, details and MTO’s done based on the final Stress model and Stress output

AKER KVAERNER ENGINEERING S.E.A (2002 – 2008)

Position : Senior Mechanical/Piping Engineer

Position : Senior Mechanical/Piping Engineer

Reliance – KGD6: Sub-Sea Project

Check Wall Thickness calculation for the Sub-sea Distribution Assembly (SDA) and Umbilical Distribution Hubs (UDH) done if these are in accordance with the process and client requirements.

Check material specifications prepared if these complies with the Client requirements.

Coordinate with the client for the tie-in interface i.e. from the tie-in tools, jumpers, pipelines and tie-in to Well head riser platforms WHRP’s and the Floating Platforms Storage Offloading (FPSO’s)

Check with the client the required tie-in equipment and tools and interface as stated above

Check the Key Plan, Piping GA’s and Isometrics done by the PDMS modeller if these complies with the Process and Client requirements.

Check Stress Analysis done by the Stress Engineer’s Flow lines and required pipe support into the system requirements

Check the pipe support location plans, details and MTO’s done based on the final Stress model and Stress output.

SSB : F6 Rejuvenation Project Topside Facilities

Position : Senior Piping Engineer / Lead Engineer

Check Wall Thickness calculation for the Sub-sea Distribution Assembly (SDA) and Umbilical Distribution Hubs (UDH) done if these are in accordance with the process and client requirements.

Check material specification prepared if these complies with the Client (SSB) requirements

Coordinate with the client for the piping works which needs to be rejuvenated

Check actual piping configuration (“As-Built”) and condition at site (Offshore).

Coordinate with other disciplines which are related to piping works

Check and coordinate with PDMS contractor for all the deliverables that needs to be issued to the Client (SSB)

Prepared weekly progress report to Client

Kikeh Sub-Sea Project for Murphy Oil

Position : Senior Piping Engineer / Lead Engineer

Prepare wall thickness calculation for the production manifold, water injection manifolds and gas injection plem as per the process requirements and design condition

Prepare material specification

Coordinate with the client for the tie-in interface

Check with the client the required tie-in equipment and tools i.e. interfacing with the WHRP’s (Wellhead Riser Platforms) And FPSO’s (Floating Platforms Storage Offloading)

Preparation of key plan, GA’s and Isometric including tie-in interface as stated above.

Perform Stress Analysis including flow lines and sub-sea piping as per ASME B31.8 Chapter VII And FOS DNV – OS-F101 requirements.

Preparation of support location plans, details and MTO’s based on Stress Analysis output.

Bunga Orkid Project for Talisman Malaysia Ltd

Position : Senior Piping Engineer

Prepare critical line list as per the process line list

Perform Stress Analysis as per ASME B31.3 requirements

Preparation of new pipe support location plans, details and MTO’s

Preparation of pipe support location plans, details and MTO’s based on the stress analysis output

Prepare piping material specification

Prepare valve datasheets

Prepare piping speciality items

Prai Bulk Deport Project for Petronas Dagangan Berhad / Warga Hikmat Kejuruteraan Sdn Bhd

Position : Senior Piping / Mechanical Engineer

Provide Engineering services for the additional tank facilities as per API 650 requirements

Revision of existing GA, preparation of new piping arrangement for both process and utility lines and layout for the two (2) additional tanks as per DEP requirements

Preparation of new isometrics and MTO’s

Preparation of new pipe support location plans, details and MTO’s

Preparation of pump datasheets for the two (2) tanks

Checking of Vendor’s calculations and details for the diesel and gasoline storage tank

Prepare sampling tank details and calculations (two nos.) as per NFPA requirements

Perform stress analysis done to the system

BRA Project for Lundin

Position : Senior Piping / Mechanical Engineer

Checked and modified piping GA’s as per P&ID’s

Prepared pipe support location plans and details for Production Deck and Heating Media

Revised Pipe support location plans and details as per the latest GA’s and final stress analysis done into the system

Perform Pipe Stress Analysis using AUTOPIPE version version 6.0 and Caesar II Version 6.10 Program

Evaluate vendor data’s for valves and flame arresters if these complies with design requirements

Was based in Vinashin yard in Vietnam to provide engineering support to HHI

Helang Project for Nippon Oil Exploration

Position : Senior Piping / Mechanical Engineer

Audit for Piping, piping components, static and rotating equipment and safety equipment on behalf of Nippon Oil

Checked all vendor drawings, calculations, data’s and specifications if these comply with client’s (Nippon Oil) requirement

Check all materials received if these are all in good condition and as per their (Vendor) specifications and requirements

Check all materials installed (excluding electrical and instrument) at site if these are as per the approved drawings

Stress Analysis for Modification of Bintulu Lateral Pipeline

Perform Stress Analysis for the 12”, 10”, 8”, 4” and 2” lines

Perform stress analysis into the system i.e. from Scraper Launcher and Receiver using Autopipe Plus version 6.10

Provide Stress report

Prepare pipe support details as per the stress output

Stress Analysis for Gebeng Metering Station

Perform Stress Analysis using Autopipe – Plus version 6.10 and in accordance with ASME B 31.8 requirements

Provide Stress report

Prepare pipe support details as per the stress output

RNZ INTEGRATED (M) SDN BHD (1998 – 2002)

Menara Great Eastern, Kuala Lumpur

Position : Senior Mechanical/Piping Engineer

Seconded to KVEARNER PETROMINCO ENGINEERING SDN. BHD., Kuala Lumpur (2002)

o(BKC, BRC and BRA Platforms including Compression train for Talisman Malaysia)

Check piping GA’s as per P & ID’s.

Pipe Loading Calculation.

Check Isometrics from PDMS as per latest GA’s.

Check pipe supports from GA”s and isometrics if these complies with stress (for critical lines).

Perform Pipe Stress Analysis using AUTOPIPE version 6.0 for Critical line.

Check equipment data’s and specifications if these comply with the Client’s requirements.

Seconded To SIME ENGINEERING (M) SDN BHD, Kuala Lumpur (May 2000 – Jun 2001)

o(MLNG Tiga Project : Bintulu)

Check piping GA’s as per P & ID’s.

Calculate the required height of Bundwall for the new

Ethane Tank to be installed as per DEP requirements.

Pipe Loading Calculation.

Check Isometrics from PDS as per latest GA’s.

Check pipe supports from GA’s and isometrics if these complies with stress (for critical lines) and CLIENT’s (DEP) requirements.

Perform Pipe Stress Analysis using AUTOPIPE version 6.0 for critical lines such as LNG Loading & Rundown Lines, BOG Lines, etc.

Check equipment data’s and specifications if these comply with the Client’s requirements.

Prepare Stress Report.

Position : Senior Mechanical/Piping Engineer

Detail design engineering for UPW piping system on the chemical building for the WTW Project in Kulim, Kedah Hitech Industrial Park for Hexagon Tower Sdn Bhd. (Apr 2000 – May 2000)

Involve in preparation of GA drawings, Isometric, pipe support, structural drawings and loading data calculation.

Metering Skid for Angsi for Mentor Engineering and Mecomb. (Mar 2000 – Apr 2000)

Responsible in preparing engineering drawings such as GA’s, isometrics, Section & details and also pipe supports.

Replacement of Filter Drums 1 & 2 for Huntsman Tioxide, Kemaman (Jan 2000 – Feb 2000)

Responsible in preparing engineering drawings such as GA’s. isometrics, section & details, etc. and also tender package.

Seconded to KRISI Technology Sdn. Bhd. (May 1999 – Dec 1999)

oKR-2 Project (AMSB) – Kerteh (Laboratory / CFR)

Prepare engineering drawings such GA’s, Isometrics, Section & details, etc. and submit to client for approval.

Supervise site installation of UPVC & GI ducting for fresh air intake and exhaust system.

Check the quality of works that have been done.

Calculate the heat transfer from the G.I & UPVC ducting if requires any insulation.

Calculate the thermal expansion of pipe for hot water system

Calculate vessel required thickness for charcoal filter.

Fan & motor sizing for fresh air intake and exhaust system.

Prepare schedule of daily activities.

Prepare 3 weeks construction schedule.

Prepare global MTO

Evaluate vendor documents if these complies with the clients requirements.

Procure material.

Seconded To SIME SEMBAWANG ENGINEERING (Mar 1998 – Apr 1999)

oPCSB PROJECT : RESAK OFFSHORE

Check isometric drawings from PDMS.

Check clashing report.

Evaluate vendor documents if these comply with client’s requirements.

INTERTEC (M) SDN. BHD. (1997 – 1998)

(TUAS POWER PLANT/DRPL)

Singapore

Position : Senior Mechanical/Piping Engineer

Preparation of detailed Engineering drawings such as piping plans, isometrics & Pipe support details Tuas Firewater Line.

Calculate pipe linear expansion & hydraulic calculation.

Prepare specification for fire-monitor at Jetty Head.

Prepare QA/QC plans such as construction procedure, field inspection procedure, material handling & delivery procedure, etc.

Prepare procedure for welding such as WPS, PQR & WQT.

Witness testing of welders.

Prepare fabrication shopdrawings.

Evaluate vendor documents.

Prepare project schedule as per clients requirements and vendors delivery of materials.

Prepare weekly piping fabrication progress report.

Line checking prior to start hydrotesting.

Prepare hydrotest diagram & MTO’s.

Supervise blasting & painting works.

Supervise loading of pipe spools on trucks and unloading at jetty.

Supervise site installation.

Prepare punch list items for mechanical and piping.

CEGELEC (M) SDN. BHD. / OIL LINE ENG’G & ASSOCIATES (Feb 1993 – Nov 1997)

Kuala Lumpur

Position : Mechanical / Piping Engineer

Involved in Refinery and Petrochemicals project for Petronas Gas Sdn Bhd., Sarawak Shell Berhad and Shell Refinery (FOM) Bhd/MLNG).

RESPONSIBILITIES :

Checks all vendors mechanical and piping drawings if these comply with the client’s standards and format.

Check all vendors calculations such as stress calculation, pipe sizing, etc. as per clients requirements.

Prepares procedures and specifications such as welding procedure qualification records (WPQR), weld repair procedure, etc.

Witness testing of welder’s.

Check all vendor documents if these complies with the clients requirements.

Prepares fabrication shop drawings.

Supervise blasting and painting works.

Supervise shop fabrication and site installation.

Supervise NDT works such as Radiographic Testing (RT), Dye-penetrant and Magnetic Particle Test.

Interpret and check RT films.

Prepare weekly piping fabrication progress report.

Prepare Hydrotest Diagram and MTO’s.

Line Checking prior to start Hydrotesting.

Prepare punch list items for Mechanical and Piping.

CONSULTING AND DESIGN ENGINEERING (Feb 1988 – Jan 1993)

Saudi Arabia

Position : Mechanical/Piping Engineer

REFINERY PLANT

RESPONSIBILITIES:

Responsible for developing conceptual drawings.

Responsible for preparing design packages such as mechanical and piping works for petrochemical and industrial plants.

Prepares detail isometric drawings, Hydrostatic test diagrams tie-in index P&ID’s.

Developed piping routing plan.

Prepares scope of work and list of materials required for mechanical / piping works.

Responsible for checking all mechanical piping materials which includes direct charge requisition and testing requirements.

Responsible for distributing work to designers and draftsman concerning new projects.

Responsible for checking all mechanical and piping drawings.

Checked all the drawings in order to comply with Saudi Aramco standards and format.

Developed cathodic protection for underground piping.

Responsible for monitoring ongoing projects to comply with the set schedule date of completion.

Prepares mechanical/piping calculation for pumps, pipe sizing, tanks, pressure drop calculations, etc.

Responsible for stress analysis calculation for all critical piping pipe works which includes tank farms, cross country and plant refinery piping using computer programs Caesar II and Simplex – S.

INTERNATIONAL MARINE SERVICES (Feb 1987 – Jan 1988

(DUBAI PETROLEUM CO. – D.P.C)

United Arab Emirates

Position : Mechanical Engineer

REFINERY PLANT

RESPONSIBILITIES :

To check detail design which includes piping isometrics and piping plans against P&ID, Hydrostatic test diagrams prior to construction