Resume

Sign in

Mechanical Engineer Manager

Location:
Riyadh, Riyadh, Saudi Arabia
Salary:
Sr 12,000.00
Posted:
May 05, 2019

Contact this candidate

Resume:

Anthony Segundo Macaalay

E-mail address: ac9av9@r.postjobfree.com

Mobile no: +966-*********

Education:

BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING

Skills:

Heating and Ventilation Air-conditioning (HVAC System)

Plumbing System (Sewerage, Domestic, Drainage)

Fire Protection System, FM-200 System, Fire Alarm and Detection System,

AutoCad-2D, Microsoft Office (Excel, Words, Outlook)

Knowledge in Design of FM-200 System, Foam System Design,

Kitchen Hood Fire Suppression System

Building Management System (BMS)

Employment history:

Company : Saudi Technical Ltd

Location : Kingdom of Saudi Arabia

Position : Construction Manager (MEP)

Year ; December. 01, 2018 to Present

Proejct : Metro Line-2 ( Station 2B1 & 2A3)

System : HVAC System, Plumbing System, Fire Protection System

Company: Saudi Development and Construction Company

Location : Kingdom of Saudi Arabia

Position Senior Mechanical Engineer (MEP)

Year : May, 28, 2015 to May 28, 2018

Project: Jizan 100 Bed Military Hospital Bldg.

Al Darb Kingdom of Saudi Arabia

System: HVAC System, Plumbing System, Fire Fighting System, FM-200 System,

Conveyor System, Irrigation System, Water Treatment Plant, Medical Gas System,

Liquefied Petroleum Gas System

Duties and responsibility:

•Project Site Implementation and Execution.

•Prepare all Mechanical Discipline Schedule as per Construction Schedule.

•Arrange and prepare for Manpower mobilization, tools and equipment.

•Review and estimate the Materials Quantity Take-off compare base B.O.Q and Tender Drawing Plan.

•Prepare and arrange all Document Submittal like: (Pre-Qualification Company Profile, Materials Catalogs, Sample Materials and Devices) as stated in the Materials Specification and submit to the Consultant for approval.

•Assisting AutoCAD Operator for preparing Shop Drawing for all Mechanical Discipline and submit to the Consultant for Approval.

•Coordinate with our Sub-Contractor to prepare and submit the Company Profile for Pre-qualification including their Supplier for the Materials and Equipment.

•Logged and monitoring of all Shop Drawing, Materials Inspection Report (MIR), Report for Inspection (RFI), Request for Clarification (RFC). Materials Delivery Report.

•Coordinate and assisting Q.A/Q.C for the Inspection of Materials Delivery on Site for the inspection of the Mechanical Consultant.

•Ensure that the installation, inspection and testing commissioning of all the mechanical equipment, fittings and work implemented on Site and meets the specification and the consultant requirements

•Responsible to review and check the Subcontractor work execution as per the Contract amount and Billings.

•Submit to the Project Manager for review and check and send it to the Operation Manager for signing and issuing a payment.

•Ensure the work is executed according to contract specifications, approved design drawings, agreed procedures and method of statement.

•Monitor materials on Site and prepare materials request order submits to the procurement.

•Attend monthly and weekly Technical and Coordination meeting together with the sub-contractor to discuss some other pending works and progress accomplishment work on the Site.

•Complete responsibility to decide on day to day work that needs to be carried out by subordinates including: scheduling of activities, assigning task to groups or individuals, accuracy of work conducted, supplying resources and dealing with operational issues and problems.

•Coordinate with other project personnel to ensure that deadlines, procedures, and other project requirements are met.

•Conduct weekly meeting to all my engineers/manpower and discuss about the work and safety measure in the Site also, give them some advice and ideas on how their work to make it prompt and effortless for the project.

•Estimate quantity take-off, if any changes in the Tender Drawing, prepare Change Order and submit to the Consultant for their Approval.

•Prepare daily activity report on Site and submit to the Project Manager for their references and file.

•Prepare Monthly percentage accomplishment Billing of Sub-Contractor as per their actual system installation and submit to my Project Manager for review and approval.

•Assisting AutoCAD Operator for preparation of Coordination Drawing for all Mechanical Disciplines.

•Coordinate to Auto cad operator regarding the as built- plan drawing as per actual all Mechanical Discipline system installation.

•Check and verify the accuracy of shop drawings and their compliance to the specification, consultant’s design and existing local authority standard.

•Coordinates with MODA Mechanical Consultant and Architect Consultant for any changes in the Tender Drawing and prepare Shop Drawing for their approval.

•Prepare and arrange all the necessary submittal documents for Final turn-over of the Project and submit to the Consultant for their final approval and acceptance.

Company: Unisafe Fire Protection Specialists W.L.L

Doha, Qatar

Position: Project Engineer

Year : April 12, 2014 – April, 12.2015

Project: Musheireb Downtown Doha

Musheireb, Street, Doha Qatar

System: Fire Fighting System

DUTIES AND RESPONSIBILITIES:

•Project Implementation and Execution.

•Prepare Project Schedule as per Construction Schedule and submit to the General

Contractor.

•Prepare submittal of Equipment’s, Materials and Devices (Brochure and Supplier) for Approval of

Consultant.

•Prepare testing and commissioning (initial/ final test) of the system for inspection of the General. Contractor representative and Consultant

•Attend monthly and weekly Technical and Coordination meeting together with the other trade contractors to discuss some other pending works and progress accomplishment work in the Project.

•Conduct weekly meeting to all my subordinate/manpower and discuss about the work and to give them some advice and ideas on how their work make it prompt and effortless for the project.

•Prepare material request (MR) regarding the status of the material in the Site and submit to Main office.

•Prepare weekly accomplishment report on Site and submit to the Project Manager/ General Manager for their references.

•Estimate materials take-off and material cost if there is a Revision on the Plan as per Bid cost and submit to the General Constructor for evaluation.

•Supervise Sub-Contractor for installation and prepare RFI, RFC and Coordinates to Consultant to conduct Testing and Commissioning of the System.

•Prepare monthly percentage accomplishment report as per actual system installation.

•Prepare the Monthly Billing percentage accomplishment and submit to the Main Office for their review and evaluation and submit to the General Contractor.

•Coordinate to Auto cad operator regarding the as built- plan drawing as per actual system installation.

•Prepare and arrange all the necessary submittal documents for Final turn-over of the Project and submit to the Consultant for their final acceptance.

Company: Al-Rasheediad Safety & Security Est.

P.O Box 35319, Abu Dhabi, UAE

Position : Site Engineer

Year : February, 2013 – October, 2014

Project : Pepsi Cola

Airport Road, Abu Dhabi, UAE

System : Fire Fighting System & Fire Alarm System

Company: Al-Rasheediad Safety & Security Est.

P.O Box 35319, Abu Dhabi, UAE

Position : Site Engineer

Year : February, 2013 – October, 2014

Project : National Marine Dredging Company

M-1, Musaffah Abu Dhabi, UAE

System : Fire Fighting System & Fire Alarm System

Company: Al-Rasheediad Safety & Security Est.

P.O Box 35319, Abu Dhabi, UAE

Position: Project Engineer

Year: October 2012- January 2013 Project: Anabeeb Pipe Factory

Musafah M-22 Abu Dhabi,UAE

System: Fire Fighting System & Fire Alarm System

Company: Al-Rasheediad Safety & Security Est.

P.O Box 35319, Abu Dhabi, UAE

Position: Project Engineer

Year: March, 2010 – June 2012

Project: RESIDENTIAL TOWER BUILDING (C-69 & C-77)

Al Rawdath, Abu Dhabi, UAE

System: Fire Fighting System & Fire Alarm System

Company: Al-Rasheediad Safety & Security Est.

P.O Box 35319, Abu Dhabi, UAE

Position: Mechanical Engineer (Maintenance)

Year: 2009-2011

Project: MINISTRY OF FOREIGN AFFAIRS BUILDING

Al- Bateen, Abu Dhabi,UAE

DUTIES AND RESPONSIBILITIES:

I worked as General Mechanical Engineer for Maintenance. My duties and responsibilities is to maintain all the building equipment and monitor all control panels in good condition and in proper operations like (AHU’s, Fan coil units, Fan motor, Water heater, Booster pump, Electrical distribution board (EDB), Transformer (Dry), Main Distribution Board (MDB), Diesel Pump, Electrical Pump, Jockey Pump and Control panels & Fire Alarm control panel, Elevator, BMS and all other services in the building). I am preparing the Monthly Preventive Maintenance Schedule for all equipment’s for our daily activity works and as followed by my subordinates. Prepare and make the data check list of all the equipment in the building for Equipment History record. I am also prepare the data log sheet for Generator testing result for (with load and with load test) and also included the Fire pumps (Electric drive & Diesel driven) weekly warm-up test. Responsible to do technical report (if ever there is a equipment defective devices or material need to be replace), I’ll inform the Ministry of Foreign Affairs Engineer In-charge of the building for their advance information. I am preparing the monthly Material Request for Mechanical & Electrical. Responsible to preparing snag list of all the system installed by the contractor (to rectify the balance of their undone work) and to make it sure that the device are installed and in operation. I am preparing the monthly data check list report of as per stated in our contract for our Quarterly Billing and submit to Main office for review and submit to the Ministry of Foreign Affairs Representative.

Company: ROMAGO INCORPORATED

36 Cordillera St. Mandaluyong City

Manila,Philippines

Position: Project Manager (MEPF)

Year: November 2008 – June 2009

Project: GSIS BUILDING PHILS.

Macapagal Highway, Pasay City

DUTIES AND RESPONSIBILITIES:

•Project Implementation.

•Prepare Project Schedule as per Construction Schedule (Mechanical, Electrical, Plumbing Systems)

•Responsible for Project mobilization of man powers and equipment for the Project.

•Review the estimate Bill of Quantity (BOQ) base on the actual plan designed.

•Prepare and arrange document submittal’s for Mechanical, Electrical, Plumbing and Fire Protection (brochures, equipment’s, devices) as stated in the contract materials specification and submit to the designer/ consultant for approval.

•Prepare, arrange and submit Inspection for the Materials Request (IMR) and with attached Certificate of Origin and submit to General Contractor (QC) inspector and Consultant (QC) inspector for their inspection.

•Prepare, arrange and submit CRFI form (Contractor Request for Inspection) to General Contractor and Consultant representative for installation inspection of the systems (HVAC, Electrical, Plumbing and Fire Protection Systems) for their approval.

•Attend monthly and weekly Technical and Coordination meeting together with the other system contractors to discuss some other pending works and progress accomplishment work in the Project.

•Conduct weekly meeting to all my subordinate/manpower and discuss about their work and to give them some advice and ideas on how their work make it prompt and effortless for the project.

•Check and prepare Material Request (MR) for HVAC, Plumbing, and Electrical and Fire Protection Systems available materials status and submit to Main office to be purchase.

•Prepare document as stated in the specification/contract required for the Materials Country of Origin and submit to the General Contractor / Consultant representative for their reference and file.

•Assisting Site Engineer for their weekly, monthly report and submit General Contractor / MEP Coordinator.

•Estimate materials take-off and material cost (HVAC, Electrical, Plumbing and Fire Protection System) if there is a Revision on the Plan as per bid cost and submit to the Construction Management for evaluation.

•Prepare monthly percentage accomplishment report as per actual system installation (HVAC, Electrical, Plumbing and Fire Protection) systems.

•Prepare the Monthly Billing Accomplishment (all systems installation) and submit to the Main Office for their review and evaluation and submit to General Contractor for their evaluation.

•Coordinate to Auto Cad operator regarding the as built- plan drawing as per actual system installation in Site.

•Prepare and arrange all the necessary submittal documents for Final turn-over of the Project and submit to the owner representative for their final acceptance.

Company: DVAC Co., (W.L.L.)

Duct Ventilation and Air-conditioning

Street 47, Industrial Area Gate-6

P.O Box 55619 Doha, Qatar

Position: MECHANICAL ENGINEER (HVAC)

Year: 2007 – 2008

Duties and Responsibilty:

I worked as Mechanical Engineer and I am responsible for implementation on the Project. Prepare scope of work schedule for the project. Responsible in the mobilization of manpower, tools and equipment to the Site. I am also responsible to estimate the materials quantity-take base on the floor plan designed. We are preparing brochure devices to be use in the project, and submit to the designer for approval. I estimate and prepare the request of material need for installation and submit to the main office for the delivery of the item. I am attending the weekly and monthly coordination and construction meeting to discuss the percentage accomplishment work and some other pending works. I am conducting weekly meeting to all my subordinate to talked about their work and to give them some advised and ideas on how their work make it prompt and effortless for the project. I am preparing the monthly percentage accomplishment billing and submit to the office to check and approval. I am preparing as built- plan of the system and submit to the designer for approval. I arranged all the necessary submittal documents for final turn-over of the project and submit to the owner representative for their final acceptance

Company: AL SHARQ OFFICE CO.

For Trading, Contracting & Maintenance

P.O Box 85760 Riyadh 11672

Kingdom of Saudi Arabia

Position:

ELECTRO-MECHANICAL SUPERVISOR

Year:

2002 April – 2007 January

Project:

SAUDI TELECOMMUNICATION COMPANY

King Abdul Aziz, Telecom. Compound MURSALAT, RIYADH

BUILDING UNDER SUPERVISION:

# 41 AL-JAWAL (902) BUILDING

# 42 SIM CARD BUILDING # 43 NEW CUSTOMER CARE BUILDING

# 45 WARE HOUSE BUILDING # 96 ROYAL TELECOM

# 97 ROYAL TELECOM WORK SHOP BUILDING

# 99 SAUDIA AIRLINES BUILDING

DUTIES AND RESPONSIBILITIES:

I worked as Electro-Mechanical Supervisor. I am preparing the monthly preventive maintenance schedule (PMR) to all the buildings under my supervision. I was responsible to estimate materials and arrange tools for installation of new compressor, fan motor, and filter drier to use on site of my subordinate. I carry out routine inspection of all working equipment’s and then supervise my subordinate on their working site. I am preparing daily accomplishment work order and submit to STC building Representative for signature after completed. I am in charge of maintaining the 3 Units back-up diesel generator (Cummins=779kVA and (2) Kholer =1013kVA). I am preparing weekly test schedule for generators (with load & without load). If the generator is schedule for with load test, first we need to check the (fuel storage tank, diesel day tank, water level on radiator, oil tank, oil filter, air filter, fan blade and belt, battery voltage and electrical components). I am responsible to take the reading and log to the test form the output for (voltage, ampere, generator oil pressure, water temperature (in-out), and battery voltage). After the test load is done I am preparing the test form result and submit to the STC representative for signature.

I am responsible for maintaining the operation and preventive maintenance of 4 Units Air-cooled Centralize Chiller (Screw type compressor) with 275 tons of each, 9 units of Package air-conditioning unit, 17 units of Split air-conditioning unit. I am charge to monitor the entire equipment’s and electrical panels, which interface to the Building Management System (BMS). I am responsible to maintain the operation and preventive maintenance of firefighting system such as (fire pump, jockey pump, electrical control panel board). The water supply pump (horizontal and vertical pump) supplying the building. I am responsible to estimate the list of materials on some additional work for electrical and civil works.

Company: ELECTRO SYSTEM IND.CORP Position: PROJECT ENGINEER

Year: 1999 – 2002

Project: EQUITABLE BANK TOWER

Paseo de Roxas Avnue, Makati City

System: AUTOMATIC FIRE SPRINKLER SYSTEM (AFSS)

FIRE DETECTION AND ALARM SYSTEM (FDAS)

BUILDING MANAGEMENT SYSTEM (BMS)

TRAFFIC MANAGEMENT SYSTEM (TMS)

CLOSED CURCUIT TELEVISION SYSTEM (CCTV)

PUBLIC ADDRESS SYSTEM (PAB)

(HIGH RISE BUILDING-30thFLOOR and 7th BASEMENT)

DUTIES AND RESPOSIBILITIES:

•Project Implementation and Execution.

•Prepare project the Scope of work schedule.

•Prepare project mobilization for man powers and equipment.

•Review the estimation of materials quantity-take off base on the floor plan designed.

•Prepare brochures and materials or devices as stated in the materials specification and submit to the designer for approval.

•Prepare RFI. RFC of the system and coordinate with the Owner representative to conduct inspection of Preliminary testing and commissioning of the system,

•Prepare testing and commissioning (initial/ final test) of the system for inspection of the owner representative.

•Attend monthly and weekly Technical and Coordination meeting together with the other contractors for the percentage accomplishment work and to discuss some other pending works in the Project.

•Conduct weekly meeting to all my subordinate/manpower and discuss about their work and to give them some advice and ideas on how their work make it prompt and effortless for the project.

•Prepare material request (MR) regarding the status of the material in the Site and submit to Main office.

•Prepare weekly accomplishment and report to Operation Manager/ General Manager.

•Estimate materials take-off and material cost if there is a Revision on the Plan as per bid cost and submit to the Construction Manager for evaluation.

•Prepare monthly percentage accomplishment report as per actual system installation.

•Prepare the Monthly Billing percentage accomplishment and submit to the Main Office for their review and evaluation.

•Coordinate to Auto Cad operator regarding the As built- plan drawing as per actual system installation.

•Prepare and arrange all the necessary submittal documents for Final turn-over of the Project and submit to the owner representative for their final acceptance.

Company: PHILSAFETY SYSTEM AND EQUIPMENT INC.

Position: Project Engineer

Year: 1997 – 1999

Project: ORIENT SQUARE TOWER

Ortigas, Complex, Emerald Avenue Pasig City

System: AUTOMATIC FIRE SPRINKLER SYSTEM

(HIGH RISE BUILDING-47 FLOOR and 10th BASEMENT)

DUTIES AND RESPOSIBILITIES:

•Project Implementation & execution.

•Prepare Project Schedule as per Construction target of the completion of the project.

•Prepare project mobilization for man powers and equipment.

•Review the estimation of materials quantity-take off base on the floor plan designed.

•Prepare brochures and materials or devices as stated in the materials specification and submit to the designer for approval.

•Prepare testing and commissioning (initial/ final test) of the system for inspection of the owner representative.

•Attend monthly and weekly Technical and Coordination meeting together with the other contractors for the percentage accomplishment work and to discuss some other pending works in the Project.

•Conduct weekly meeting to all my subordinate/manpower and discuss about their work and to give them some advice and ideas on how their work make it prompt and effortless for the project.

•Prepare material request (MR) regarding the status of the material in the Site and submit to Main office.

•Prepare weekly accomplishment and report to Operation Manager/ General Manager.

•Estimate materials take-off and material cost if there is a Revision on the Plan as per bid cost and submit to the Construction Manager for evaluation.

•Prepare monthly percentage accomplishment report as per actual system installation.

•Prepare the Monthly Billing percentage accomplishment and submit to the Main Office for their review and evaluation.

•Coordinate to Auto Cad operator regarding the as built- plan drawing as per actual system installation.

•Prepare and arrange all the necessary submittal documents for Final turn-over of the Project and submit to the Consultant for their final acceptance.

Company:

PHILSAFETY SYSTEM AND EQUIPMENT INC.

Position:

Project Engineer

Year:

1996 – 1997

Project:

AIC GRANDE TOWER

Ortigas Avenue, Pasig City

System:

AUTOMATIC FIRE SPRINKLER SYSTEM

(HIGH RISE BUILDING-30th FLOOR and 10th BASEMENT)

Company:

TAIGENE METAL INDUSTRY CO. LTD.

Position:

HYDRAULIC MACHINE OPERATOR

Year:

1995 - 1996

Location:

TAIWAN (REPUBLIC OF CHINA)

Company:

GEOSTAR PHILS.INC

Position:

Shift Engineer

Year:

1993 - 1995

Location:

CULTURAL CENTER OF THE PHILS.

PASAY CITY, Philippines

Company:

JCD METAL FABRICATION

Position:

DRAFTSMAN

Year:

1992 - 1993

EDUCATIONAL ATTAINMENT:

COLLEGE:

Bachelor of Science in Mechanical Engineering

FEATI University

Sta. Cruz Manila, Philippines

1984 – 1991

HIGH SCHOOL:

Lakan Dula High School

Tondo, Manila

1980 – 1984

ELEMENTARY:

Caloocan Elementary School

Caloocan City

1974 – 1980

PERSONAL DATA:

Nickname: Thony

Home address: L-1, BLK-81 Phase IV Mabuhay City, Paliparan III Dasmarinas

Cavite City, Philippines 4114

Date of birth: January 17, 1967

Place of birth:

Manila

Citizenship:

Filipino

Religion:

Roman Catholic

Hobbies:

Basketball, Table tennis, Dart, Chess, Watching movies,

Marital Status: Provincial Address:

Married

Malasique, Pangasinan

Children’s: Patricia Andrea R. Macaalay

Keith Warren R. Macaalay

Princess Sage R. Macaalay

Rafael Andrei R. Macaalay

In case of Emergency notify: Mrs. Nora R. Macaalay

Mobile # +63-920-*******



Contact this candidate