Profile:

10 years of experience as Instrumentation designer in Oil & gas industries and have 18 years of overall experience in the field of drafting and designing. I am a keen communicator with honed problem solving and analytical abilities. I am having great skills in

PDS (Plant design system)

Microstation, AutoCAD, Navis Work, SPR

SPI (Smart Plant Instrumentation)

Education:

April 1997: Diploma in Electronics and Telecommunication Engineering

University Name: KBP Polytechnic

Languages: English, Hindi and Marathi

Work Experience:

September-2018 – Till Date SncLavalin (Abu Dhabi) –Senior Instrumentation designer

Upper Zakum AUP Phase-3 (Abu Dhabi) Central & West Island, Client: ADNOC OFFSHORE

Well Head Hook ups (Umm Shaif & Lower Zakum)

Preparation of System Block Diagrams

Preparation of Installation drawings and Hook up drawings

Preparation of Equipment Layout, Cable schedule, Tube schedule

Preparation of Termination drawings, Loop Drawings & Bulk MTO

June-2017–September-2018 Pyramid Engineering Solutions (Mumbai) –Instrumentation designer

Balkrishna Tyres Limited (Bhuj), Client: BKT

LPG Mounded Bullet project, Client: ONGC

Preparation of Instrument Index and I/O List

Preparation of Cable Tray Routing drawings

Preparation of Cable schedule, Junction box schedule

Preparation of Termination drawings

Preparation of Installation drawings and Hook up drawings

Preparation of Bulk MTO

November-2016–January-2017 Technip (Doha) –Instrumentation designer

MFP(OXY) Project. Client: OXY

Technip is a world leader in project management, engineering and construction for the energy industry.It was a Greenfield project with 11 numbers of oil production & water injection wells.

Responsibilities:

Instrument Tray modelling using Raceways (PDS)

Off-line instrument, JB modelling

Extraction of Cable Tray layout using PDS.

Hook Diagrams, Junction Box wiring diagrams.

Tools Used:

PDS, Microstation and Autocad

December-2013–March-2016 Technip (Abu Dhabi) –Instrumentation designer

FEED FOR JARN YAPHOUR DEPLTION DEVELOPMENT Project, Client: ADCO.

It was a gas line project.

Responsibilities:

Preparation of Instrument Trench routing drawings

Preparation of Cable schedule, Junction box schedule

Preparation of Cable Block diagrams, Compressor interface Block diagram

Preparation of Installation drawings and Hook up drawings

Preparation of Bulk MTO

Well Head Hook up (ZADCO) Project. Client: ZADCO

The scope of this project was to install topside facilities for the new producers and injectors to be drilled from WHPTs PC-20 and PC-80, provide facilities required to hook-up new well fluid pipelines to meet the processing requirements for new producers and injectors.

Additionally, topside modification of PC-63, PC-69, PW-32 and PW-38 platforms related to Hook up of new pig launcher/receiver to Production system are also required to be carried out under current project”.

Responsibilities:

Preparation of Instrument Cable routing drawings and instrument Location drawings.

Preparation of Cable schedule, Junction box schedule.

Preparation of JB wiring diagrams, Interconnection wiring diagrams

Preparation of Cable Block diagrams.

Preparation of Installation drawings and Hook up drawings.

Preparation of Bulk MTO.

Preparation of I/O List and Instrument Index using Excel.

Preparation of Loop diagrams.

Forward Mount Base Project. Client: QATAR PETROLEUM

This project involved Living Quarter as well as Utility Platform.

Responsibilities:

Preparation of Instrument Cable routing drawings.

Preparation of Instrument Location drawings.

Preparation of Cable schedule, Junction box schedule.

Preparation of JB wiring diagrams, Cable Block diagrams.

Preparation of Installation drawings and Hook up drawings.

Preparation of Bulk MTO.

Preparation of Control Room equipment Layout.

Preparation of HSSD layout.

October-2011–December 2013 Technip (Mumbai) – Instrumentation designer

HRD i.e. Heera Redevelopment Project. Client: ONGC

It was an EPC project which included Process platforms.

Etileno XXI: - BraskemIdesa SAPI (Mexico) Client: BRASKEM IDESA

It was a High Density Polyethylene (HDPE) Refinery Project.

Dahej Petrochemical Complex: - Ongc Petrol Addition Ltd. (Gujarat) Client: OPAL

It was a Butene-1 production project.

C3 Stream: - Indian Oil Corporation (Orissa) Refinery Project Client: IOCL

Responsibilities:

Cable tray and Junction box and Instrument 3D modelling using PDS.

Preparation of Instrument Cable routing drawings.

Preparation of Instrument Location drawings.

Preparation of Cable schedule, Junction box schedule.

Preparation of JB wiring diagrams, Cable Block diagrams.

Preparation of Installation drawings and Hook up drawings.

Preparation of Bulk MTO.

August-2010 – September 2011Lurgi India –Instrumentation designer

Lurgi is a German engineering, construction and chemical process licensing company. The head office is located in Frankfurt. Lurgi has been part of Air Liquide.

Indian Oil Corporation Limited (IOCL) project. Client: IOCL

It was a Green field downstream Project.

Responsibilities:

Instrument Cable Tray / Duct modeling using E– Raceways (PDS).

JB and Off-line Instruments modeling using Equipment Modeling.

Hook up drawings and Installation drawings

Cable Tray layout, Instrument Location layout & Air distribution Layout using microstation.

June 2005 – May 2009WS Atkins –Instrumentation designer

Zakum Development Company (ZADCO), UAE.

Qatar Petroleum, Khatiyah, Qatar.

Arabian Oil Company, Saudi Arabia.

Responsibilities:

Worked on As-Built drawings.

Control Room layout drawings.

Preparation of Installation details.

Preparation of Cable routing layout & Instrument location plan layout.

October 1997 – June 2005Rolta India Ltd.– CAD Designer

PSE & G

SASK Power Corporation

Saskatchewan: Canada.

G-Electric, Toronto Hydro

Dubai Municipality

Sanjose

TELUS Migration

NGRID

STC

Responsibilities:

Preparing the project schedules, manpower allocation plans, production setup activities, etc. for ensuring completion of projects within stipulated time and quality norms.

Conducting training for Microstation, I/RASC and I/RASB.

Maintaining daily production status; finalizing and conducting on-line quality checking.

Hobbies: