Post Job Free

Resume

Sign in

Taking care of entire factory operation and maintenance works in multi

Location:
Vasant Nagar, Karnataka, India
Salary:
51 k
Posted:
August 17, 2019

Contact this candidate

Resume:

RESUME

MR.S.BASKARAN ADDRESS;-

NO,* CHINNU GARDEN

ac93re@r.postjobfree.com CHELLA MUTHU NAGAR,POLLACHI.TN

ac93re@r.postjobfree.com MOBILE—890-***-****

782-***-****

CAREER OBJECTIVE;-TO BE ASSOCIATED WITH A REPUTED CONCERN AS A

CHIEF ENGINEER.

CAREER EXPERIENCE FROM THE PRESENT EMPLOYER;-

COMPETENT ELECTRICAL SUPERVISORY CERTIFICATE HOLDER WITH 15 YEARS IN

HOTEL INDUSTRY AND 4.7 YEARS IN MANIFACTURING INDUSTRY.

A.WORKING WITH GREAT MOUNT RESORT (COCO LAGOON) POLLACHI

WORKING AS A CHIEF ENGINEER FROM MAY-18 to July-19.

B.WORKED WITH THE RESIDENCY TOWERS 5 STAR HOTEL WORKING AS A

MAINTENANCE MANAGER FROM AUG-15 TO MAR-18 (2.6 YEARS)

C.WORKED WITH AMBASSADOR PALLAVA HOTEL(ISO 22000 CERTIFIED 4 STAR HOTEL)

AS AN ACTING CHIEF ENGINEER FROM MAY-07 TO AUG 15.(8YEARS)

D.WORKED WITH RADISSON GRT HOTEL (HACCP CERTIFIED 5 STAR HOTEL)

AS AN ENGINEERING SUPERVISOR FROM MAY-05 TO APR-07 (2 YEARS).

E.WORKED WITH BREEZE HOTEL (ISO-9001-2000 3 STAR HOTEL) AS A SENIOR

SUPERVISOR MAINTENANCE FROM 05.01.2001 TO 26.05.2005 (4.10 YEARS).

F.WORKED WITH WORTH PLASTICS (ISO-9002)AS AN ELECTRICAL SUPERVISOR

FROM 21.04.1997 TO 27.05.1999 (2.1 YEARS).

G.WORKED WITH NEPC AGRO FOODS LTD AS AN ELECTRICAL SUPERVISOR FROM

22.10.1994 TO 18.04.1997 (2.6 YEARS).

(TOTAL EXPERIENCE-21 YEARS)

DETAILS OF ASSIGNMENT UNDERTAKEN;-

A.WITH HOTEL THE RESIDENCY TOWERS AS MAINTENACE MANAGER

OPERATION AND MAINTENCE OF 5 STAR HOTEL WITH 135 ROOMS COMPLETE BUILDING MAINTENANCE WITH 2 RESTAURANTS AND 4 BANQUET HALLS,LAUNDRY FOR THE HOTEL. MAJOR EQUIPMENTS INCLUDE 750 KVA TRANSFORMERS,750 KVA DG SETS,250 TR TRANE

PAGE 1 OF 6

MAKE SCREW CHILLERS AND ASSOCIATED PUMPS AND NON IBR BOILERS.PERIODICAL AND PREVENTIVE MAINTENANCE SCHDULES AND DETAILED FOLLOW UPS

FOR IMPLEMENTATION.

PROJECTS SUPERVISED;-

REVAMPING OF SEWAGE TREATMENT PLANT,INSTALLTION OF FIRE ALARAM SYSTEM

BANQUET HALLS RENOVATION AND RESTAURENT RENOVATION.

B.WITH HOTEL AMBASSADOR PALLAVA AS AN ACTING CHIEF ENGINEER;-

OPERATIONAL MAINTENANCE OF 4 STAR HOTEL WITH 106 ROOMS,ONE RESTAURANTS,

AND 4 BANQUET HALLS, LAUNDRY FOR THE HOTEL. MAJOR EQUIPMENTS

INCLUDE 750 KVA TRANSFORMER,500 KVA DG SETS,335 TR TRANE MAKE

SCREW CHILLERS AND ASSOCIATED PUMPS AND NON IBR BOILERS.

PERIODICAL AND PREVENTIVE MAINTENANCE SCHDULES AND DETAILED FOLLOW UPS

FOR IMPLEMENTATION.

C.WITH RADISSON GRT HOTEL AS AN ENGINEERING SUPERVISOR;-

OPERATIONAL MAINTENANCE OF 5 STAR HOTEL WITH 101 ROOMS,TWO RESTAURANTS,

AND 4 BANQUET HALLS, CENTRALISED LAUNDRY FOR THE GROUP. MAJOR EQUIPMENTS

INCLUDE 1250 KVA TRANSFORMER WITH OLTC,500 KVA DG SETS,180TR TRANE MAKE

SCREW CHILLERS AND ASSOCIATED PUMPS WITH VFD’S AND NON IBR BOILERS,

STP PLANT,BUILDING AUTOMATION SYSTEM(ABMS)FOR HVAC.

PERIODICAL AND PREVENTIVE MAINTENANCE SCHDULES AND DETAILED FOLLOW UPS

FOR IMPLEMENTATION.

PROJECTS SUPERVISED;-

REVAMPING OF SEWAGE TREATMENT PLANT.

ENERGY AND OPERATIONAL EFFICENCY MEASURES IMPLEMENTED;-

HOT WATER CORREDED MS LINES REPLACED WITH CPVC TO PREVENT CORROSION AND ENSURING LONGETIVITY.

PARTICPATION IN IMPLEMENTATION OF TRITON SOFTWARE HAS ENSURED ON EFFICENT COMPLAINT MANAGEMENT SYSTEM THROUGH COMPUTER AND MOBILE INTERFACE.

SYSTEMATIC PROCEDURE IN UTILITES AND PROCESS FOR HACCP CERTIFICATION.

1 NO BEST EMPLOYEE CERTIFICATE AND 4 NOS APPRECIATION LETTERS HAVE GOT

FOR COST CONTROL ON ENERGY CONSERVATION AND SAFETY OF THE EMPLOYEE

AND GUET.

Page 2 of 6

D.WITH BREEZE HOTEL AS SENIOR SUPERVISOR MAINTENANCE;-

OPERATION MAINTENANCE OF 3 STAR HOTEL WITH 100 ROOMS,TWO RESTAURANTS,

6 BANQUET HALLS,AND INHOUSE LAUNDRY. MAJOR EQUIPMENTS INCLUDE

1000 KVA TRANSFORMER WITH OLTC,500 & 250 KVA GENSETS,220TR YARK

CHILLERS,NON IBR BOILER,HOT WATER BOILER.

PROJECTS HANDELED;-ROOM RENNOVATIONS

THE FOLLOWING WORKS WERE CARRIEDOUT BY ME

3 TIMES ELECTRICAL AND LIFT ANNUAL INSPECTIONS WERE TAKEN CARE BY ME.

I WAS A INTERNAL QUALITY AUDITOR FOR ISO-9001-2000,I HAVE DONE

INTERNAL AUDIT AT VARIOUS DEPARTMENT.

PREPARING THE EXPENSE DETAILS OF POWER CONSUMPTION,FUEL,WATER AND

GENERAL MAINTENANCE EXPENSES ON DAILY AND MONTHLY BASIS.

PREPARING DOCUMENTATION THROUGH COMPUTER COMPLETE DETAILS OF DEPT MOP

(MEASUREMENT OF PERFORMANCE)TO SUBMIT FOR MONTHLY REVIEW MEETING

(CHARTS OF COMPLAINT ANALYSIS REPORT,COMPARISON CHARTS OF ELECTRICAL,

DIESEL,WATER CONSUMPTION AND GENERAL MAINT EXPENSE).

ENERGY SAVING MEASURES IMPLEMENTED.

ACHIVEMENT;-

I HAVE DONE AMF PANEL FOR CATERPILLER MAKE 250KVA GENST WITH LOWEST

BUDJET.

E.WITH WORTH PLASTICS AS AN ELECTRICAL SUPERVISOR;-

AS PER ISO PROCEDURE OPERATION AND MAINTENANCE WORKS WERE BEING

CARRIED OUT ON ALL EQUIPMENTS SUCH AS 250KVA TRANSFORMER,250KV DG SET,

AND PLASTIC INJECTION MOULDING MACHINES.

WENT TO VARIOUS FACTORIES (PONDICHERY,TIRUCHY,CHENGALPATTU)UNITS OF

WORTH TRUST AND ATTENED CRICTICAL COMPLAINTS ON DG SET,THREAD ROLLING

MACHINE AND LATHES.

F.WITH NEPC AGRO FOODS LTD AS AN ELECTRICAL SUPERVISOR;-

MAINT WORKS CARRIED OUT ON SALT PLANT EQUIPMENTS INCLUDE 250KVA DG SET,

AND TRANSFORMER,PACKING MACHINES.

Page 3 of 6

KNOWLEDGE/SKILLS;-

AT PRESENT I AM ASSISTING AND REPORTING TO CHIEF ENGINEER AND ALSO

LOOKING MULTISKILL JOBS LIKE ELECTRICAL,PLUMBING,TELEVISION,TELEPHONE,

AIRCONDITION,CARPENTER INCLUDING MECHANICAL AND CIVIL JOBS.

THOROUGH KNOWLEDGE OF ELECTRICAL,MECHANICAL,CIVIL AND WORKING KNOWLEDGE

ALL OTHER PLANT,EQUIPMENTS AND UTILITIES.

ENERGY CONSERVATION TECHNIQUES.

ENGINEERING INVENTORY (SPARE PARTS MANAGEMENT)

KNOWLEDGE OF STATUTORY COMPLIANCES RELATED TO ELECTRICAL FITTINGS

AND LIFTS.

WORK ORDER PREPARATION FOR CONTRACT JOBS.

PERIODIC AND PREVENTIVE MAINTENACE WORKS.

ANALYSING AND IMPLEMENTING OF COST CONTROL MEASURES ON POWER,FUEL,

WATER.

PREPARING THE EXPENSE DETAILS OF POWER CONSUMPTION,FUEL,WATER AND

GENERAL MAINTENANCE EXPENSES ON DAILY AND MONTHLY BASIS.

WORKING KNOWLEDGE OF MS OFFICE AND EXCEL.

EDUCATIONAL BACKGROUND

Stage

Name of Institutions

Affiliation

Year of Passing

Electrical Supervisor

Central Polytechnic Chennai-113

Board of exam

1995

N.A.C

Electrical

Govt I.T.I

Chennai-32.

State Council for vocations training

1994

I.T.I. Electrical

Govt. I.T.I. Vellore-10

State Council for vocations training

1991

(BSc)

Madras university

University Exam

1997

Page 4 of 6

`C'Licence issued by Tamil Nadu Govt. Electrical Licensing Board.

Licence No. : C 21265'

Date of Issue : 15.11.1996

Valid till 14.11.2020

ADDITIONAL QUALIFICATION

I.SCADA & PLC Programming course-CENTRAL POLYTECHNIC CH-113.

(SIEMENS,AB,OMERAN,MESSUNG)

II.Diploma in Computer Technology –six months

SISI,(SMALL SCALE INDUSTRIES GOVT. OF INDIA)-chennai-21

III.Diploma in Electrical CAD –(Auto cad with pc schematic

EL automation-Denmark software,version 4.02)

CADD CENTRE CHENNAI - 29.

IV. Fire Fighting Techniques and handling of fire fighting equipments. Training from (EVER LIFE FIRE SERVICE- CH-34)

V. First aid on workshop training from - USHA FIRE SAFETY EQUIPMENT LTD. Chennai.

VI. Rastrabasha Exam Passed in Hindi Language.

VII. Following short term courses are completed in

NSIC TECHNICAL SERVICES CENTRE at CHENNAI - 32.

(A Government of India Enterprises)

1. Hydraulics & Pneumatic Controls

(with introduction to PLC)

VIII. Following short term course are completed in FOREMEN TRAINING INSTITUTE at BANGALORE - 22. (Ministry of Labour Govt. of India).

1. C.N.C. Machine Maintenance.

PAGE 5 OF 6

IX.Following short term courses are completed in ADVANCE TRAINING INSTITUTE AT CHENNAI - 32, (Ministry of Labour Govt. of India).

1. A.C, D.C, Drives and controls of Electric motors.

2. Maintenance and service of power supplies stabilizers

inverters and UPS.

PERSONAL DATA

Father's Name : A.M.Subrhamanian

Date of Birth : 10.06.1970

Marital Status : Married

Nationality : Indian

Languages Known : English, Tamil, Telugu, Hindi

Minimum time required

to join : 1 month

PASSPORT DETAILS;

PASSPORT IS UNDER RENEWAL

Permanent Address : Pillayar Koil Street

Angarankuppam Village & Post

Via-Vadugathangal

Pin: 632 204

Vellore District

TAMIL NADU,INDIA.

(S.BAASKARAN)

page 6 of 6



Contact this candidate