Resume

Sign in

Manager Project

Location:
Gonzales, Louisiana, United States
Posted:
March 20, 2019

Contact this candidate

Resume:

AUBURN J. WESSMAN

***** **** **** ***

Geismar, LA 70734

225-***-****

ac8un8@r.postjobfree.com

DIRECTOR

Work Experience:

Phylway Construction, LLC (2008-2018) – Director

James Construction Group (PRIMORIS) (2001-2008) – Project Controls Mgr./ Project Mgr.

Allen & Hoshall Architects and Engineers (2000-2001)

THY Surveyors and Engineers (1997-2000)

Neel-Schaffer (1995-1997)

OxyChem (Occidental Chemical Corporation) (1993-1995)

I have nearly a quarter century of heavy-civil and petrochemical construction experience. For the past ten years I served as a company director for Phylway Construction assisting their push into the federal market under contracts issued by the United States Army Corps of Engineers. As a director I was involved in all projects from bid, construction, and closeout. I assisted their estimators with subcontractor and material quote requests, bid strategy, scheduling, technical writing and resource management. During construction I monitored all projects on a global scale and assisted project managers with issues that arose in regard to technical matters, constructability, quality control, safety, resources, environmental monitoring, and client relations. I monitored and assisted project managers with project cost control, billings, change order flow and accountability. Additionally, I managed all of the companies Quality Control Managers, managed and monitored all environmental permitting and compliance, managed the Small and Disadvantaged Business Participation Program; and also assisted the Safety and Health Director with compliance, staff management of SSHO’s, and investigations and reporting. I also served in a business development capacity by meeting with new and existing vendors and subcontractors, attending industry trade events, entertaining clients, representing the company at various political fund raisers for many of our local, state, and federal representatives.

With James Construction Group I served as the Project Controls Manager on the Marathon Petroleum Corporation expansion in Garyville, it was the first Mega-Project in the US and the first Refinery constructed in nearly 3 decades. At peak I had 20 direct staff with over 800 employees and 400 pieces of billable equipment on site. Also, during my time with JCG I served as project manager on various projects in Mississippi, Arkansas and Louisiana.

PARTIAL PROJECTS LIST

CPRA Mid-Sediment Diversion ($1.5B – CMAR subcontract value $503MM)

USACOE - NOV-NF-W-06a3, West Pointe a La Hache to St. Jude Levee ($8,208,341.18)

USACOE – LPV ARM-04 System Armoring (LPV-108 and LPV-109 to I-10) ($10,981,589.00)

UPUD Pond Deepening ($1,455,045.20)

USACOE – LPV ARM-02 Levee HPTRM Armoring, Reaches LPV 102, LPV 103, and LPV 104 ($5,798,522.00)

USACOE – Manchac Levee Enlargement, Stations 638+00 to 794+00 ($3,947,740.00)

Morganza to the Gulf Hurricane Protection Levee - Reach G, Segment 1 ($4,192,205.00)

USACOE – West Bank Non-Federal Levee, Wilkinson Pump Station ($32,557,226.97)

USACOE – Upper Reach A West Bank Back Levee, St. Jude to City Price ($27,826,149.00)

USACOE – Algiers Forebay Stability Berm B/L Sta. 388+00 to B/L Sta. 433+00 ($623,197.00)

USACOE – City of Carencro Continuing Authorities Program, Section 205 ($1,218,742.00)

Ashland North Levee Improvement and Extension ($1,624,007.28)

Lafourche Parish Government – Laurel Valley Road Improvements ($3,080,256.00)

Terrebonne Parish Consolidated Government – Lower Ward 7 Levee & Drainage System, Filling of Drainage Canal ($329,909.00)

USACOE – Mississippi River Seepage Control Items 458-L/465-L ($3,051,073.00)

USACOE – LPV 20.2 Reach 3 and Reach 4 Berm Enlargement and Foreshore Protection ($32,071,938.54)

USACOE – Duncan Point Seepage Berm and road Relocation ($3,335,485.00)

USACOE – WBV-14e.2 V-Line Levee East of Vertex ($14,521,578.00)

USACOE – LPV 19.2 Reach 4 – 3rd Enlargement – Phase II ($3,024,950.25)

USACOE – Lakefront Levee - LPV 00.2 Reach 1 – 4th Enlargement – Phase II ($4,409,741.17)

USACOE – Lake Pontchartrain & Vicinity Levee, Reach LPV 18.2, Williams Blvd. Floodgate ($3,366,488.00)

USACOE – Lake Cataouatche Levee Enlargement WBV-15a.2 ($41,372,661.00)

USACOE - New Westwego P.S. to Orleans Village Phase 2, 1st Lift Levee and Floodwalls at Westminster Pumping Station, WBV 14c.2 ($31,622,638.00)

USACOE – St. Charles Reach 2B Levee, Good Hope to Cross Bayou, Ph 2, Reach LPV-05.2B ($20,126,065.00)

USACOE – WBV-73 Western Tie-In Highway Crossing Pile Load Tests ($952,115.95.00)

Louis Armstrong New Orleans International Airport – Terminal Apron Rehabilitation ($4,507,064.00)

Terrebonne Parish Consolidated Government – Lower Ward 7 Maintenance North of Boudreaux Canal to South of Lashbrook Pump Station ($1,333,411.00)

Greater Lafourche Port Commission – Taxiway “A” North Paving at the South Lafourche Leonard Miller Jr. Airport ($4,489,088.00)

City of Gonzales, Louisiana – West Worthey Road Improvements, Phase II ($4,165,638.00)

Jefferson Parish Department of Public Works – Churchill Technology and Business Park Offsite Sewer ($1,318,391.00)

South Lafourche Levee District – Section C-South Levee Improvements ($501,624.00)

LADOTD – LA 308 Shoulder Widening ($336,464.00)

USACE – London Avenue Canal Floodwall ($9,083,000.00)

LADOTD – Groom Road Improvements ($2,429,000.00)

LADOTD – Bayou Black Bridge ($561,000.00)

LADOTD – 182 Bridges Amelia, LA ($2,429,000.00)

LADOTD – LA 10 & LA 372 Oakdale, LA ($10,425,000.00)

LADOTD – I-10 & I-12 Soundwalls Baton Rouge, LA ($17,228,000.00)

LADOTD – I-12 Patching Baton Rouge, LA ($1,980,000.00)

MDOT – I-55 Interchange (NISSAN) Madison, MS ($32,154,000.00)

Marathon Petroleum Company – Garyville Major Expansion ($140,000,000.00)

City Parish East Baton Rouge – Plank Road Relocation ($9,049,000.00)

Baton Rouge Regional Airport Authority – 22L-4R Runway ($4,272,000.00)

AHTD – I-40 West Memphis, AR ($13,060,000.00)

Memphis Shelby County Airport Authority – Taxiway Zulu ($14,662,000.00)

Memphis Shelby County Airport Authority – Taxiway Charlie and Runway 18C Extension ($20,000,000.00)

Memphis Shelby County Airport Authority – Taxiway November ($9,215,000.00)

Memphis Shelby County Airport Authority – Runway 18C and Taxiway Charlie ($100,000,000.00)

Memphis Shelby County Airport Authority – Runway 18-36C Navaids ($2,100,000.00)

Memphis Shelby County Airport Authority – Terminal A, B, C Improvements

Memphis Shelby County Airport Authority – Taxiway Yankee

Memphis Shelby County Airport Authority – Taxiway Yankee Bridge

Education and Training:

Attended Mississippi State University and McNeese State University attaining Senior Classification in Chemical Engineering emphasis in Law

First Aid / CPR

ATSSA Traffic Control Supervisor / ATSSA Flagger Instructor

Troxler Nuclear Gauge Safety Training

Troxler Radiation Safety Officer Training

OSHA 10 Hour Outreach Training

OSHA 30 Hour Outreach Training

USACE Quality Control Management certification

SureTrak Project Manager Scheduling program

Primavera Project Planner (P3 and P6)

QCS

AutoCAD/Terramodel/Site Manager

Microsoft Suite

Adobe



Contact this candidate