ENGR. HAROLD N. SUERTO

Block *, lot * Celerina Heights Subd., Davao City, Philippines

Mobile No. +639********* & +639********* / 639*********

E- mail add: ac8fxw@r.postjobfree.com / ac8fxw@r.postjobfree.com

Skype id: harold.suerto

LICENSED MECHANICAL ENGINEER:

PRC No. : 0068770

Ratings : 72.85% (passed)

Registration Date: July 31, 2007

Expiration Date: Dec. 27, 2017

OBJECTIVES:

To carry out Mechanical Department support functions of the company and to contribute actively as a member of the company in order to achieve the company’s objectives.

EXECUTIVE SUMMARY:(INDUSTRIAL STRUCTURAL FACILITIES)

PROFESSIONAL EXPERIENCE: (24 years of experiences)

(PMT)PROJECT MANAGEMENT TEAM DIVISION-MECHANICALSUPERINTENDENT

*Experience field of Mechanical Engineering as (PMT) PROJECT

MANAGEMENT TEAM DIVISION-MECHANICAL SUPERINTENDENT, for me management my duties and responsibility of my supervisory level during the construction of the project in site to assist Senior Project Manager in

Supervising Project Engineers, consultants, contractors and if applicable foremen. Reporting to the senior Project Manager for the performance for reviewing & mentoring of their work.

* In terms of project management team to help and assist the consultant and contractor for Taken Projects from their conception for the completion as well as participating in Planning, designing and during construction of the projects to managed the quality control for inspection and installation of the equipment both Mechanical(Rotating equipment, Static equipment and structural) especially during Pre- commissioning, commissioning, pre-start up in multi-disciplined with my strong Leadership and team to Build the quality in Oil and Gas project Plant in Jazan and in Petro Rabigh projects in Saudi Arabia.

*Involved in construction, fabrication, erection, punch listing, testing in work package documentation, signing off acceptance of the project for final turn-over, pre-commissioning and in commissioning stages of the project of the consultant and the contractor.

CONSULTANT MECHANICAL ENGINEER

*Experience field of Mechanical Engineering as CONSULTANT MECHANICAL ENGINEER in mechanical/piping crafts schedule and develop short-term look to ahead the schedules of work-fronts for Supervisors in alignment with the Subcontractor, contractors and consultant during execution of plan. Make punch list report after inspection prior to hydro test, pressure test in dimensional and Check of spools, make progress report for the quality of work done by the contractor and consultant for my approval. Acceptance for final turn-over of the project after pre-commissioning and commissioning stages. Evaluates the equipment’s as well as the rotating equipment, static equipment, structural and piping services execution for compliance of contract according to scope of works to meet the client’s needs and concern.

TECHNICAL KNOWLEDGE:

Expert in field of Mechanical Engineering, management, Supervision, Quality Control Inspection, Flange Management in Construction, Pre-commissioning, Commissioning, pre start up, both in Mechanical (rotating equipment, static equipment, Piping services and Structural system).

INTERPERSONAL SKILLS:

*Good team player with ability to work within multi-functional teams, self-motivated and able to work independently to meet tight deadlines. Good communicator at all levels, Innovative thinker in which flexible to meet changing requirement. Capable of adapting to various sites and situations.

WORKING EXPERIENCES:

From To Position Company

March.15, 2017–at present Project Engr./ J.J SUERTO Architect & Partner

Project Inspector MARANDING, LALA, LANAO

DEL NORTE, Philippines.

FOR HVAC: 5 Storey commercial building project

DUTIES & RESPONSIBILITIES:

1. My Job duties include the design, installation of heating, ventilation of air conditioning unit cooling, and

refrigeration systems.

2. Systems for residential and commercial buildings, and, office buildings, facilities.

3. I meet directly with clients, work with engineering colleagues like management, installers and design new

systems or find solutions for existing system problems, and prepare estimates.

FOR PLUMBING:

DUTIES & RESPONSIBILITIES:

1.Water service plumbing work pipe laying, installation, alteration for new of water pipes, tanks, taps and fittings in

the drinking water supply system.

SANITARY WORKS

1.Deals with sanitary discharge pipes and sanitary appliances (water closet or WC, urinal, sink, etc)

2.Such as installing or relocating toilet bowls and sanitary piping system.

3.And carrying used water from the premise/building to the used water system.

FOR FIRE PROTECTION SYSTEM:

DUTIES & RESPONSIBILITIES:

1.Generating fire protection life safety code analyses.

2. Performing sprinkler system shop drawing plan reviews.

3. Performing hydraulic and seismic bracing calculation reviews.

4. Performing site inspections and generating field reports.

5. Generating narratives, cost estimates, and performing calculations.

6.Coordinating fire protection features with other disciplines.

From To Position Company

09/18/2014 09/20/2016 Project Management team Namariq Arabian Services

Division-Mechanical Co. Ltd.,Jazan K.S.A

Superintendent JAZAN-ISF PROJECT

DUTIES & RESPONSIBILITIES:

1. Provide functional expertise in an administrative process.

2. Work with users to ensure the project meets business needs.

3. Documentation and analysis of current and future processes/systems.

4. Identification and mapping of information needs.

5. Defining requirements for reporting and interfacing.

6. Reviews project activities for compliance with procedures and standard.

7. Manages the support and provision of project tools and equipment.

8. Establishes standard, tools and procedures for use on project, Including Issue, Risk,

change and information management.

9. Assist with testing.

10. Contributing to technical strategy, policy and procedure.

11. Development and operation of technical testing programs.

12. Production of technical documentation to agreed quality standards.

13. Managing consultancy input within the defined budget.

14. Managing and leading the project team.

15. Managing project deliverable in line with the project plan.

16. Monitoring project progress and performance.

PIPING SYSTEM:(STANDARD PRESSURE PIPING)

WORKING as (PMT) PROJECT MANAGEMENT TEAM DIVISION-MECHANICAL PIPING SUPERINTENDENT (STATIC EQUIPMENTS).

1. Reviewing job estimates and prepare project budgets.

2. Estimating and negotiating change orders.

3. Track, forecast, report labor hours and material costs.

4. Expediting and track deliveries of major equipment/materials.

5. Maintaining working knowledge of general conditions, work scope and

specifications of project contract/subcontract.

6. Maintaining and control documents in compliance with policies, as well as Contractual compliance.

7. Collaborate with the design team on design-build projects.

8. Reviewing contract drawings, detail drawings and specifications.

9. Ensure full compliance with Modern Piping, Inc. safety program at the Jobsite.

10.Providing proactive, clear and timely communication to team members.

11. To be professional and uphold company values.

12. Maintaining Regular attendance and promptness to be considered part of each

Employee’s essential job functions.

FOR PIPING CHECK-OUT:

1. To confirm complete installations of all required parts.

2. To perform hydro test and pressure test

3. Solving problems all issues with gasket welds and valves.

4. Performing system cleans out.

5. Washing caustic/surfactant to remove oil, grease &other contaminants

6. Detergent flush.

7. Washing acid for completing the cleaning process & remove elemental iron from stainless steel.

8. Visualize inspect tanks & piping to verify that clean-in-place (CIP) systems are adequate.

9. To Perform system passivization.

10. Washing chemical to protect and cleaned stainless steel from chloride attack.

PRE-COMMISSIONING ACTIVITIES:

1.Hydro test of pipelines and leakage test of pipeline

2. Flushing & Cleaning of pipelines.

3. For System Dry-out.

4. Inerting.

5. Systematic Conformity check of equipment's.

6. And Static, DE-Energized test of equipment's.

FOR MECHANICAL COMPLETIONS AUDITS:

The audit Includes such activities as:

1. To confirm correct equipment's Installation.

2. And correct Installation procedure of each of equipment.

3. Check the type of equipment’s & amount of lubrication.

4. Checking the rotation of the rotating equipment.

FOR INSTALLATION AND COMMISSIONING PERIOD.

A). Installation and commissioning of mechanical equipment such as rotating and static equipment's/conduct test and

inspections to ensure that in Operational and effectiveness according to the client needs and concerns.

B). Reviewing engineering drawings, layout, diagrams, technical Specifications, cost estimates for erection of the

testing & commissioning.

TESTING and COMMISSIONING

DUTIES & RESPONSIBILITIES:

FOR ROTATING & STATIC EQUIPMENT

1. Managing for smooth commissioning of the project by coordinating between the Company and the contractor.

2. Supervising and approve commissioning plans in accordance with the project guidelines.

3. Reviewing designs and supervise onsite commissioning activities.

4. Preparing and maintaining commission records of site observations, testing processes and checklist.

5. Outline procedures, norms and details for writing the system manual.

6. Monitoring installation, submittals and usage of engineering tools adhering

To project and commissioning guidelines.

7. Guide testing processes & motivate specialists to achieve standard results.

8. Assist with Identification and redresses of and malfunction issues.

9. Tracking and reviewing progress through meetings.

10. Evaluating contractual commissioning statics and instruction guidelines in

accordance with the needs of the project.

11. Compile commissioning report data for summarizing.

12. Assist in summarizing and updating commission records.

13. Scheduling and supervising operational reviews in association with functional staff.

14. Create an empowering and inspiring work culture with the Commissioning team.

15. Attain customer satisfaction through adhering to owner guidelines with the entire project team.

COMMISSIONING ACTIVITIES:

1. Perform Preliminary Check

2. The Functional Check

3. The Operational Test

4. And Start up Activities

OPERATION AND MAINTENANCE TO RUN THE PLANT

TECHNICAL SUPPORT: 24/7

(During operation and Maintenance).

I perform operation and maintenance w/in 6 months’ period before handover

To the client the operation and maintenance as per contract agreement.

1. As a (PMT)PROJECT MANAGEMENT TEAM DIVISION and together with me team should understand the

importance technical support of the rotating equipment machinery.

2. With my team Operation and Maintenance Engineers should know that the machined is better than anyone else.

3. A team with highly experience consultant Mechanical Engineers.

4. I should priorities the technical supports services available with a guaranteed same day response.

5. I should track the status of every technical query that I received.

MONTHLY EQUIPMENT STATUS REPORT:

1. The assurance of the health with the equipment is being regularly monitored

by the operation and maintenance engineer.

2. The machined operational performance should be predictable.

3. Issues with the machined can be detected at an earlier stages-this helps to avoid costly remedial work and

support preventive maintenance planning.

EQUIPMENT LIFE EXTENSION:

1. Provides assurances related to safety and reability when the decision is

taken to operate beyond the original intended life of the plant.

2. I’m the best place to support the rotating equipment in assessing this in a structured and assured manner.

3. On site assessments together with my team I collaborate with the supplier to understand how the machine has

been operated in the past and what is the future operational intend.

4. I allow practical risk based decisions to be made, supported by the structured action plan.

TROUBLE SHOOTING:

1. Based on my experience as a (PMT)PROJECT MANAGEMENT TEAM DIVISION, operation and maintenance

engineer means, together with them we have seen and dealt with most faults that can occur.

2. Together with my team our skilled engineer works with the clients to diagnose faults and isolate the root cause to

prevent re-occurrence.

3. We normally start this process remotely, and will mobilize to site as required.

PLANNED MAINTENANCE:

1. I actively encourage my team the maintenance operation engineers to develop maintenance plans as part of

pro-active maintenance regime.

2. As a (PMT) PROJECT MANAGEMENT TEAM, I have to comprehensive work scopes for all schedule inspection

and maintenance overhauls which we can customize to specific operational conditions.

3. Together with my team we will give an estimated time to undertake the work so the downtime can be planned.

OUTAGE MANAGEMENT:

1. Project management skills combined with engineering experience ensure that we apply the highest standards to

manage quality of execution schedule and cost.

2. Detailed and carefully pre-planning activities and risk assessment. We start Will in advance of the planned

outage, to give all parties time to prepare for the execution phase.

3. Through our networks of partners and my team the operation and maintenance engineers we are able to arrange

all resources needed.

EMERGENCY BREAKDOWN RESPONSE:

1. When failure occurs us response quickly and start immediately to mitigate the impact of the situation.

2. We understand the operational impact of the equipment failure and will therefore, always strive to get

equipment backs up and running in the safe manner in the shortest possible time.

3. Can support the continuity plans to cover the response in the event of an emergency breakdown.

THE FOLLOWING ROTATING EQUIPMENT HANDOVER TO THE CLEINT.

FOR ROTATING EQUIPMENT:

A) HVAC SYSTEM (AHU, FCU and PACU)

B) COMPRESSOR (Reciprocating, centrifugal, gear and screw type Compressor).

C) LIFTING STATION

D) PUMPS (centrifugal, Horizontal split case screw pump).

FOR STATIC EQUIPMENT:

A) HEAT EXCHANGER (COUNTER FLOW TYPE)

B) FIRE PROTECTION SYSTEM

C) PRESSURE TANK

D) PIPING, VALVES and FITTINGS and there APPURENCES. (HVAC, FIRE PROTECTION AND PLUMBING)

I FINISHED TWO PROJECTS IN THE FOLLOWING LOCATION:

1. JAZAN (Economic City Authority) Commission and testing last Nov. 2014 up to

January 2015 (now is in operation) JAZAN INDUSTRIAL STRUCRURAL FACILITIES.

2. JEDDAH (King Abdullah Economic City) Pre-Commissioning

And testing &commissioning last July 2016 up to September 2016

(Now is in operation) INDUSTRIAL STRUCTURAL FACILITIES.

From To Position Company

Feb. 14,2012- Feb. 15,2014 Consultant Mechanical Engineer Project House For

Engineering Consulting

Riyadh, Saudi Arabia

DUTIES & RESPONSIBILITIES:

1. Mechanical Consultant Engineer.

2. QA/QC (MFPPS) Mechanical fire protection, plumbing & sanitary Engineer.

3. HVAC, Installation Engineer and HVAC Coordinator in (BMS) BUILDING MANAGEMENT SYSTEM.

4. Mechanical Field Engineer & Site Supervisor Engineer.

5. Consult/lead construction team.

6. Conversant in formulation/preparation of feasibility project report.

7. Make comparison of the main parameter of a new project within a similar Data of an existing units.

8. Capable to interact with the Top Management for strategic planning for Industrial growth of the company.

9. Implementing & formalized project plan schedule which includes regular site Visiting and monitoring.

10. Prepare site memo and give verbal instructions for piping /mechanical

Works to coordinated and to be finished by sub-contractors.

11. Controlling of construction progress to be ahead of the project schedule &

Preparing for constructions procedures.

12. Understand the broad parameter in a project proposal.

13. Always willing to help the contractor or other less experienced team Members with workloads.

14. Attending, managers/consultants meeting and coordinating to each department and sub-contractors regarding

for construction, maintenance Including QHSE for our people/labors.

SADARA CHEMICAL COMPANY (OIL and GAS) IN JUBAIL SAUDI ARABIA

PIPING SYSTEM:(STANDARD PRESSURE PIPING)

WORKING FOR MECHANICAL PIPING CONSULTANT:

1. Managed field construction operations.

2. Directed craft field construction operations.

3. Assist in the development of inspection and commissioning plans.

4. Implementing construction Lessons Learned.

5. Responsible for execution of work in accordance with quality standards and required specifications for the project.

6. Outlined manual staffing requirements.

7. Executing established area operational plans.

8. Formulating schedules and supervised subcontractors.

9. Designing Field Material Requisitions.

10. Over seeing system fabrications, installations and layouts for specifications.

11. Continuous project inspection and monitoring of progress.

12. Creating and implementing daily Plan of the Days for crew to follow.

13. Coordinating to all projects sub-contractors.

14. Material take -off and consumables on all projects.

PRE-COMMISSIONING ACTIVITIES:

1. Hydro test of pipeline and leakage test of pipelines

2. Flushing & Cleaning of pipelines.

3. For System Dry-out and inerting

4. Systematic Conformity check of equipment's.

5. And Static, DE-Energized test of equipment's.

STANDARD PROCEDURES FOR START UP

TESTING and COMMISSIONING ACTIVITIES:

FOR ROTATING & STATIC EQUIPMENT:

1. Responsible for testing equipment, facilities and plants to ensure they Are functioning correctly, produce the

expected results and meet the client’s requirement and specifications.

2. Typically heavily involved in the final stages of a project as they are responsible for the installation and

commission of a system or product.

3. Identifying problems with systems or products.

4. Produce test and commissioning documentation.

5. Producing details commissioning programmers.

6. Advise on testing commissioning procedures.

7. Monitoring progress and analyzing test results.

8. Overseeing and managing teams of technicians and ensuring they are in

Line with all health and safety regulations.

9. Meeting with clients to discuss products.

From to position company

Mar. 05, 2011- Feb. 07, 2012 Mechanical/Field Engineer Makati Dev’t Corp.

Ground Floor, Bonifacio

Technology Center 31st St. Cor. 2nd

Ave.,Bonifacio,Global City,Taguig

1634 Metro Manila, Philippines

(HIGH RISE BUILDING)

DUTIES & RESPONSIBILITIES:

MEP ESTIMATOR:

* Identifying the scope of work, program functions, owner requirements and

Any implied information that affects the project

* Establishing a project's cost before any graphical representation of a facility

Has been developed

* Preparing detailed take-off of materials and labor estimates, including

Research of current trends

* Tracking all market conditions

* Developing and maintaining MEP estimating database line items, unit costs,

And systems

* Reviewing drawings for construct ability issues, value engineering, scope

Definition and completeness, and dimensional issues

* Following trends in subcontract and material and labor pricing

* Producing construction budgets, change orders, and construction costing Information

* Preparing construction document estimates.

MEP (DURING CONSTRUCTION in SITE):

1. Plumbing and Fire Protection Coordinator Engineer

2. HVAC, Installation Engineer for District cooling system.

3. Quantity Surveyor Engineer in mechanical works.

4. Analyzes data such as customer proposal specification and manual to determined and

the feasibility of the design.

5. Directs fabrication and installation activities to ensure product conform to

Designed and specification of the customer.

6. Ensures the implementation of quality plans and objectives of the department and project.

7. Ensures the compliance of all requirements prior to the work execution of Any scope of works.

8. Coordinates all operation maintenance and repair activities to obtain optimum utilization.

9. Supervises all works of sub-contractors and other related activities to ensure quality.

10. Performs tasks in accordance with the process defined in the company QEHSMS Manual.

11. In charges and supervising mechanical and electro-mechanical product and systems.

12. Assists in the preparation of Project Monthly Status Report.

13. Ability to work in a multi-disciplined team, including non-engineers.

14. Ensures proper compliance under the given specification especially in Mechanical works.

15. Prepares the reports to update his/her supervisor and all sub-contractors

regarding accomplishments and work status.

FOR COMMISSIONING & START -UP PREPARATION:

TO TAKE THE FOLLOWING APPROACH:

1.To meet with client to determine specific needs & concerns.

2.To create a customized checklist based on the client's needs.

3. To assemble all information collected during the project's planning, design and construction.

4. Collecting project data from the Intelligent P&ID design database into the appropriate areas:

5. In Equipment, Piping, valves and Instrumentation activities.

From To Position Company

Sept. 28, 2008 Sept. 28, 2010 Mechanical Engineer (MODA) Ministry of defense &

Aviation, Engineering and Housing Directorate Royal Saudi Air Defense Forces, SHAROURAH, Saudi Arabia

SOLDIER CAMP WITH 50 HECTARES LAND AREA (MILITARY CITY)

(OPERATION, MAINTENANCE & DESIGN ADDITIONAL FACILITIES FOR DEVELOPMENT OF ADDITIONAL IMPROVEMENT)

DUTIES & RESPONSIBILITIES:

Reviewing the SOW to assess tender suitability, resource requirements, budget / quantity estimation, risks and special conditions and prepare an executive summary.

Identifying the most competitive options relating to cost whilst satisfying the requirement / expectations of client.

Liaise with and prepare value engineering, alternatives and proposals for client without sacrificing quality.

Collecting all information and compile high quality proposal / tender documents for submission to client.

Liaise with clients with change order estimating as required by jobs in progress and gain approvals.

Maintaining and update statistics, norms, methods and data, providing a comprehensive / reliable source of information.

Value analysis of documentation and prepare budget comparisons between current and previous estimates.

Responsible for generating competitive target cost for new and existing contracts.

Comply with all company QHSE, policies practices and procedures.

Contributing to the team ethic and perform other reasonable duties as required in support of the business.

DURING CONSTRUCTION

DUTIES & RESPONSIBILITIES:

1. Preparing all over schemes such as sewer improvements, water network,

Fire protection, piping, plumbing, HVAC and all related mechanical works-

The scale of design may range from an initial outline to a full detailed design.

2. To perform engineering duties in prevention, control and remediation of

Environmental hazards using various engineering disciplines.

3. Preparing the tender documents as a basis for construction of projects.

4. Monitoring the progress of project from beginning to end, from feasibility

Stage to design through construction and handover.

5. Controlling that the budget at project level.

6. Preparing power tools, generators and other machinery while maintaining Quality standards and regular test runs.

7. Performing, piping lay-outs, pipe routings and other related works

Through knowledge of ASME, API, ANSI Codes and Standards.

8. Preparing deliverables list and engineering man-hour estimates.

9. Preparing plans, estimates & bill of materials in irrigation system in SHAROURAH, Military City K. S. A.

10. Preparations of estimates for mechanical engineering works.

11. Experience of working with minimal supervision or as part of a small team in analyzing mechanical failures.

12. Knowledge of considering time constraints like safety, cost and Environment issues.

13. Computing the horsepower rating of multi-stage centrifugal pump & Booster pump to be use on the project.

14. Computing the fuel consumption in each caterpillar engines in the Generator and dimension of fuel tank to be

used in each engine.

15. Computing the horsepower power rating & TONS OF REFRIGERATION on Each building use for package type,

centralize air conditioning unit & Desert cooler for the workshop area to be used.

MECHANICAL EQUIPMENTS.

CHECK and INSPECTION:

1. Checking the Mechanical Equipment and material accordance with the drawings and specifications.

2. To conduct inspection for all mechanical rotating equipment such as equipment installation and material receiving.

3. To conduct Pre and final alignment of pumps compressor and piping lines connected to the equipment.

4. To conduct inspection & test plant(ITP) for site inspection.

5. Monitoring quality control for each definable area/section of work.

6. Checking for the correct leveling of sole plates and base plates.

7. Checking for anchor bolts elevation and location.

8. Checking for the correct orientation and leveling of equipment.

9. To Conduct final inspection of the turning device shaft alignment with the constructor

representative and final inspection of the mechanical equipment's prior to grouting works.

10. Check for pipe stress prior to final alignment on centrifugal pump.

11. Check/inspect the final alignment of rotating and static equipment according to them

levelness and elevation to ensure that the deficiencies are within acceptable limit.

12. Checking if satisfactory completed.

AFTER FINISHED CONSTRUCTION I PERFORM TESTING and COMMISSIONING THIS PROJECT:

MECHANICAL WORKS TESTING and COMMISSIONG:

THE FOLLOWING;

A) HVAC (HEATING VENTILATION AIR CONDITIONING)

B) PLUMBING

C) FIRE PROTECTING SYSTEM

D) SEWAGE PUMPS and MOTOR in 5 Lifting Station.

From To Position Company

March 16, 2008 –Aug. 31, 2008 Boiler Tender / Davao Central Chemical Corp.

Dryer Tender Km.19, TIBUNGCO, DAVAO,

CITY, Philippines

INDUSTRIAL PLANT: (OPERATION and MAINTENANCE)

TESTING and COMMISSIONING

THIS INDUSTRIAL PLANT WILL YEARLY SHUTDOWN FOR OVERHAULING W/IN 2 MONTHS PERIOD LAST MARCH 15 2008 up to MAY 30 2008 STARTING MY WORKING SCHEDULE, I’M PERFORM FOR THE TESTING and COMMISSION DURING MY WORKING PERIOD BEFORE I LEFT and go to SAUDI ARABIA.

DURING START-UP FOR CONTINUED DAILY OPERATION

PERIOD FOR THE MANUFACTURING OF THE FINISHED

PRODUCT (WITHIN 1 YEAR PERIOD).

DUTIES & RESPONSIBILITIES:

1. To control the boiler either manual or automatic devices which maintain the pressure of the boiler, by the use of

centrifugal fan damper opening, which maintain the desire boiler operating conditions with respect to?

variables such as feed water, flow firing rate and stream temperature.

2. To maintain the boiler feed water up to zero parts per million (ppm) by softening the raw water condition by using

brine salt instead of HCL chemical.

3. By mixing the chemical together with Kalgan chemical, curing power chemical and oxynion chemical every first

shift of a day.

4. To blow down the boiler every one hour by using blow down valve, to

minimize the parts per million (ppm) of softened water when get inside to the boiler.

5. Also that the impurities settled in the mud drum are removed sometimes called “blow off valve”.

6. To soot blow the boiler every hour to allow the ash remove to the boiler tubeand drum, and vent to the atmosphere.

7. To soot blow, so that which uses steam or compressed air to remove the soot

that has accumulated in the boiler tubes and drums.

(ROTARY DRYER) dryer 101 & dryer 01 (ROTATING AND STATIC)

1. To control the temperature of the dryer by the use of inlet damper opening

And outlet damper opening or else by adding or subtracting the converter Load of the dryer.

2. In terms of production we maintain the temperature of dryer 101 to 1700C- 1900C and 1500C-1700C of dryer 1

together with the product ORDINARY GRANULES MATERIALS, Intermediately products and activated carbon

products.

3. We can monitor also the temperature of rotary dryer by using of thermo-couple in inlet damper and outlet damper.

COMMISSIONING ACTIVITIES:

1. Perform Preliminary Check

2. The Functional check

3. The Operational Check

4. And Pre-start up Activities.

I PERFORM TESTING and COMMISSIONING

THE FOLLOWING(STATIC EQUIPMENTS)

1-unit Fire tube boiler 8 bars working pressure.

5 unit’s Rotary dyer

2 units’ 101 and 102 Finished Granules Product COAL ROTARY DYER

3 units’ 01, 02 and 03 ordinary Granules material COAL ROTARY DYER

From To Position Company

Oct. 15, 2002–July 8, 2006 Project Engr. / J.J SUERTO Architect & Partner

Project Inspector MARANDING, LALA, LANAO

DEL NORTE, Philippines.

DUTIES & RESPONSIBILITIES:

1. Supervisor in building const., activities plan making supervise by ARCH. JOEL A. SUERTO, 8th place Architectural

Board Examination last June 1998.

2. Estimator in vertical & horizontal construction in civil works, in charge also in structural supervisor.

3. Ensuring that all assigned work is completed on time, that all engineering activities are correctly coasted and the

complete design is delivered within the agreed budget.

4. Setting out projects works in accordance with the Drawings & specification.

5. Applying personal technical knowledge and experience to the development and delivery of technical report going

the right specification of the plan.

6. Knowledge of contract technical specification and their implementation.

7. Maintenance of daily records.

8. Supporting any procurement processes.

9. Assessing the environmental impact and risks connected to the projects.

10. Monitoring environmental protection measures &



Contact this candidate