Post Job Free

Resume

Sign in

Manager Power Plant

Location:
Dyersburg, TN
Posted:
February 05, 2019

Contact this candidate

Resume:

Tim Camaso

*** ****** **. *********, ** ***** / 731-***-****

ac8eds@r.postjobfree.com

SUMMARY Working third party as safety director.

Working shut downs as safety director.

Working providing a safety director in the field with regular craft employees.

Working to make sure employees were following all safety procedures.

Professional with over 25 years experience as a Safety Supervisor, Project Manager, Safety Trainer, Crane Operator, etc.

Experience evolved from hands-on and supervisory roles within various functions including: scaffolding, rigging, ironwork, crane operation and extensive construction skills. Have worked on many High Rise Commercial building projects. I have experience in writing different types of work permits, and using different types of multigas meters .

CERTIFICATIONS

NCCER # 5810562 with over 75 hours of OSHA classroom hours

Certification in safety, supervision, iron work, mobile crane, welding and rigging.

Apprenticeship through Iron Workers local 167 out of Memphis, TN Union

Kansas City Metropolitan College - Kansas City, MO. OSHA 510,500

TWIC card # C0065576 OSHA 500 and OSHA 510 certifications

Employment Sept.2016 to Present

Qualsafe Services-Turnaround-Exxon Refinery Billings, Montana HSE Manager

Performance Contractors-Turnaround-Valero Refinery Ardmore, Oklahoma HSE Manager

Pic Group LLC-. New Construction- Power Plant Project Ponca City Oklahoma Owners Rep. Safety Manager

SafeT Pros- New Construction GSK Pharmaceutical Plant Rockville Md. Owners Rep. Safety Manager

SystemOne- New Construction-IPL Power Plant Combined Cycle Martinsville, In. Owners Rep. Safety Manager

FDR Safety – New Construction- Steel Mill Osceola, Ar. Owners Rep. Safety Manager

Intact Safety – New Construction- GM Plant New Paint Shop - Flint, Mi.-Construction on Ford Motor Company Transmission Assembly Plant Cincinnati Ohio Owners Rep. Safety Manager

All these projects listed were all New Construction projects. I worked as a safety manage representing the owners. My primary job was to work with the contractors HSE personal to make sure that all parties were following OSHA guidelines and providing a safe work place for craft workers. Part of my responsibilities were to preform audits daily and weekly. Making sure that all contracts are doing their part in keeping records of all incidents, accidents. Audits on JSA’s and helping to improve the jobsites. Making sure that all contractor was follow the safety guidelines per the contract. Attending all safety meeting, and give my reports, and audits to contractor HSE Mangers . Turning in audits to the owners.

Fluor

March 2016 to August

– CPC Hem Lay Down Yard

Ironwork Foreman March 2016 to August

Supervise iron workers in preventive and corrective maintenance and capital project construction and repair of steel, erecting iron, and structural ironwork.

Planning, scheduling, assigning and coordinating daily work with engineers, other crafts and safety agencies.

Justifying Personnel and equipment.

Inspecting work in progress and work completed for conformance to instructions; and ensuring that work crews adhere safety standards and to OSHA regulations.

SIMMCO – Brownsville, TN March 2014 to Jan. 2016

Safety Manager

Planning daily task for safety department and safety directors.

Coordinating with project managers and other supervisors on daily task for jobs at hand.

Coordinating with General Contractor planning for our employees’ safety on job sight.

Coordinating safety training for all new hires

Safety Planning Plus - South Heaven, MS March 2013 to March 2014

Safety Director / Trainer

Working third party as safety director.

Working shut downs as safety director.

Working providing a safety director in the field with regular craft employees.

Working to make sure employees were following all safety procedures.

Still Contractors - Dyersburg, TN Nov. 2012 to July 2013

Project Manager

Planning, scheduling, assigning and coordinating daily work with engineers, other crafts and safety agencies.

Inspecting work in progress and work completed for conformance to instructions; and ensuring that work crews adhere safety standards and to OSHA regulations

Supervise iron workers in preventive and corrective maintenance and capital project construction and repair of steel, erecting iron and structural ironwork.

Justifying Personnel and equipment.

Zachry Construction – Harrodsburg, KY Aug. 2012 to Oct. 2012

Ironwork Foreman

Supervise iron workers in preventive and corrective maintenance and capital project construction and repair of steel, erecting iron, and structural ironwork.

Planning, scheduling, assigning and coordinating daily work with engineers, other crafts and safety agencies.

Justifying Personnel and equipment.

Inspecting work in progress and work completed for conformance to instructions; and ensuring that work crews adhere safety standards and to OSHA regulations.

Systems Contracting - Blytheville, AR Feb. 2011 to April 2012

Safety Director / Supervisor

Meet department’s safety regulations such as electrical-proper grounding, lock & tag and GFCI, proper personal protective equipment (PPE), oversee safety planning and coordinate project planning of fabrications and welding procedures.

Completed extensive training in flammables/combustibles (fire extinguishers, welding and cutting equipment) as well as specialized training in multiple areas including tools, electrical and heavy equipment.

Fabricated and installed fully planked guardrails, tools, hardware and materials.

Inspecting work in progress and work completed for conformance to instructions; and ensuring that work crews adhere safety standards and to OSHA regulations

Commended for excellent routine skills on performance reviews.

Resource Tek – Blytheville, AR Oct. 2009 to April 2010

(Nashville firm-placement of highly skilled engineering)

Safety Supervisor

Meet department’s safety regulations such as electrical-proper grounding, lock & tag and GFCI, proper personal protective equipment (PPE), oversee safety planning and coordinate project planning of fabrications and welding procedures.

Completed extensive training in flammables/combustibles (fire extinguishers, welding and cutting equipment) as well as specialized training in multiple areas including tools, electrical and heavy equipment.

Fabricated and installed fully planked guardrails, tools, hardware and materials.

Inspecting work in progress and work completed for conformance to instructions; and ensuring that work crews adhere safety standards and to OSHA regulations

Commended for excellent routine skills on performance reviews.

Ford Construction – Dyersburg, TN Aug. 2009 to Oct. 2009

Crane Operator

Responsible for unloading metal coils from flatbed trucks using overhead cranes and forklifts.

Rigging attachments/directing critical lifts

Crane signals, cable wire and rope slicing and rigging techniques

Inspection of rigging and load before hoisting

Shaw Group Inc. – St. Paul, VA May 2009 to Aug. 2009

Raising Gang Supervisor

Hands-on experience in the varied functions of supervising a typical raising gang.

Designed and fabricated the practice frame, created drawings and prepared the site.

Set structural steel for buildings

Assembling cranes.

Loaded and unloaded trucks, shacking out, hooking on and erecting steel.

Zachry Construction Inc. - Osceola, AR March 2008 to May 2009

Supervisor

Supervise iron works in preventive and corrective maintenance and capital project construction and repair of steel, erecting iron and structural ironwork.

Planning, scheduling, assigning and coordinating daily work with engineers, other crafts and safety agencies.

Justifying Personnel and equipment.

Inspecting work in progress and work completed for conformance to instructions; and ensuring that work crews adhere safety standards and to OSHA regulations

Camco Construction – Dyersburg, TN Jan. 2006 to March 2008

(Residential construction and remodelling)

Owner/Operator

Accepted and determined bids for repairing, remodeling altering, converting, modernizing of or adding to residential property. This includes, but is not limited to: the construction, erection, replacement, or improvement of driveways, swimming pool, siding, insulation, roofing, windows, terraces, patios, landscaping, fences, porches, garages, solar energy systems, flooring, basements and other improvements of the residential property and all structures or land adjacent to it.

Successful completion of 200+ home remodeling projects (budgets up to $150K).

Projects ranged from installing simple fixtures to doubling the square footage of a home.

Earned a reputation as a trusted and well-respected home remodeling company and small business owner with the tri-city communities of Northwestern TN and the surrounding states.

Installations of burglar alarms, texture coating, fencing, air conditioning, heating equipment, and any other goods which are to be affixed to real property.

Roberson Construction – Perryville, MO Feb. 2003 to Dec. 2005

Supervisor

Supervises iron workers in preventive and corrective maintenance and capital project construction and repair of steel, erecting iron, and structural ironwork.

Planning, scheduling, assigning and coordinating daily work with engineers, other crafts and safety agencies.

Justifying Personnel and equipment.

Inspecting work in progress and work completed for conformance to instructions; and ensuring that work crews adhere safety standards and to OSHA regulations.

FRU-CON PAPA - Cape Girardeau, MO Jan. 1999 to Dec. 2001

Supervisor

Manage overseeing of ironwork, ironworker’s job performance and standard work, erecting and removal of all specified areas including but not limited to those directed by the General Supervisor. Preventive and corrective maintenance and capital project construction and repair of specified steel structures.

Planning, scheduling, assigning and coordinating daily work with engineers, other crafts and safety agencies.

Justifying Personnel and equipment.

Inspecting work in progress and work completed for conformance to instructions; and ensuring that work crews adhere safety standards and to OSHA regulations

FRU-CON PAPA - Jackson, TN Jan. 1996 to Dec. 1998

Scaffold Foreman

Ensure that all safety programs, policies and procedures are being adhered to. Study specifications to plan procedures for construction on basis of starting and completion times and staffing requirements for each phase of construction. Inspect work in progress to ensure that workmanship conforms to specification and the adherence to construction schedules. Oversee construction crews and help with construction if necessary.

Confers with and directs construction personnel in the execution of construction, procedures interpreting specifications and coordinating various phases of construction.

Prepare or review reports on progress, materials used, and costs and adjust work schedules as indicated by reports.

Collaborated with Human Resources and Management in the recruiting, interviewing and hiring of construction personnel.

Wade Jackson Remodelling - Dyersburg, TN March 1992 to Jan. 1996

(Residential construction and remodelling)

Carpenter Foreman

Assist owner with residential remodeling projects, including carpentry, roofing, plumbing, masonry and tile work. Ensure optimal work quality and customer service.

Assisted in the completion of 250+ home remodeling projects (budgets up to $150K) Projects ranged from installing simple fixtures to doubling the square footage of a home.

Gained practical, hands-on-knowledge of all aspects of home construction and remodeling



Contact this candidate