Resume

Sign in

Project Engineer

Location:
India
Posted:
April 27, 2019

Contact this candidate

Resume:

CURRICULUM VITAE

SYNOPSIS

Name

ANIRUDDHA DAS

Total Experience

15+Years in Electrical Project (Infra(MEP),Plant & Power).

Present Designation

Senior ElectricalEngineer(MEP)

Present Company

Samsung C&T(India)PvtLtd.

Present Project

Dhirubhai Ambani International Convention & Exhibition Centre (DAICEC)Project,Mumbai,India.

E-Mail ID :

ac874z@r.postjobfree.com

Contact No :

+912*******/+919*********

Career Objective :

Looking for mid-senior level assignment in an organization which will provide me a platform to apply my knowledge and skills as a professional with exposure to various scenarios.

Key Strength:

●Engineering Installation. ●Project Management Skill.

●Engineering Consultancy. ●Balanced Leadership.

●Strategic Workflow of Project. ●Fluency in Communication

●System Testing(Static & Dynamic). ●Quick Learner.

●System Comissioning(Functional & Operational). ●Team Leader.

●System Integration & Troubleshooting. ●Customer focused.

●System HOTO/Operation. ●Quality Consciousness.

Educational Details:

Description of Examination

Board/University

Year

Grade

B.E IN ELECTRICAL ENGINEERING

NORTH BENGAL UNIVERSITY

2003

1ST

HIGHER SECONDARY

W.B.B.H.S.E

1997

1ST

SECONDARY

W.B.B.S.E

1995

1ST

Internal Training

International standard

●PDU Training on Conceptual PMP( For Managing Project Effectively,PMBOK Guide,Sixth Edition).

●IEC

● Advanced Communication & Presentation Skill.

●ISO

● Global Quality Management Training.

●BIM & LEED.

●Project Oriented QA/QC Training.

●Installation Standard(e.g-NFPA,NBC,ASME)

●Cross Cultural Training/Global HSE Training.

●Company Standard :SAMSUNG C&T, RIL,TSL,ABB,SIEMENS,NHPC,PGCIL,DASTUR.

Management Skill :

Project Management/Engineering Management.

Team Management,Planning & Monitoring Management.

Engineering,Procurement &Connstruction(EPC)Management.

Follow up,Documentation & Reporting.

Testing & Commissioning/ Integration / Management.

System Hand Over-Take Over (HOTO)to Facility Management.

Computer Proficiency :

Operating System : Windows XP,Windows7.

Tools : MS Office,MS Project 2007, AutoCad-2012.

Documentation Knowledge System Knowledge

GA-Layout,Shop & CSD Drawings. Power Flow Network.

System Architecture Diagram. GIS Switchgear Panel.

Block Diagram. High Voltage(33 KV/11 KV)System.

GA Drawing. Building Power Distribution System

Looping/Wiring/ Interconnection Diagram Disel Generator Distribution System

System/Functional Design Specification Building Lighting Distribution System

Cable Trunching &Termination Schedule. Building Earthing Distribution System.

Schedule of Quantity/Equipment Layout. Uninterrutible Power Supply.

Method Statement/Benchmark Statement. Automatic Power-Factor Correction.

Inspection & Test Plan. Rural Power Distribution System

Installation & Operation Manuals. Raw Material Conveying System

Project Planning,Tracking &racking Report Building HVAC System(Conceptual)

FAT/SAT Procedure. Building Fire Fighting System(Conceptual)

Site Mock-Up,T&C MOM,Report. Building Plumbing System(Conceptual)

PROFESSIONAL EXPERIENCE

Present Company

Samsung C&T(India) PVT LTD.

Division

MEP.

Duration :

From Sept 2017-Present.

Designation

Senior Electrical Engineer(MEP).

Roles & Responsibilities :

●Engineering Design Review and Clearance.

●Planning,Scheduling & Reporting of System Testing & Commissioning.

●Reviewing & Approval of T&C Method Statements,ITP’S,Benchmarking Procedures.

●Reviewing, Approval & Reporting of T&C template,test result,checklist.

●Conducting for T&C mock-up process,site-meeting & weekly progress meeting.

●Witnessing of FAT,SAT,WIR.

●Identify way forward the logic in system technically for Testing & Commissioning.

●Consultant & Sub-Contractor Management.

●Inter Discipline Co-Ordination for ongoing Project.

●Ensure timely Completion of ongoing Project Work.

●Ensure Safety & Quality aspects of the onsite Project work.

Project Details :

Name : :Dhirubhai Ambani International Convention & Exhibition Centre

(DAICEC)Project.

Location :BKC,Mumbai,India.

Description :One of the Biggest Infrusructure Project being executed in India. under the leadership of Samsung C&T as Principle Contractor for Reliance Industries Ltd.A Hybrid Complex Building comprises of Exhibition Centres,Theatres,Commercial Complex and Residential Complex of Current Plan of 21 Storyed with around 33 MW Simultaneous Electrical System Loads and 5 Nos 33KV HT Connections, (18x2.5MVA +5x1.6 MVA)TR,7x2 MVA DG,UPS,APFC Panel as major electrical equipments,about 250 Electrical Rooms for Power Integrity of total Building Services.

Customer :Reliance Industries Limited.

PREVIOUS ASSIGNMENTS

Company

Civil Engineers Enterprises Pvt Ltd.

Division

MEP.

Duration :

From Feb 2016 to Aug 2017.

Designation

Manager(Electrical).

Roles & Responsibilities :

●Engineering Design Review and Site-Clearance for Project activities.

●Planning,Resolving of Technical issues & controlling of Project.

●Project status monitoring,tracking of progress & reporting documentation.

●Design,Inter Discipline,Vendor & Customer Co-Ordination for ongoing Project.

●Site-meeting with Sub-Contractors,Client,& Inter-Discipline Personnels.

●Invoicing for RA Bills for executed works.

●Certification of Sub-Contractors & Material Vendor’s RA Bill.

●Raising for Inventory &Control with Documentation.

●Ensure timely Completion of ongoing Projecreportingt Work.

●Ensure Safety & Quality aspects of the onsite Project work.

Project Details :

Name : :NEW SECRETARIAT COMPLEX AT TASHILING,GANGTOK,SIKIM-PH-I.

Location :Sikkim,Gangtok,India.

Description :One of the Prestigious Infrusructure Project for Sikkim Government.

under the leadership of CEEPL as Principle Contractor amidst the Critical Geometrical

& Climatic Condition .It is a priority office with plan of 7 Storyed X 2 Block(A & B).

Customer :SIKIM STATE GOVERNMENT.

Company

M.N.DASTUR & COMPANY(P)Ltd.

Division

Project Engineering & Consultancy

Duration :

From Nov2011 to Jan 2016.

Designation

Senior Engineer.

Roles & Responsibilities :

●Consultation for Execution,Testing,Commissioning of System as per Protocols.

●Daily Work Planning, work permit Issue,Progress Tracking,Resolving Technical issues,

Documentation for Project.

●Checking of QAP,FQP,SWP,Joint-Measurement,RA-Bill Certification.

●Co-Ordination with Client/Design & Quality Team regarding any site-issues.

Project Details :

Name :3 MTPA NEW STEEL PLANT PROJECT(PH-1)OF TATA STEEL ODISHA.

Location :TATA STEEL,KALINGANAGAR,ODISHA.

Description :One of the Challenging Greenfield Constructed Steel Plant Project as

per International Standard of TATA STEEL Odisha under the leadership in Consultancy (From Concept to Completion)in Raw Material Handling System with Total Process Flow Integration through different Automated Equipments & Conveying-System.

Customer : Tata Steel Limited.

Roles & Responsibilities :

●Daily Work Planning Consultation,Progress Tracking, Project Documentation,Checking of QAP,FQP,SWP; joint measurement,certification of RA bill.

●Coordination with Client/Design & Quality teams for any issue at site.

●Planning,Scheduling,Progress Tracking,Resolving Technical issues,Electrical Documentation & reporting for the ongoing Project.

●Joint-Measurement,RA-Bill Certification.

●Site-Activity, Site Management Sub-Contractor &.Inter-disciplinary Co-Ordination.

Name : :6.3 MTPA STEEL PLANT EXPANSION PROJECT OF RINL.

Location :Vishakapatnam,Andhra-Pradesh.

Description :A Challenging Project for Expansion of Steel Plant in existing system

with International Standard for RINL in Vishakapatnam as Principle Consultant

in Raw Material Handling Plant consisting of Total Process Flow Integration through different Automated Equipments & Conveying-System.

Customer :RINL(Rashtriya Ispat Nigam Limited).

Company

KEC INTERNATIONAL LIMITED.

Division

Project Engineering.

Duration :

From June 2009 to OCT 2011.

Designation

Project Co-Ordinator & Senior Field Engineer

Roles & Responsibilities :

●Daily Work Planning,Progress Tracking, Project Documentation

●Follow up with material Vendors and Inventory Control.

●Coordination with Client,Design group for any issue at site.

Name :Rural Electrification Project(RGGVY).

Location :Nadia,West Bengal.

Description :Project for expedite the Creation of backbone of Rural Power Distribution System in existing infrustructure as Principle EPC Contrator for the Central RGGVY Scheme

Customer :WESEDCL.

Company

ABB LIMITED.

Division

Project Engineering.

Duration :

From July 2006 to May 2009.

Designation

Planning Engineer & Project Co-Ordinator.

Roles & Responsibilities :

●Assistance to Project Manager for Material Flow at Site.

●Estimating for finalizing the materials for Project Execution;

●Overall Project Documentation activities.

Name :Rural Electrification Project(RGGVY).

Location :Balasore,Odisha.

Description :Project for expedite the Creation of backbone of Rural Power

Distribution System in existing infrustructure as Principle EPC Contrator for the Central RGGVY Scheme.

Customer :Power Grid Corporation of India Ltd (PGCIL).

Roles & Responsibilities :

●Project Execution,Documentation of Work-Progress activity,

●Co-Ordination with client and Agency.

●Inventory Control,Quality & Safety meet up at site.

●Responsible for Commissioning of the System.

Name :Rural Electrification Project(Package-II,Phase-II,RGGVY).

Location :Purulia,West Bengal.

Description :Project for expedite the Creation of backbone of Rural Power Distribution

System in existing infrustructure as Principle EPC Contrator for the Central RGGVY Scheme

Customer :NHPC Ltd.

Company

M/s. Utechtic Engineering Pvt Ltd

Division

Project Engineering.

Duration :

From July 2003 to June 2006.

Designation

Asst Design & Execution Engineer

Roles & Responsibilities :

●Asst for System-Design, S.L.D, GA,Schematic,Load Details & System Equipment Drawing.

●Installation,Equipment-testing and Commissioning of the System.

●Co-Ordination with client/Executing-Agency,Invoicing for Client & sub-Contractor.

●Inventory Control,Progress Documentation.

●Responsible for Commissioning of the System.

Name :Lighting Distribution Project.

Location :West Bokaro,Jharkhand.

Description :Project for expedite the Creation of backbone of the Lighting

Distribution System as Principle EPC Contrator

Customer :TISCO Ltd.

PERSONAL PROFILE

Date of Birth :30th April 1979

Present Adress : Rudra Ansh Apartment,Flat No-305, Sector-48,Seawood,Nerul,

Navi Mumbai,400706.

Permanent Adress :Vill+P.O-Kharar,Dist-Midnapore(West).West Bengal,India.Pin-721222.

Passport No :M2943837(From 19/10/2014 to 19/10/2024).

Date :

Place :

(Signature)



Contact this candidate