Post Job Free
Sign in

Engineer Electrical

Location:
Duluth, GA
Salary:
75K$/80K$
Posted:
April 09, 2019

Contact this candidate

Resume:

Guillermo Carta

**** **** ****** *******, ******, GA 30096

phone: +1 (754) 715- 9967

EMAIL: **************@*****.***

PERSONAL DETAILS

Names and Surnames: Guillermo Jesus Carta Mendoza

Nationality : Venezuelan

Pasport N : 129742746

Marital Status: Married

Age: 43 Y/O

Birth place and Date: Maracay, 12/14/ 1975

ACADEMIC QUALIFICATIONS

Higher Education

Bicentennial University of Aragua, 1993-1999, San Joaquin de Turmero Aragua State

Obtained Degree: Electrical Engineer

Academic Position: 8 of 26

Post-graduate Degree in Management Specialized in Marketing Service, Degree obtained in the University Simón Bolívar.

Labor Experience

1998 ELECENTRO C.A, subsidiary of CADAFE, Position held: Intern, Department of Location Measurement Coordination, Work performed: Study of Energy Saving in the Measurement Modules of the Urbanization Caña de Azucar and Dimensioning Study of the Transformation Cabin.

1999 ELECENTRO C.A, subsidiary of CADAFE, Position held: Engineering Trainee, Department of Location Measurement Coordination, Work performed: Proposal of a pilot system for the compilation of the electrical parameters of the substations located in ELECENTRO C.A., Maracay, Aragua State.

2000 (January-April) DeBarr C.A, Contractor Company of ELECENTRO C.A., Subsidiary of CADAFE, Position held: Field Engineer, Work performed: Updates to distribution circuits at 13.8 kV of the Substations San Juan and Morita, updates for the control systems, protections, measurement and technical audit in the yard of 115 Kv.

2000-2001 ELECENTRO C.A, CADAFE, Position held: Chief of District Zaraza, dependent on the Distribution-Coordination Management of Distribution Guarico, Work performed: See tips of the position responsibility. 2001-2002 ELECENTRO C.A, subsidiary of CADAFE, Position held: Chief of District Cagua dependent on the Distribution-Coordination Management of Distribution Aragua, Work performed: See tips of the position responsibility. 2002 –2004 ELECENTRO C.A, subsidiary of CADAFE, Position held: Chief of District Calabozo dependent on the Distribution-Coordination Management of Distribution Guárico, Work performed: See tips of the position responsibility.

2004 (January-May) ELECENTRO C.A, subsidiary of CADAFE, Position held: Coordinator of Distribution Apure dependent on the Operation Distribution- Direction Management, Work performed: See tips of the position responsibility.

2004 -2006 ELECENTRO C.A, subsidiary of CADAFE, Position held: Manager of Distribution dependent on the Direction of Operations, Work performed: See tips of the position responsibility. (Since May 2004 until October 2006) 2006 - 2007 CADAFE, Position held: Chief of Network Control, Management and Operations Group, ascribed to the Operations Direction. Work performed: See tips of the position responsibility.

2007 – 2008 CADAFE, Position held: Coordination of Measurement Aragua Work performed: See tips of the position responsibility. 2008 - 2009(February) Pequiven S.A, Position held: Specialist Engineer, ascribed to the Management of Engineering and Specialties of the Corporative Management of Engineering and Costs Estimations. Work performed: See tips of the position responsibility.

2009 – 2014 (March) Pequiven S.A, Position held: Coordinator of the Electrical Area, ascribed to the Management of Engineering and Specialties of the Corporative Management of Engineering and Costs Estimations. Work performed: See tips of the position responsibility. Person in charge of the Management of Engineering and Specialties ascribed to the Corporative Management of Engineering and Costs Estimations of Pequiven Project Directorate due to vacations of the position holder during the terms of August 2010, 2011, 2012. Work performed: See tips of the position responsibility.

2014 (March) Pequiven S.A, Position held: Leader of Electrical Discipline, ascribed to the Engineering and Construction Management of the Project Maritime Terminal Morón in Pequiven C.A. Work performed: See tips of the position responsibility.

2014 (August/September) Pequiven S.A Position held: Person in charge of the Engineering and Construction Management of the Project Maritime Terminal Morón in Pequiven C.A. Work performed: See tips of the position responsibility.

2014 (September) Pequiven Position held: Person in Charge of the Quality Control Management of the Project Maritime Terminal Morón in Pequiven C.A. Work performed: See tips of the position responsibility. 2016 (February/May) Pequiven S.A Position held: Support for Project Management Petrochemical Complex Hugo Chavez concerning 2016 (May/January 2017) Pequiven S.A Position held: Coordination of support and assurance projects, Corporate office Pequiven C.A (Present) Work performed: See tips of the position responsibility. 2017 (January/November) Pequiven S.A Position held: General Project Manager and Project Manager of Maritime Terminal of the Petrochemical Complex Moron, subscribed to executive project management of Pequiven. Work performed: See tips of the position responsibility. 2018(Februry/Currently) HERCAR SSC/M&D ALL SERVICE, Position held: consultant engineer, field Engineer, Support Engineer. Work performed: See tips of the position responsibility.

Skills and Tips of Responsibility in the Positions Held 1. –Electrical Project Designs of High, Medium and Low Distribution and Electrical Conduits (including Substations, Lines and Load centers). 2.-Calculation of electrical parameters such as: demand, short circuit power, and voltage drop.

3.-Coordination of protections and sectioning of distribution networks. Reading operation drawings.

4. - Construction and design standards of CADAFE, National Electrical Code. 5. - CAD handling tools (Autocad, Microstation).

6. - SAP basic knowledge.

Knowledge of Outlook, Word, Excel, PowerPoint, Project, Lulowin, APVWIN. 7.-Field Work (Inspections of structure, civil and electrical systems). 8.-Coordinate and plan the maintenance to provide the service in the attended area: (Zaraza, San José de Unare, San Rafael de Laya, Onoto, Cagua, Turmero, San Mateo, Santa Cruz, Calabozo, San José de Tiznao, San Francisco, Monte Oscuro, Palenque, el Calvario, Camaguán, Cazorla, Unión de Barinas, Guayabal, San Fernando, Achaguas, Elorza, Mantecal, Guasdualito, El Nula) 9. – Undertake the staff payroll control in the district. 10. – Supervise the Operation of the unattended Substations at the Area. 11. – Maintain the continuity of service in the high voltage circuits (at both 13.8 Kv. and 34.5 Kv).

12. – Maintain the public lighting.

13.- Preventive and Corrective Maintenance.

14. – Coordinate the maintenance works with the team of Power Lines for the hot works and thermo vision to circuits.

15.- Coordinate the works and projections of the operational plans at the five areas of influence in the Organization (Apure, Aragua, Guárico, Amazonas, Miranda). 16.- Take over the control and projections of maintenance at low and high voltage to maintain at optimal points the service quality indicators of the Organization. 17.- Carry out the budget administration and execution regarding to service contracting to maintain the electrical networks in optimal conditions. 18- Control the operating expenses of approximately 1000 workers including engineer, technical and worker staff. Similarly manage requests for materials needed for this area.

19.- Take over the control and monitoring of the works to be executed and the process in five states.

20.- Serve as support link in the technical area with the different government agencies, from the Presidency of the Republic Bolivarian of Venezuela, National Assembly, Armed Forces of Venezuela, Governments and Municipalities of the different states, among others.

21.- Control of Management Indicators.

22.- Revision of engineering in the different phases, conceptualize, design and detail, based on national and international standards. 23.-Elaboration of Instruction to Bidder (ITB), preparation of scope for EPC contract

(engineering, procurement and construction).

24.- Validation and engineering scopes at different stages of the different complexes and development projects by the different organizational units assigned to Pequiven.

25.- Follow up the development of the engineering and coordination with international companies regarding to the requirements requested in the scope of works.

26. - Assure the quality control during the development of the projects in different stages or phases, Engineering (conceptual, basic and detail), Procurement, Construction, Pre Start-up and Start-up.

27.- Provide support for Project Management Petrochemical Complex Hugo Chavez regarding the status update and compilation of documentation (Document decision support, Plan Project Implementation, Financial Analysis, Risk Analysis, Analysis of operational risks, alternative for proper preservation) for the application of financial resources in order to give continuity to the project (Benefit phosphate rock, sulfuric acid III, electricity Substation).

28.- Coordinate, monitor and control practices Increase in Value and Knowledge Management Project, according to the methodologies and best national and international practices to achieve efficient projects and durable and functional infrastructure to enable Pequiven focus their efforts on improving continuous process Corporation.

29.- To lead all the activities related to the program of projects that includes all aspects Economic, administrative, technical, construction to carry to happy completion of the projects that conform the program which are: Electrical projects, Sulfuric Acid Plant III, Benefit Project Of fasfastic rock, and Maritime Terminal. All according to best practices for developing projects. 30.- Development of strategies for decision making in the new projects assigned as well as conducting field inspections to develop economic technical proposals which can provide customers with a timely and viable solution obtaining productive profits for the company, additionally provide solutions to the different challenges faced by the company in the market with technically viable solutions Languages

English/Spanish

Licenses and certifications

1. Windows 98-Microsoft Office 97 Operator

2. Instrumental English Course

3. Industrial Safety Conferences

4. PLC Basic Course

5. Inspection techniques for Air Distribution Networks 6. Maintenance techniques Air Distribution Networks 7. Electrical Measurements

8. 8. Electrical Protections (Basic Level)

9. 9. Electrical Protections II (Practice Level).

10. 10. Maintenance techniques for Distribution Power Lines up to 69 Kv Supervisor Level.

11. 11. Substation Automation in Distribution and switchgear retrofit of medium voltage. 12. Modern Analysis and design techniques for Distribution Systems 13. Electrical Distribution Systems Protections

14. First National Meeting of Distributed Energy Generation 15. Construction Works Control with Software Application 16. ETAP operator, software used for design and testing of electrical systems 17. Knowing the Petrochemical Industry

18. Second National Meeting of Distributed Energy Generation 19. Grounding for Petrochemical and Oil Plants

20. IX Congress of Electrical Facilities

21. Certification at the Standard NFPA 70 E “Electrical Safety in Working Areas” 22. Formulation of scope of work, technical specifications and metric calculations in contracts for works and / or services

23. Project Organization and Management

24. Pumping System (FUNINDES-UNIVERSITY SIMON BOLVAR) 25. Nondestructive tests: penetrant liquid test, magnetic particles test. 26. Certificate of approval and English language proficiency SURVIVAL (The Wall Street English)-

27. Project: Definition and Management of Projects / Universidad Central de Venezuela.

28. Training and certification in the use in "Management of Capital Investment Projects GGCPIC-MPIC PDVSA".

29. The Best Practices for Small Projects / IPA.

30. Preparation program for PMI PMP certification.



Contact this candidate