MILIND KUMAR BAWANKAR
Cell: 096********/099******** / E-Mail: ac7o1k@r.postjobfree.com
Seeking challenging assignments in Project Management, Operation & Maintenance and Cost Saving project with an organization of repute
Career Overview
Result oriented professional with nearly 21.5 years in Power Plant Operations, Commissioning and Maintenance of Thermal Power Plant. Work experience in three geographic location (Maharashtra, Chhattisgarh & Madhya Pradesh)
Competencies across:
oProject Management Statutory Compliances Coordination / Liaison
oOperation Maintenance Reporting & Documentation
Demonstrated abilities in working on initiatives, thereby bringing down equipment breakdown & achieving annual costs savings. Improved productivity by technology management.
Skilled at establishing professional credibility in the areas of quality system management.
Possesses good experience on project related jobs and installation and commissioning of equipments including all engineering & other activity. Power User of SAP.
An effective communicator with excellent relationship, management skills and strong analytical, problem solving and organizational abilities.
Core Competencies
Handling project activities, working out various requirements with respect to utilities, instruments, manpower & ensuring timely completion of projects.
Managing resources to perform project activities in a cost effective manner; dealing with consultants/ licensors/ statutory bodies for compliance of requirements.
Efficiently identifying areas of obstruction/breakdowns and taking steps to rectify the equipments through application of trouble shooting tools.
Executing cost saving and energy saving techniques/ measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget.
Leading, mentoring & monitoring the performance of team members to ensure efficiency in process operations and meeting of individual & group targets.
Employment Details
Since June 2012 with Ultra Tech Cement ltd. Vikram cement works, Khor as Sr. Manager (TPP - Operation )
Plant specification
Boiler details – 2x130 TPH Chinese Boiler Make - m/s Zigong Dong Fang.
Turbine – 2x23MW Make – HTC steam Turbine
DM Plant – 2x15m3/hr Chinese make – Shangri Panda Machinery Group
Coal handling plant – 150TPH Make – Shanghi Liancheng co.
Job Roles & Responsibilities
Looking after 2x23 MW power plant operation & maintenance and ensuring smooth plant operations and maintenance.
Accountable for process optimization, maintaining & improving efficiency, profitability of plant with optimization of operating cost.
Implementing:
oWCM activities in plant.
oKAIZEN for better plant performance.
oSAP
oEnforcement all safety standard and procedure.
oStrategy of project and planning
Conducting root cause failure analysis for any break down and tripping.
Imparting training to Engineers & Shop Floor Workers for improving their skills.
Noteworthy Contribution:
Work on various energy saving projects and process optimization for reduction in auxiliary power consumption.
Achieved 7.55% auxiliary power consumption in December month ever lowest in UTCL in all TPP unit.
First time in UTCL wet washing of steam turbine done and save 0.08 kg/kwh steam.
Major overhauling of both steam turbine & its blade replacement.
Boiler water wall tube replacement.
Replacement of both boiler feed pump with high efficiency pump achieved saving 135kw/hr each pump.
Modification in super heater coil supports, which prevent distortion in super heater coil.
Conversation of lime stone unit pneumatic handling system to screw conveying system which saves 25 kw/MT power.
Feb.2008 to June 2012 Ultra Tech Cement ltd, Hirmi cements Works, Hirmi as Manager (TPP – Maintenance)
Plant specification
Boiler details – 2x115 TPH CFBC Boiler Make - m/s Thermax Pune.
Turbine – 2x25MW Make – HTC steam Turbine
DM Plant – 2x15m3/hr Make- Thermax
Coal handling plant – 230TPH Make – Solcon.
Job Roles & Responsibilities
Look after 2x25 MW power plant operation & maintenance after successful erection and commissioning.
Accountable for maintaining & improving efficiency, profitability of plant with optimization of operating cost.
Implementing:
oWCM activities.
oKAIZEN for better plant performance.
oSAP
Conducting root cause failure analysis for any break down and tripping.
Imparting training to Engineers & Shop Floor Workers for improving their skills.
Noteworthy Contribution:
Successfully handled the erection & commissioning 2 x 25 mw power plants.
Implementation of PM SAP module.
Stabilization of plant.
Inspections of turbine stem strainer prevent turbine major break down.
Reduction in auxiliary power consumption.
Work on DuPont safety standard.
March’06-Feb’08 with Jaswal Neco. Ltd. (Power Plant Division), Raipur as Deputy Manager (PP)
Plant specification
Total 53MW Thermal power plant (4 units)
Boiler details 2X33 TPH CVL Make AFBC boilers.
3X30 TPH Thermax makes gas fired Boilers
55 TPH and 33 TPH Thermax Make WHRB Boilers
Turbine 2x15MW Make – Quingdao steam Turbine China
2x7.5MW Make – Kaluga Steam Turbine
2x4MW Make – DLF Steam Turbine
DM Plant 2x15m3/hr Make – Thermax
Coal handling plant 2x60 TPH Make – Globe Coal handling plant
Job Roles & Responsibilities:
Had been responsible for the operation & maintenance of power plant guiding the Shift Operating Personnel through Engineers for better and optimum loading of boilers, turbines and turbo blower.
Was accountable for preparing the weekly, monthly and annuls reports.
Looked into shutdown, overhauling, spare part management and manpower planning activities.
Noteworthy Contribution:
Small and big modification done for improving plant performance.
Smooth plant operation.
Increase in plant capability.
Technology transfers effectuated
May’05-March’06 with Real Ispat and power ltd. Raipur as Deputy Manager (PP)
Plant specification
Total 15MW Thermal power plant
Boiler details 1X35 TPH CVL Make AFBC boilers.
2X11 TPH CVL makes WHRB
Turbine 15MW Make – HTC steam Turbine China
DM Plant 2x10m3/hr Make – Thermax
Coal handling plant 100 TPH Make – Bevcon coal handling plant
Job Roles & Responsibilities:
Erection and commissioning of AFBC and WHRB boiler.
Erection and commissioning HTC make steam turbine.
Erection and commissioning DM plant.
Erection and commissioning coal handling plant.
Noteworthy Contribution:
Successfully handled the erection & commissioning 15 MW power plants.
Plant stabilisation.
Boiler office liaising work.
Apr’97-May’05 with Murli Agro Products Ltd., Wadoda (Power Plant Division), Nagpur as Assistant Manager
(Power Plant)
Plant specification
Boiler details – 85 TPH & 30 TPH Make - CVL AFBC boilers.
Turbine – 15MW & 3MW Make – Triveni steam Turbine
DM Plant – 15m3/hr Make – Thermax
Coal handling plant – 50TPH Make – Bevcon
Job Roles & Responsibilities
Had been responsible for the operation & maintenance of power plant in shift operation.
Better and optimum loading of boilers, turbines
Responsible for plant performance.
Was accountable for preparing the weekly, monthly and annuls reports.
Looked into shutdown, overhauling, spare part management and manpower planning activities.
Noteworthy Contribution:
Successfully handled the erection & commissioning of 3 MW & 15 MW power plants.
Small and big modification done for improving plant performance.
Smooth plant operation.
Increase in plant capability.
Work on energy saving project for reducing auxiliary power consumption
EDUCATION: BE (Mechanical) from Nagpur University in year 1996
PROFESSIONAL QUALIFICATION
Successfully passed the:
oEnergy Manager and Energy Auditor Examination passed from Bureau of Energy Efficiency, Chennai.
o1st Class Boiler Proficiency Engineer Examination passed from Maharashtra State. Certificate No.: 347/2004
PERSONAL DETAILS
Date of Birth: 20th April 1972
Languages Known: English, Marathi and Hindi
Present Address: Quarter No. BF3/4, Ultra Tech Township, Vikram Nager, District - Neemuch, (M.P.)
Present Salary:
Expected Salary:
Place: Signature