Resume

Sign in

Manager Project

Location:
Iron River, Michigan, United States
Posted:
November 11, 2018

Contact this candidate

Resume:

Resume of: Robert L. Pyatt

Iron River, Mi.

C. 706-***-****

ac7nzu@r.postjobfree.com

Operations Manager

Sr. ProjectManager

Sr. Estimator

ConstructionSuperintendent

Contract Administrator

QUALIFICATIONS

Project Manager, projects managed

$2 15M Operations Manager,

manufacturing plants Qualified

Estimator Mechanical Disciplines

Leadership in turnaround situations

Leadership in Production

environment

Quality Assurance and Control Material professional Experienced with "ISO 9002"

Experienced and Knowledgeablewith regards to Installation, Repair, Troubleshootingand Operation of Process Systems, Hydraulic, Pneumatic, Compressed Gas, Steam (Both HP and LP Systems), Pumps, Valves, Associated Equipment/Machinery, Compressors (HP/LP) and Nuclear/Non Nuclear Steam Generation Systems.

Skilled as Fitter (Pipe, Plate, and Structural)

Experienced & Certified Welder (SMAW, GMAW, FCAW and GTAW with Pipe, Plate and Structural) Computer Literate, Microsoft Suite of Products Qualified US Navy

Submarines Navy Nuclear

QA/QC Inspector Small

Arms Range Safety Officer

Proficient with all types

small arms Nuclear

Weapons Armed Security

1

Systems Expert for Hydraulics, Compressed Air Systems and Atmosphere Control Personnel Reliability Program

Other duties, upon request

EXPERIENCE SUMMARY

Project Manager United States Capitol

Operations Manager, Steel/Pipe Fabrication Facility Represent Company while directly interacting with customers, inspectors, shop and field personnel

U.S. Navy Nuclear/Non NuclearRepair

Maintain Repair/MaintenanceLogsandRecords

Served as Repair Dept. Lead Petty Officer

Quality Assurance Manager with 10 15 Inspectors

Extensive Use of Precision Measuring Devices

Use of Blueprints, Tech. Manuals, and Other Applicable Documents Certified Welder

Maintenance Engineer of Leading Chemical

Manufacturer Estimating, Managing and Staffing

Plant Turnarounds Technical advisor

Utility Department Manager [Power House, Aux. Equipment (i.e. Compressors, Waste Water, etc.)] Implementation and Maintenanceof "Preventive/Predictive” Processes Maintenance Program Management

Construction Foreman/Superintendent

Project Manager for Major Time Sensitive Projects

Experience with United States Government FARS and DFARS regulations EMPLOYMENT HISTORY

MilestoneTarant, LLC Miscellaneous and Ornamental Metals 2006 thru current MilestoneTarrant, LLC 9220 Edgeworth Drive Capitol Heights, MD 20743 (Washington, DC) Primary Responsibilities: Operations Manager/Sr. ProjectManager Directly involved in day to day company operations Oversight of all Fabrications/Installations

Review of all estimates, bids, plans, fabrication drawings 2

Represent company while directly interacting with customers, inspectors, shop and field personnel

Implementation of Quality Assurance for all shop fabrications and field installations Senior Project Manager for Capital Visitors Center located at United States Capital, Washington, DC. Total contract value $12 15million dollars

_Limited estimating with regards to new work, job had already been awarded prior _Solely responsible for pricing of extra charges relating to Capital Visitors Center project ARC Sign and Steel 2001 thru 2006

New York/New Jersey

Primary Responsibilities: Estimator / Ironworker Foreman Directly involved in 9/11 rescue and ensuing clean up effort in â? NYCâ? Estimating various mechanical projects â?NY / NJ Port Authority Workâ? Procurement of materials

Detailing of shop drawings for fabrication

Generation of all submittals

Supervision of all trades with respect to construction effort Compiled Bid Packages for all Sub contractors used during bid process Comparison of all bid proposals for

award Weekly meetings with all

contractors Approval of all contractors

invoicing Maintenanceof all applicable

documentation

Scheduling of all materials, areas of work, coordination of contractors Limited design work

Maintain accurate real time status of “scope of

work” Commissioning

Brennan Industrial 2000 thru 2001

New Jersey

Primary Responsibilities: Project Manager for paper mill Supervision of all trades with respect to construction effort Compiled Bid Packages for all Sub contractors used during bid process Comparison of all bid proposals for

3

award Weekly meetings with all

contractors Approval of all contractors

invoicing Maintenanceof all applicable

documentation

Scheduling all material deliveries, plant

outages, etc. Limited design work

Maintain accurate real time status of “scope of

work” Commissioning

J.K. Construction 1998 thru 1999

New Jersey

Primary Responsibilities: Project Manager / Estimator for paper mill. Project inclusive of Total Retro Fit of Facility Supervision of all trades with respect to construction effort Compiled Bid Packages for all Sub contractors used during bid process Comparison of all bid proposals for

award Weekly meetings with all

contractors Approval of all contractors

invoicing Maintenanceof all applicable

documentation Planning/Scheduling

Limited design work

Maintain accurate real time status of “scope of

work” Commissioning

Self Employed 1994 thru 1998

New Jersey

Primary Responsibilities: Project Manager for major steel mill Project inclusive of Total Retro Fit of Facility

Supervision of all trades with respect to construction effort Compiled Bid Packages for all Sub contractors used during bid process Comparison of all bid proposals for

award Weekly meetings with all

contractors Approval of all contractors

invoicing Maintenanceof all applicable

documentation Planning/Scheduling

4

Limited design work

Maintain accurate real time status of “scope of

work” Commissioning

Joule' Technical 1993 thru 1994

New Jersey

Primary Duties: Site Supervisor (Chemical

Facilities). Project inclusive of Total Retro Fit

of Facility

Supervision of approx. (25) twenty five men of various construction trades Responsible for hiring / firing craft labor

Maintained process drawings and P&ID's

Supervision of all trades with respect to construction effort Compiled Bid Packages for all Sub contractors used during bid process Comparison of all bid proposals for

award Weekly meetings with all

contractors Approval of all contractors

invoicing Maintenanceof all applicable

documentation Planning/Scheduling

Limited design work

Maintain accurate real time status of “scope of

work” Commissioning

Arranged all out sourced requirements, such as inspection services Maintained all records for later turn over to client Incorporated all new equipment into plant wide "preventivemaintenance program" Trained plant personnel in systems and operations of newly installed equipment Tracked progress of overall project for invoice generation as well as extra charges

G.J. Oliver, Engineering and Design 1991 thru 1993 New Jersey

Primary Duties: Pipefitter / Lube Oil Systems Designer Design and Fabrication of NYC Aqueduct System

Design and Fabrication of Lube Oil Consoles for refinery applications, various customers included Brown and Root, Amarada Hess, etc. Materials included pumps, valves, control systems, reservoirs, all in both carbon and 5

stainless steel

Astrolab Inc. 1989 thru 1991

New Jersey

Primary Duties: Quality AssuranceManager for Aerospace Applications. Supervised (3) Three QA/QC Inspectors X ray of all raw metallic components

Performed Statistical Quality Control inspections of all in process manufacturing Maintained all records for 100% trace ability

Vendor monitoring for adherence to QA/QC Manual

Interaction with customer's during source inspections Custom Alloy Corp 1987 thru 1989

New Jersey

NDT Inspector w/Government Source Inspector Civilian/DOD Nuclear Power Program. Inspection/Documentation of various formed pipe fittings (elbows, reducers, threaded, welded, etc.) Review of all generated documentation for inclusion into QA/QC package to accompany all products. Forms of inspection included; mechanical, x ray, mag particle, etc. Atlantic Nuclear Services 1985 thru 1987

Virginia

1st Class Millwright

Nuclear Power Plant

Outage/Shutdown

Repaired Diesel Generators, Pumps, Valves, and aided in Re FuelingOperations. U.S. Navy, Machinist'sMate 1975 thru 1985

United States Navy

Operated, maintained and effected repairs; Diesel Generators, Air Compressors, Hydraulic Systems, Air systems, Sanitary Systems, Potable Water, Compressed Gasses w/ associated 6

systems, Various pumps / valves / and equipment on board US Navy Submarines. Nuclear and Non Nuclear Mechanical Systems.

SUPPLEMENTAL EDUCATION

U.S. Navy Schools

Submarine School

Machinist's Mate "A"

School Auxiliary

Package Course

Quality Assurance / ControlledMaterial

Naval Engineering

Principles Blueprint

Reading and Drafting

Submarine Repair

Radiation Control

ISO 9002

Non Destructive Testing

Various OSHA Courses

Refer to “Educational Supplement” attachment

7



Contact this candidate