Stanley Zuroske
Holland MI
*******.********@*****.***
OBJECTIVE:
To find a long-term opportunity that will use my 25 + years of experience in the Maintenance Field
SUMMARY:
Extensive background in maintenance management, the building and installation of custom machinery, and job site repair of production equipment. Skilled in troubleshooting; related areas of expertise include:
● Electro-Hydraulic Machinery ● Hydraulic and Pneumatic Troubleshooting ● PLC Programming (Allen Bradley, Modicon, Omron) ● Cost Reduction Programs and Quality Control ● Turn-around and Productivity Improvement ● Rubber Injection Molding ● Reading and interpreting schematics ● Extensive understanding and application of electronic procedures and codes ● Previous use of digital volt and multi-meters ● Lock Out Tag Out (LOTO) development ● Extensive experience working with CMMS, MP2,
EMPLOYMENT:
Tannewicz Beechmont & Tabor - Jenison MI 09/2017to 1/ 2018
Completed machine wiring and electrical panel building for rubber injection mold machines
Troubleshoot Allen Bradley Controls
size of mold machines varied from 20- 150 tons
ABC Undercar
Maintenance Tech 12/2012 to 11/2013
Maintenance of both Blow Mold and Injection mold and assembly equipment that is associate with the automotive application And supervisor the training of new hires in the
LOTO process and the operation of the equipment on the floor, and the programming of new equipment on the plant floor.
GE. Service Technician (Dishwasher Repair) Contract with Adecco 8/2012 to11/2012
Service tech. (dishwasher Repair)
Home services replace the heater Element in the customer home without removing the product from the home. (This was a temp job they said would last three MO.)
Siemens- Holland, MI. 12/2010 - 4/2011
Machine Builder (Contract)
Worked in the waste water filter and dosing department
Worked with chemical waste water
Installed Allen Bradley and Siemens PLCs
Supervisor the maintenance personnel for electro-mechanical troubleshooting as needed
US Steel Tubular Product Div- Pine Bluff, AR 3//2010 - 5/2010
Maintenance Manager/Tech (Contract)
This division makes couplers form steel pipe for the gas and oil industry, while I was only their short time I was able to help troubleshoot the Allen Bradley PLC 2 and 500 Series controller of a thread cutting NC machine.
In charge of the electrical maintenance of the equipment and building
Troubleshooting OC system (checking for cracks and Voids’)
Make the order for purchasing of new and replacement parts on the NC equipment
Recommend New Equipment Purchases
Keep inventory at a low rate
Work on the start up of a CMMS systems
Ask Plastic-Philadelphia, PA 6/2007-9/2007
Maintenance Manager/Tech
As the Maintenance Manager, responsible for day- to-day operation of 20 injection mold hydraulic machines
Very hands-on in the repair and management of equipment (including robots) and processes, as well as HAZMAT work
Implemented CMMS and LOTO system for a mid-sized company (around 500 people)
Train employees to do and overtake small maintenance projects
Reduced troubleshooting time by 50%
PLC programming and troubleshooting (Omron and Mitsubishi)
Set up a training schedule for the operation staff
The first was to set up a program that included the filtering of the oil in the machines on a monthly turnaround and keep a control on the break downs; after I implemented this program I started a program to keep the hopper system on all the machines in the best of operation.
Laid off due to decline in business
FlexSol Packaging- Chicago, IL 4/2006 -8/2006
Responsible for all the purchasing of equipment and the maintenance of electro-hydraulic and pneumatic equipment (company made packaging for Tyson Chicken)
Day- to- day maintenance repair of 15 extruder As Maintenance Manager
( increased from 4Extruder during my employment)
Work to make the maintenance environment one that complimented all of the team
Responsible for the safety program and the training of the LOTO program
Limited HAZMAT work and waste disposal
This company the entire process was to make Blown Film for the food production industry
Interface Teksolutions- Grand Rapids, MI 9/2004- 4/2006
Assistant Maintenance Manager / Tech.
Managed all repair and installation of new equipment throughout the facility (tier-1 automotive supplier)
Installed new robots of the automatic cutting of material to size and shape work with chemical compounds to get proper thickness of coating on to material set up extruder machine to heat and dispense glue at a set speed using 4to 20 ma control.
Worked with multiple frequency drives
Did most of the programming of the PLCs (AB, Siemens) to increase the speed of production equipment
Lead technical group
Purchasing of equipment and tools
Increased production cut inventory cost by 26% in 3 month
River City Electronics 3/2003-10/2003
Electrician/ Service Technician
Completed wiring of panels and machines
Handled service of all types of PLC's (Allen Bradley, Modicon, and Omron) frequency drives, and electrical/electronic motor controllers.
Troubleshoot and program Fanuc robots
Handled contactors and customer on-site and phone support
Led repair of injection mold machines
Worked with several types of mold machines (Van Doren 300-1000 ton, Husky 200-1000 ton, HPN 150-1000 ton)
Also sold and engineered robot to remove product from mold and place and do partial
inspection before it was placed on the operator station
Mollers North America- Grand Rapids, MI 8/1995-4/2002
Service Technician
Lead in Charge of up to 25 maintenance Techs
Complete installation and start-up of high speed palletizing equipment
Complete corrective repair using electronic meters and scopes, including DMM,DVM and laptop Computers.
Programmed and troubleshoot Fanuc Robots, Allen Bradley, Modicon, and Siemens PLCs
Designed and constructed electrical panels using Allen Bradley Panel Builder software and RS Logic.
Proficient in reading and understanding most hydraulic and pneumatic drawings and systems
Tannewicz Beechmont & Tabor - Jenison MI 3/1993-8/1995
Electrical Manager
Manager of 15panel builders
Completed machine wiring and electrical panel building for rubber injection mold machines
Supervisor for the completion of the equipment and testing; size of mold machines varied from 20- 150 tons
Troubleshoot Allen Bradley Controls and Fanuc robots
Approving electric and hydraulic drawings and suggesting changes to engineering
Trained shop employees and service technicians
MacDonald's Industrial Products- Grand Rapids, MI 4/1992-2/1993 Superintendent of Maintenance
Manage up to 15 maintenance personnel
In this position I held a class 3 Journeymen's licenses
Repaired injection mold machines and completed some die repairs
Responsible for troubleshooting on variety of equipment from paint room to ultrasonic welding and a wide variety of mold machines to work on Husky, Doran HPN and Engle
Batts Inc. - Zeeland, MI 2/1983- 4/1992
Lead Electrician
Troubleshot all of the injection mold machines (450 total) in a wide variety of
tonnage
In charge of the cooling equipment, testing of the cooling water, and checking of the add pumps to make sure they were pumping the proper amount of chemical into the water
Responsible for training of operators on new equipment that was built in-house by the engineering team
EDUCATION/TRAINING:
Associate of Science- Electronics Engineering
ITT Technical Institute, Grand Rapids, MI
Work Issued Certificate- 5S Programs for Lean Manufacturing
Interface Tecksolutions, Grand Rapids, MI