Post Job Free

Resume

Sign in

Manager Maintenance

Location:
Holland, MI, 49423
Posted:
November 08, 2018

Contact this candidate

Resume:

Stanley Zuroske

***** ****** ******

Holland MI

616-***-****

ac7m3t@r.postjobfree.com

OBJECTIVE:

To find a long-term opportunity that will use my 25 + years of experience in the Maintenance Field

SUMMARY:

Extensive background in maintenance management, the building and installation of custom machinery, and job site repair of production equipment. Skilled in troubleshooting; related areas of expertise include:

● Electro-Hydraulic Machinery ● Hydraulic and Pneumatic Troubleshooting ● PLC Programming (Allen Bradley, Modicon, Omron) ● Cost Reduction Programs and Quality Control ● Turn-around and Productivity Improvement ● Rubber Injection Molding ● Reading and interpreting schematics ● Extensive understanding and application of electronic procedures and codes ● Previous use of digital volt and multi-meters ● Lock Out Tag Out (LOTO) development ● Extensive experience working with CMMS, MP2,

EMPLOYMENT:

Tannewicz Beechmont & Tabor - Jenison MI 09/2017to 1/ 2018

Completed machine wiring and electrical panel building for rubber injection mold machines

Troubleshoot Allen Bradley Controls

size of mold machines varied from 20- 150 tons

ABC Undercar

Maintenance Tech 12/2012 to 11/2013

Maintenance of both Blow Mold and Injection mold and assembly equipment that is associate with the automotive application And supervisor the training of new hires in the

LOTO process and the operation of the equipment on the floor, and the programming of new equipment on the plant floor.

GE. Service Technician (Dishwasher Repair) Contract with Adecco 8/2012 to11/2012

Service tech. (dishwasher Repair)

Home services replace the heater Element in the customer home without removing the product from the home. (This was a temp job they said would last three MO.)

Siemens- Holland, MI. 12/2010 - 4/2011

Machine Builder (Contract)

Worked in the waste water filter and dosing department

Worked with chemical waste water

Installed Allen Bradley and Siemens PLCs

Supervisor the maintenance personnel for electro-mechanical troubleshooting as needed

US Steel Tubular Product Div- Pine Bluff, AR 3//2010 - 5/2010

Maintenance Manager/Tech (Contract)

This division makes couplers form steel pipe for the gas and oil industry, while I was only their short time I was able to help troubleshoot the Allen Bradley PLC 2 and 500 Series controller of a thread cutting NC machine.

In charge of the electrical maintenance of the equipment and building

Troubleshooting OC system (checking for cracks and Voids’)

Make the order for purchasing of new and replacement parts on the NC equipment

Recommend New Equipment Purchases

Keep inventory at a low rate

Work on the start up of a CMMS systems

Ask Plastic-Philadelphia, PA 6/2007-9/2007

Maintenance Manager/Tech

As the Maintenance Manager, responsible for day- to-day operation of 20 injection mold hydraulic machines

Very hands-on in the repair and management of equipment (including robots) and processes, as well as HAZMAT work

Implemented CMMS and LOTO system for a mid-sized company (around 500 people)

Train employees to do and overtake small maintenance projects

Reduced troubleshooting time by 50%

PLC programming and troubleshooting (Omron and Mitsubishi)

Set up a training schedule for the operation staff

The first was to set up a program that included the filtering of the oil in the machines on a monthly turnaround and keep a control on the break downs; after I implemented this program I started a program to keep the hopper system on all the machines in the best of operation.

Laid off due to decline in business

FlexSol Packaging- Chicago, IL 4/2006 -8/2006

Responsible for all the purchasing of equipment and the maintenance of electro-hydraulic and pneumatic equipment (company made packaging for Tyson Chicken)

Day- to- day maintenance repair of 15 extruder As Maintenance Manager

( increased from 4Extruder during my employment)

Work to make the maintenance environment one that complimented all of the team

Responsible for the safety program and the training of the LOTO program

Limited HAZMAT work and waste disposal

This company the entire process was to make Blown Film for the food production industry

Interface Teksolutions- Grand Rapids, MI 9/2004- 4/2006

Assistant Maintenance Manager / Tech.

Managed all repair and installation of new equipment throughout the facility (tier-1 automotive supplier)

Installed new robots of the automatic cutting of material to size and shape work with chemical compounds to get proper thickness of coating on to material set up extruder machine to heat and dispense glue at a set speed using 4to 20 ma control.

Worked with multiple frequency drives

Did most of the programming of the PLCs (AB, Siemens) to increase the speed of production equipment

Lead technical group

Purchasing of equipment and tools

Increased production cut inventory cost by 26% in 3 month

River City Electronics 3/2003-10/2003

Electrician/ Service Technician

Completed wiring of panels and machines

Handled service of all types of PLC's (Allen Bradley, Modicon, and Omron) frequency drives, and electrical/electronic motor controllers.

Troubleshoot and program Fanuc robots

Handled contactors and customer on-site and phone support

Led repair of injection mold machines

Worked with several types of mold machines (Van Doren 300-1000 ton, Husky 200-1000 ton, HPN 150-1000 ton)

Also sold and engineered robot to remove product from mold and place and do partial

inspection before it was placed on the operator station

Mollers North America- Grand Rapids, MI 8/1995-4/2002

Service Technician

Lead in Charge of up to 25 maintenance Techs

Complete installation and start-up of high speed palletizing equipment

Complete corrective repair using electronic meters and scopes, including DMM,DVM and laptop Computers.

Programmed and troubleshoot Fanuc Robots, Allen Bradley, Modicon, and Siemens PLCs

Designed and constructed electrical panels using Allen Bradley Panel Builder software and RS Logic.

Proficient in reading and understanding most hydraulic and pneumatic drawings and systems

Tannewicz Beechmont & Tabor - Jenison MI 3/1993-8/1995

Electrical Manager

Manager of 15panel builders

Completed machine wiring and electrical panel building for rubber injection mold machines

Supervisor for the completion of the equipment and testing; size of mold machines varied from 20- 150 tons

Troubleshoot Allen Bradley Controls and Fanuc robots

Approving electric and hydraulic drawings and suggesting changes to engineering

Trained shop employees and service technicians

MacDonald's Industrial Products- Grand Rapids, MI 4/1992-2/1993 Superintendent of Maintenance

Manage up to 15 maintenance personnel

In this position I held a class 3 Journeymen's licenses

Repaired injection mold machines and completed some die repairs

Responsible for troubleshooting on variety of equipment from paint room to ultrasonic welding and a wide variety of mold machines to work on Husky, Doran HPN and Engle

Batts Inc. - Zeeland, MI 2/1983- 4/1992

Lead Electrician

Troubleshot all of the injection mold machines (450 total) in a wide variety of

tonnage

In charge of the cooling equipment, testing of the cooling water, and checking of the add pumps to make sure they were pumping the proper amount of chemical into the water

Responsible for training of operators on new equipment that was built in-house by the engineering team

EDUCATION/TRAINING:

Associate of Science- Electronics Engineering

ITT Technical Institute, Grand Rapids, MI

Work Issued Certificate- 5S Programs for Lean Manufacturing

Interface Tecksolutions, Grand Rapids, MI



Contact this candidate