Career Objective

Securing a Managerial position in Operations and Planning Department where my ability and education can be utilized towards achieving organizational goals which would help me develop my Engineering and Management Skills.

Academic Qualifications

Qualification

University/ Board

Specialization

Percentage

Year of passing

B. Tech

Kialing (Orissa)

Civil Engineering

72% (3rd Year)

67% (2nd Year)

69% (1st Year)

2016

Diploma

Bangalore

Civil Engineering

68%

2011

12th

Pune (N.I.O.S)

Science

56%

2013

10th

Aurangabad

Regular

73.73%

2006

Professional Employment

1.Safety Management System (Construction)

PERSONAL PROTECTIVE EQUIPMENT : Safety shoes, safety helmet, reflective jacket, ear plug, ear muff, safety goggle, safety hand gloves, safety belt,(respiratory P P Es) scaba set & air line for confined space work.

Helmet color code used in construction site:

1)White for: engineer,supervisor & staff.

2)Green for : safety personal.

3)Red for: Fire fighter.

4)Blue for : vender & Electrician.

5)Brown for: welder.

6)Yellow For : All Workers.

7)Grey for: site visitor.

WORK PERMIT SYSTEM

a.Hot work : welding, steel cutting, gas cutting,drilling grinding,

b.Height works : that activity done above 1.8 meter from ground level.

c.Cold or general work : housekeeping, shuttering, steel, brick, plaster shifting Or manually handling ect.

d.Confined space work : Any working area which is very small in closed or where one narrow entry & exit& work man cannot work comfortably this type of location known Confined space.

e.Special permit : Extremely work on hazardous,radioactive material, & other dangerous chemical, power suppliers.

Responsible for the safety precautions on site and attending safety meeting and providing training and safety awareness among labors.

2.Legal Compliance

Work Force:(Pre Employment & During Employment periodically Medical inspection for all employee & Worker.

Before employment all workmen should be insured by WC Or ESIC Policy.

After employment safety induction training for all workers.

Young employment below 18 years on site must be Prohibited.

Vehicle: Light motor,transport truck, Tempo, road roller available document like insurance, driving license, PUC, R.C. Book .and for any types of crane must inspected by competent person (form no 11) as per factory act 1948.

Material : Construction raw material like as murum,soil, sand, aggregate Royalty paper should be available before work.

Machinery equipment :

Calibration certificate must be Available before starting work with all details.

All Machinery should be Classified as per I.S Code.

Construction Material : concert, steel, brick, sand, cement, flooring,granite color,etc, testing report with must be approval certified by Architect.

3. Quality Management System

Testing Lab should be Approval by National Accreditation Board For Laboratories. (NABL).

Where we start working that place Test of soil.

Concert (cube Testing): must be as per the IS standards

Steel Testing: Grade of Steel must be as per the IS standards.

Murum filling : (Field Density Test carrying out for moisture content and density.

Method- Sand replacement test method as per IS:2720:part 28:1974 and core method as per IS:2720 part 29:1975

Same as Bricks, cement, sand, Ms material,PVC Fitting material, flooring, cladding, testing as per the IS standards

4. Key Responsibilities

Study of drawings & specification and assisting site in-charge in work schedule, planning, resource mobilization, quality and safety.

To assist Site In-Charge in all execution activities.

Control any wastage and improve quality of workmanship

Responsible for planning weekly and monthly construction activities as per client priority within time frame.

Responsible for executing works as per contracts & complete in specified time period.

Co-ordination and meetings with client & contractors.

Technical evaluation from structural & architectural work, estimation & costing from our side of the particular work to compare with BOQ.

Preparing, checking & finalizing bills for contractors.

Responsible for the safety precautions on site and attending safety meeting and providing training and safety awareness among labors

5. Key Deliverables

Projects Details –5.1 Residential Tower (STILT G+12 STOREY)

Client Swaraj Developers,

Architect: Soyuz Talib

R.C.C Consultant : Mr. B.S.Suktankar

Total Project Cost : 145 Cr.

Contractor : shree shiddi vinayak construction

(I m working contractor through for site engg

Work; client billing, execution on site, meeting with client, architect & R. c. c consultant taken clearance of any issue on site.

Working time 8/10/2011 to 10/10/2014 (3years)

5.2 Residential Government project (Karad Reast house)

Client :Special P.W.D Department

R.c.c consultant : Prasanth hadker

Architect : kapil desai (both of in Kholapur)

Total project cost : 21 Cr.

Contractor :C.B & Sons p.v.t. L.td.(borewali west)

(I m working contractor through for site engg Work; client billing, execution on site, meeting with client, architect & R. c. c consultant taken clearance of any issue on site.

( Working time 12/10/2014 to 26/12/2016 (2.2years))

3.5.3 Industrial Projects

Client coca-cola (i) Pvt Lmt.

Architect : Dandaker & Associates.

R.c.c consultant : Kedar Phadnis (both of in Pune).

Contractor : S.S.Ghorpade.

Total project cost : 3 Cr

I m working contractor through for site engg

Work; client billing, execution on site, meeting with client, architect & R. c. c consultant taken clearance of any issue on site.

( Working time 12/01/2017 to 2017

1)When we are started on coca –cola site then we arrange meeting with client& architect& R.C.C Consultant talk about terms & condition about site & safety rules etc.

2)Then taken approval of BOQ & Drawing at architect & client reference.

3)Then Planning of Bar Chart of total Project. Then weekly & daily activity chart what we are working etc.

4)when we are started physically work on site then give information to worker & our staff member of Safety,ruies terms condition of client or company

5)When we are dely any practical or client reason on work then we are planning how to achieve target as per activity chart.

IT Skills and Abilities Communication

MS-CIT,power point, Microsoft excel, Microsoft word etc.

AutoCAD

Personal Information

Date of birth: 30 Oct. 1990

Marital status: Single

Language: English, Hindi and Marathi

I hereby declare that the information given above is correct as per my knowledge and will be responsible for the same.

Date :- 09/06/2017 Place :- Navimumbai



Contact this candidate