Resume

Sign in

Manager Project

Location:
Patna, Bihar, India
Salary:
$ 7000
Posted:
October 23, 2018

Contact this candidate

Resume:

Application for Construction Manager (Civil)

Bachelor of Engineering (Civil)

ac7hak@r.postjobfree.com

At present: India 009***********

Gulf Experience: 15 years, Over all: 24 years

Joining status: Immediate

Shambhu Manjhi

Education: Bachelor of engineering (Civil)

Mode of study: Full time course (4 years degree course)

Professional Qualification: Nebosh (IGC)

Joining Status: Immediate

Job experience: Infra-Structure, Sewerage (Operation and Maintenance), Sewerage Pump Stations, Waste/Water Treatment Plant, Energy sector, Highways Road/Bridge Project, Metro rail, Manufacturing, Earth and Ground Utilities project.

Job Objective Respected Civil Engineering seeks Site and Office based Civil Engineer position where my skills would be used for the betterment of the company and its employees.

Skills: Managing the project with planning, preparing schedule, Problem solving skills, deliver the project with quality within the time frame and within the budget, overseeing the risk and issues

Computer skills: proficiency in all MS-Office, Intranet

Highlights of Qualifications:

Certification in professional engineering

Deep knowledge of civil designs and utility designs

Knowledge of Sewer operation and maintenance, (Network and Pump Station)

Outstanding knowledge of basic theories and procedures

Ability to maintain flexible schedule for all processes

Ability to work independently as well as in team

Profound communication skills in both oral and written forms

Duties and responsibilities:

Support the project management team and manage the project in case PM is absent.

Managing and leading the project team.

Manage the logistic requirements as per project requirement.

Managing co-ordination of the partners and working groups engaged in project work.

Detailed project planning and control including:

Developing and maintaining a detailed project plan.

Knowledge of drawing of Sewer line, removed the blockage, work in peak hours for safety purpose and make availability as whenever required for the project work activities execution.

Manage the Emergency team and control the activities as needed.

Coordinate with the Scada team members and alert as the operational activities.

Operate and maintain the pump stations.

Review the construction plan, coordinate with the planning Engineer. Work as per two weeks ahead plan always reporting to project manager about the work progress.

Draft No Objection Certificate (NOC) letters for Client review and execution. Provide follow up coordination as required.

Prepare / present weekly reports to the Client

Coordinate with the Water treatment plant in connection with operation and repairing the broken pipe line.

Manage service contracts, work orders, contractor payment, variations/change orders.

Develop scope of work for infrastructure maintenance contracts.

Review and certify contractor payment requests/invoices.

Execute plans for Construction and Logistics Details and draft Employer’s Instructions as required.

Manage infrastructure maintenance (O&M) service providers/ related agreements.

Attend construction related meetings with the Developers.

Isolate the pump station, putting stopper, mechanical stopper technically and follow all safety devices and with following confined space procedures work permit system.

Make calibration and make ready all heavy equipment at all time.

Use jetting tanker for cleaning the sewer line and involve in CCTV operation for cleaning the sewer line.

Monitoring project progress and performance.

Providing status reports to the project Manager and Divisional Manager.

Managing project training as per project requirements.

Liaises with, and updates progress to, project management.

Managing project evaluation and dissemination activities.

Work and get the final approval of the design specification.

Working closely with users to ensure the project meets business needs.

Fully aware the EHS management system and all activities should be carried out per EHS requirements, MS and Risk Assessments.

At present: Velosi Certification Company LLC, Qatar

Duration: Dec 2017 to June

Sewerage, Drainage, pipe line projects

Designation: Construction Manager

Client: Ashaghal

Professional Experience:

Designation: Construction Manager

Company: Rizzani De Eccher,Doha Qatar

Rizzani De Eccher -Precast manufacturing company (precast of segments for Road Bridge and metro rail project)

Involve in road project, traffic management, transportation, high equipment operation, precasting segments

Duration: 2 year’s contract (September 2015-July 2017

Tamas Project, Abu Dhabi UAE Duration: October 2004-Sept 2014

Specialized:

For Sewerage operation and maintenance, waste water, drainage, irrigation, construction for Rehabilitation and replacement of existing sewer lines, Road Project, infra-structure, airport expansion and maintenance

Tamas Project, Abu Dhabi UAE

Duration: Oct 2004 - Sep 2014

Designation: Project Manager

Projects: The Projects included Road Works, sewage network, (Operation and Maintenance), Sewer Pipe line construction (Rehabilitation and Replacement of existing sewer line), Manhole Installation, CCTV operation, NDM Pits, Micro Tunneling, power cable, and optical fiber cables. Infra-Structure, Operation and Maintenance of Tunneling Projects

Road Works Projects: Role: Civil Site Engineer

Replacement of Round About and Signalized intersection in Abu Dhabi. Mussafah

Client: Department of Transport (DoT), Abu Dhabi, UAE Project Value: AED 180 Million

Installation of new signal intersection in Khalifa City, Abu Dhabi, UAE

Client: Department of Transport (DoT), Abu Dhabi, UAE Project Value: AED 180 Million Client Consultant: Parsons International Limited

Operation and Maintenance of Tunnel, Yas land P-875

Client: Department of Transport (DoT), Abu Dhabi, UAE Project Value: AED 115 Million Duration: Aug 2008: Sept 2014 (In Vehicle monitoring System)

Roles and responsibilities:

Planning the project schedule, manage the team, Site management & planning

Proper study of tender documents, site location, drawings, specification of the project.

Prepare & provide site material / plant / machinery requisition in advance

Labour histogram for the project duration to be provided with the help of Planner and Project Manager.

Prepare shop drawings for submittal with the help of Draughtsman

Prepare required material submittal & take approval in advance before starting the site execution & followed with placing orders with suppliers / sub-contractors.

Procure the material in co-ordination with procurement department according to specifications & approval

Provide the necessary technical support to the execution team after accessing the project document thoroughly.

Co-ordination with client / consultant engineers, other supervising staff / Site In charge / Project manager and sub-contractor / suppliers

Conduct site inspection as per project requirement

Ensure the quality and HSE at the work place and maintaining the required project documents as per ISO standard.

Provide work progress to planner regularly.

Report daily site updates to project manager including providing copy of site dairy

Prepare & provide manpower requirement on daily basis

Prepare monthly interim valuations and follow-up until file moves to the client concerned department after necessary approval from the Engineer.

Be punctual on site timing, especially at starting time

Completed the following Sewer line Projects:

Types of Contract

Duration

Amount

Client

Types of work

Operation and Maintenance of Abu Dhabi Mainland and Al Ain City Sewerage Networks and Pumping stations Contract No. O-1204

Oct 2004-Nov 2010

355 M

ADSSC

Operation and maintenance of the Sewage Collection System Assets including Sewage Network, Sewage Pumping Stations and Force Mains in Abu Dhabi Mainland and Al Ain, all owned by the Abu Dhabi Sewerage Services Company (ADSSC)

Operation and Maintenance Contract for Abu Dhabi Island

Nov 2010-Feb 2012

255 M

ADSSC

Operation and Maintenance

Contract No. O-2574 Tankering Discharge Facility at ICAD

Feb 2012-Dec 2013

5.6 M

ADSSC

Construction of Internal back drop, 12.5m depth, 500mm dia. GRP including control of existing flow with all safety precaution.

Construction of complete GRP manhole 1500 mm internal dia on 500mm dia GRP pipe line including base unit, 1500mm GRP shaft, concrete slab, sealing plate etc

Contract No. O-2078 Sewerage Connections and Related Works for Isolated Properties in Al Ain Region,

Dec 2013-Sept 2014

57.5 M

ADSSC

Construction of new 300mm GRP foul sewerage gravity pipelines with associated manholes.

Connections to existing foul sewerage system, Construction of foul sewerage manholes, collection chambers, inspection chambers, grease traps and other ancillary works.

Main duties and responsibilities: (But not limited to

Detailed project planning and control including:

Developing and maintaining a detailed project plan.

Knowledge of drawing of Sewer line, removed the blockage, work in peak hours for safety purpose and make availability as whenever required for the project work activities execution.

Manage the Emergency team and control the activities as needed.

Coordinate with the Scada team members and alert as the operational activities.

Operate and maintain the pump stations.

Coordinate with the Water treatment plant in connection with operation and repairing the broken pipe line.

Isolate the pump station, putting stopper, mechanical stopper technically and follow all safety devices and with following confined space procedures work permit system.

Make calibration and make ready all heavy equipment at all time.

Use jetting tanker for cleaning the sewer line and involve in CCTV operation for cleaning the sewer line.

Managing project deliverables in line with the project plan.

Recording and managing project issues and escalating where necessary.

Supervising Civil Engineer

F.N Construction, Delhi, India

July 2000 – August 2007

Commercial and residential in Delhi, India

Client: URS Corporation, Delhi Project Value: INR 255.60 Crores

Civil Engineer

Hindustan Construction Company. Delhi, India

May 1998 – June 2000

Road-N H 22 Expansion

Client: AFCONS Project Value: INR 23.88 crores

Winston Construction-

June 1992-1998

Site Supervisor

Personnel information:

Date of Birth: 15th Oct 1966

Driving License: Valid, Indian - 1461959

Languages: English, Hindi, Urdu, & Basic Arabic

Passport: M0521111



Contact this candidate