RESUME
NAME : VEERA KUMAR.K
Personal Details.
Age / DOB :
Nationality :
INDIAN
Designation
SAFETY OFFICER
Educational Qualification
BSc Chemistry, Diploma in Fire & Safety Management.
Total Experience.
19+ Years
Training courses attended:
Fire prevention and Fire Fighting training. (Academy of Maritime, Chennai)
Elementary First Aid. (Academy of Maritime, Chennai)
survival techniques training. (Academy of Maritime, Chennai)
Personal Safety and Social Responsibilities. (Academy of Maritime, Chennai)
H2S (Q.I.S.C – Doha, Qatar)
PTW (Qatar Petroleum, Doha, Qatar)
Key Skills:
Render advice and monitor for effective implementation of HSE measures in Construction, Erection and commissioning activities on both on/off shore operation.
Regular inspection on construction activities such as Excavation, Scaffolding erection/dismantling, Working at height, manual handling, Material lifting, Blasting & Painting, Hot work activities, Radiography etc. and ensure adherence of HSE standards.
Advise and ensure effective implementation of permit to work system at work site.
Routine Inspection on PPE’s-Personal protective Equipment, Fire extinguishers, BA-breathing apparatus and combustible/toxic gas detectors.
Organizing and conducting safety training, monthly safety meeting and participating Tool box meeting.
Adopt HSE measures in storage of hazardous chemicals, gas cylinders and loading / un-loading of material.
HSE auditing and follow up for implementation of recommendations.
Advise and ensure for safe disposal of waste material as per waste management plan.
Advise and ensure inspection of lifting appliances as per lifting equipment regulations and periodical inspection of vehicle/Equipment.
Investigate accidents / incidents and suggest recommendations to prevent re-occurrence.
Participating emergency exercise and educate employees in emergency procedures.
To maintain safety statistics - safe man hours, incidents/accidents etc and provide periodical reports
to the management.
Co ordinating with client to meet operational requirements and to improve Housekeeping at the work site.
Page 1 of 4
Work Profile:
TRADING & AGENCY SERVICES LTD. (TRAGS)
(Engineering and Contracting Division)
Doha, Qatar
Period : From FEB 2012 to Till date
Designation: Safety Officer
Projects involved:
: VIBRATION ANOMOLY SUPPORT IN QGII & 3 & 4
: LTC-VEN-1571-14 – PROVISION OF ADDITIONAL FUEL GAS FILTER COALSCER SKID IN QG 1,2,3,4
:STC-C-VEN-2343-15-PPOVISION OF RE-CONFIGURATION OF INPUT POWER SUPPLY IN QG 1 & 2
:LTC-VEN-1959-12 C44 - INSTALLATION OF CHECK VALVE ON PHASE 1 CLPG BOG COMPRESSORS
:LTC-VEN-2084-13 - QG1 WH-1-2-3 CHOKE VALVE RESIZING PROJECT
:LTC-VEN-2132-13 - EPC FOR THREE COMBINED PROJECT IN QG-3 & 4
:LTC-VEN-2163-13 - FOUR COMBINED EPC PROJECT IN QG2
:LTC-VEN-2330-13 - PROVISION OF THREE COMBINED SHUTDOWN PROJECT IN QG-2
: LTC-VEN-2360-13 - PROVIDE SIMPLE MAINTENANCE DEVICE FOR P1701 A-B-C AT LAFFAN REFINERY
:LTC-VEN-2391-13 - PROVISION OF FIVE COMBINED PROJECTS IN QG-2
:STC-VEN-1321-14 - PROVISION OF WELL HEAD PROPER SAMPLING POINT
:STC-VEN-1509-14 - REPLACEMENT OF 4'' CONDENSATE LINE DOWN STREAM WITH 6'' PIPING OF EXISTING 24-LV030034 AT QG2
Project
: Provision of Re-instating CP system and Waste water Tanks Bottom Plate
Replacement.
Client
:
Qatar Gas ( July 2014 )
Project
:
4 combined Project - QG)
Client
: Qatar Gas ( Feb 2014 – June 2014)
Project
: Installation of New Nitrogen Pipe line To QG3 & 4 Facility
Client: Qatar Gas ( Dec 2013 – Jan 2014 )
Project
: Installation of New sea & fire water pipe line
Client
:
QAPCO, MESAIEED ( NOV 2013)
Project
: 3 COMBINED SHUT DOWN QG 3 & 4
Client
:
Qatar Gas ( Oct 2013)
Client
:
Qatar Gas (May 2013- Sep 2013)
Project
:
Remedial Project QG 3 & 4
Project
: Qatar gas plant surrounding the U-Ditch area fixing the Pole, Chains and pedestrian walkway.
Client
:
Qatar Gas-2 (Sep 2012- Feb 2013)
Project
: Construction of Qatar gas Plant Fire station car parking Fencing.
Client
:
Qatar Gas (May 2012- AUG 2012)
Project
: Construction of New Sports Club,
Client
:
QAPCO, MESAIEED (FEB 2012- Apr 2012)
Previous Experience:
Project Name
Production of Painting
Affiliate
MRF
Responsibility
Safety Officer
Company
Continental Coatings, Chennai, Tamil Nadu, India.
Period
1th May’2010 to 9th Feb 2012
Page 2 of 4
Project Name
Mechanical maintenance in crude oil loading arms. And FCV
(flow control valve) skid foundation in Tank farm.
Affiliate
Qatar Petroleum, Qatar.
Responsibility
Safety Officer (QP approved safety officer)
Company
Archirodon construction (overseas) Ltd, Doha, Qatar.
Period
19th January’2007 to 17th March 2010
Affiliate
M/s Hardy Oil & Gas PLC Oil & Gas Exploration and production
(Onshore & Offshore) – In corporate with British – Bomeo
Petroleum Syndicate.
Responsibility
Safety Officer
Company
Easwarnath Construction Ltd, Chennai. India
Period
07th March 1998 to 17th January 2007
1.Project: Construction of 2.5 MGD (Million Gallons per Day) of secondary and tertiary sewage treatment plant.
The job involved HSE activities from civil foundation works for stilling chambers, tricking filters, ammonia degassing tower, limestone
Fabrication and erection CS and HDPE piping and their supports
Erection of equipment’s such as storage tanks, pressure sand filters, RO units, limestone conveyors, sludge storage pit, tricking filters etc.
Laying of concrete and bitumen roads
Received HSE award for successful completion of the project without lost time incident.
2.Project: Fabrication and erection of 130TPH boilers for process and tank internal heating
The work included fabrication and erection boilers structures.
Erection of boiler tubing, insulation works and stacks.
Fabrication and erection of steam piping with supports
Received HSE award to achieve 0.1 million man hours without LT1
3.Project: Construction of new office building and roads
Work involved construction of new high rise office building including HVAC and plumping
Formation of main and arterial road to office and connection to the public road including construction for storm water drains etc.
4.Project: Upgrading of facilities at offshore
Work involved refurbishment of living quarters on the platform
Piping modification work
Replacement of existing equipment with a similar equipment of higher capacity. This included structural and piping modification.
Affiliate
M/s ONGC (Oil & Natural Gas Commission), India – A
Government of India Undertaking and a Fortune 500
Company.
Responsibility
Safety Officer
Company
Easwarnath Construction Ltd, Chennai. India
Page 3 of 4
Project Handled:.
Construction of storage yard and building
The job involved HSE activities from civil foundation works for material storage yard, material storage building, office building and storm water drains.
Construction of material storage building with erection of steel racks.
Construction of office building, formation of roads and storm water drains
Mechanical maintenance contract on offshore platform
Responsibilities.
The job involved erection of scaffolding, carrying out shut down work on columns, vessels, filters, pipeline etc. on their offshore platform
Piping modification work and erection of additional structures
Received HSE award for Longest accident free period
Personnel Details.
Full Name.
VEERA KUMAR.K
NATIONALITY
INDIAN
20, SRINIVASAN (ST), PERAMBUR,CHENNAI
Permanent Address.
TAMIL NADU.
Passport Details.
L 8320227
QID Details.
Languages Known.
English, Hindi, Malayalam, Tamil
Mobile No.
Email ID.
ac7g3e@r.postjobfree.com
Driving Licence Details.
NIL
Declaration.
I hereby declare that all the information given above is true to the best of my knowledge and belief.
Name: VEERA KUMAR.K
Page 4 of 4