CAREER PROFILE
Corporate Functional Manager Maintenance, Integrated Work Management Manager, Balance of Plant Engineering Director, Materials Manager, Solid qualifications in Plant Management, Quality Management, Plant System Design / Implementation, Operations, Project Management, Manufacturing, and Human Resource affairs.
Effective communication and interpersonal skills serve as a foundation to effectively interact with both internal and external personnel.
Management / Strategic Planning / Technical Support / Operations / Administration
PROFESSIONAL EXPERIENCE
Kelly Services, TRI Thermochem Recovery International – Oct 2017 May 2018
5201 International Drive Durham North Carolina 27712-8950
Plant Operations
Lead a team of supplemental personnel to complete start-up activities. Operated the plant to produce Syngas and liquid fuel production.
Completed plant start-up in accordance with production schedule.
Met production schedule ahead of client partner production for prototype jet fuel plant.
Met all environmental and safety goals and limits during multiple regulatory inspections.
Entergy – Grand Gulf Nuclear Power Station - Dec 2013 to Nov 2016
7003 Bald Hill Rd. PO box 756 Port Gibson MS 39150
Senior Manager Maintenance,
Direct plant maintenance staff, including the implementation of maintenance recovery actions back to sustainable INPO performance levels. Implementation of maintenance fundamentals, and new fleet procedures. Increased Production and quality though inspection and assessment through metrics.
Achieved Maintenance and Technical Training Accreditation renewal.
Met outage performance goals for planned refuel and unplanned forced outages.
Met department budgets for labor, inventory use and equipment repairs.
Reduced preventative and corrective maintenance backlogs and modified strategy to attain production goals.
Constellation Energy Nuclear Group – May 2012 to Dec 2013
100 Constellation Way, Baltimore MD 21202
Corporate Functional Manager Maintenance,
Direct Site maintenance, through governance, oversight, and support activities associated with the safe and reliable operation of the five fleet nuclear stations.
Governance of fleet procedures and processes.
Oversight of maintenance and work management implementation, quality standards.
Support to develop industry standards and guidance
Performance of maintenance and work manage duties during periods of plant needs
Xcel Energy – Prairie Island Nuclear Generating Station Feb 2010 to May 2012
1717 Wakonade Drive East, Welch, MN 55089
Maintenance Manager,
Provide leadership and direction to the maintenance organization, which includes organizing, directing, coordinating, and controlling the conduct of maintenance and manufacturing. Responsible for reinforcing safe work practices, oversight of respective training programs, and control of department budgets, and production.
Reduced the site work order backlogs to industry median under AP-928 Rev 3.
Reduced the CAP and Non-Cap Backlogs to lead the station in reduction efforts and understanding of the backlogs.
Improved Maintenance Human performance event clock from an average of 3 days between events to over 9 days. (Includes all contractors on site)
Improved department Quality ratings from Red to Green in two quarters.
Shaw Stone & Webster Construction Inc. Oct. 2007 – Feb 2010
4171 Essen Lane Baton Rouge, LA 70809
Director Projects, Project Manager
Project Management, for development assessment and implementation of EPC contracts
Proposal develop,
Implementation estimating,
Management structure and oversight governance.
Develop cost benefit analysis and consulting to client representatives, and potential clients.
Constellation Energy - R. E. Ginna Nuclear Power Plant Feb. 2005 to Oct. 2007
R. E. Ginna Nuclear Power Plant, 1503 Lake Rd. Ontario NY
Maintenance Support, General Supervisor – Jun. 2006 – Oct 2007
Completed a record power up-rate of 17% in 24 days including a high-pressure turbine replacement and 37 other outage modifications.
Maintained an outage budget of 13.9 Million dollars.
Designed and installed a second overhead crane to support Turbine outage work.
Engineering Director Balance of Plant Systems – Feb 2005- Jun 2006
Responsible for engineering attributes of system health and reliability for the balance of plant systems at Ginna station. Oversaw Thermal Performance, FAC, and Equipment performance data entry programs.
Supervise the installation of the Water Treatment Modification and the GE Betz Water Treatment Trailers.
Lead the Safety System Design and Performance inspection preparations in support of the NRC inspection team.
Built Quality Inspection plans for modifications acceptance testing and return to service post maintenance.
U. S Navy – 1985 to 1991
EDUCATION
MBA, Operations Management/Human Resources, LEWIS UNIVERSITY, Romeoville Illinois
Bachelor of Business, Finance, WESTERN ILLINOIS UNIVERSITY, Macomb Illinois