Manolo C. Ramos Bensalem PA 19020
Electrical Engineer Home 215-***-****
Cell:267-***-****
ac7267@r.postjobfree.com
EXPERIENCE:
August 27,2012-October 30.2015-The Wedge Medical Center, Inc.
Consultant
Presenting findings and recommendations to management.
Implementing solutions and ensuring that clients receives the necessary
assistance.
March 13,2006-Feb 24,2007: IAP World Services,CMMS Administrator,IRS Facilities.Philadelphia PA
Responsible for documentation/encoding of all maintenance activities in the
computer.
Coordinate daily maintenance activities done and record all materials and
manpower consumed.
Perform inspection every day and make sure all equipment are in good
operating condition.
Supervised and inspect works done by the contractors.
Prepare and submit reports periodically.
Do other jobs that may be assigned
.
April 7 2000-March 11 2006: American Red Cross Philadelphia PA,Laboratory
Assistant.
Process blood and associated product.
Implement CGMP and FDA requirements.
Quality Control of process product and equipment prior to operation.
Inspect and receive blood prior to processing and make sure in good condition
1999-2000: Packaging Coordinators Inc.Philadelphia PA,Quality Control
Inspector.
Quality control inspection of pharmaceutical product packaging.
Implement FDA and CGMP requirements.
Quality control inspection of all equipment prior to operation.
Review and signed documents and make sure sure products are within
Acceptable standards.
1985-1999: National Power Corporation. Manila Philippines.Efficiency Control
Section(Engineering Section) Head (1992-1998)
Engineering support to 2x300 MW power plants operations and
maintenance.
Conduct test and inspection of boiler,turbine,Generator,coal handling,ash
Handling water treatment plant and all other electrical equipment/systems
Rotation test of all motors,analized results and make recommendation if
necessary.Applied reliability centered maintenance.
Planned and inspected scheduled maintenance activities and supervised
maintenance personnel.
Monitor daily plant operation and make sure parameters are within
acceptable limits .
Generate all plant operation reports,meet plant visitors,attend meetings,and
represents the plant in any other when nedded.Technical staff of the group
manager and act as manger when manager is out of the plant.
Implement good house keeping,safety measures,energy conservation and
Environmental protection.
Safe keep plant technical records and documents.
Plant operation think tank.
Electrical Maintenance Supervisor (1989-1992)
Responsible for sound maintenance of all electrical equipment on boiler,
turbine,generator,coal and ash handling,water treatment,switchyard and
substation equipment.
Turbine Control Engineer (1989)
Operate turbine and auxillary within designed limits.
Results Engineer (1985-1989)
Prepare daily plant operation report.
Test and inspection of all electrical equipment evaluate results and make
recommendation if necessary.
Act as plant Quality Control Engineer.
Monitor daily operation reports and make sure within standard operating
Parameters.
1980-1984 Meralco Industrial and Engineering Corporation.Quality Control
Engineer,Philippine Nuclear Power Plant.(Testing and Cable
Pulling and Termination.
Responsible for quality control of electrical testing and cable pulling and
Review and signed documents if within control limits and standards.
Generates inspection resports and results.
1973-1980 :Trans –Asia Philippines Inc.,Project Engineer,Design and
Construction of Electrical Distribution system and Substation.
Supervise the contractors in the construction and maintenance of
Electrical distribution system substation and head quarter facilities
for electric cooperatives in the country and our own personnel
in the field. Attend meetings and update the cooperative manager and
directors regarding status/progress of work.
Conduct load survey and town mapping and help secure right of way.
Train cooperative personnel and represent the Cooperative in technical
matters. Serve as consultant of the cooperative.
Prepare progress reports and as built plans and drawings.
Education: Mapua Institute of Technology
Bachelor of Science in Electrical Engineering
Golden Gate Colleges Batangas Philippines (21 Units MBA)
Seminars/Trainings:
Aug.27-29 Manila Philippines:Advance Engineering Management
Training Course
October 21-November 15,1896,Sydney and Brisbane Australia:
Coal Utilization and Environmental Management. United Nation
United Nation Development Program (UNDP)
June 24-29 1991: Basic Energy Training Course. Manila,Phil.
July 30-August2,1991 Manila Philippines :Preventive Maintenance /life
extension and advance technology for steam turbine generator,pumps
and boiler.