Resume

Sign in

Manager Plant

Location:
India
Posted:
September 09, 2018

Contact this candidate

Resume:

DHARAMVEER SINGH

Manager Engineering I am an ambitious professional with experience of 20 years in the Industries across Project Engineering & Management, Erection and Commissioning of Boiler, Turbine with Distillation Plant, Site Coordination, Maintenance Planning, Lisioning, Documentation, Cost Optimization, Safety and Manpower Planning. Currently I am spearheading as Manager Engineering with Saraya Distillery, Sardar Nagar Gorakhpur, U.P, a molasses based Distillery Equipped with Multi Effect Evaporator, Bottling and Pet Bottle Unit

Personal Details

Father’s Name Shri Horam Singh

Date of Birth 10 May 1974

Age 43 Year

Email Address ac6zmp@r.postjobfree.com

Communication Address Flat - A-7, Distillery colony, Saraya Campus, Sardar Nagar,

Gorakhpur U.P

Mob. No. 842-***-****, 790-***-****

Permanent Address Village Mehmoodpur Kunj

Post Lakhauri Jalalpur

Tehsil Sambhal

District Sambhal

State Utter Pradesh, 244302

Educational Qualification

Diploma in Mechanical Engineering (Specialization in Production Engineering) With First Division from Government Polytechnic Moradabad in 1996 (UPBTE LUCKNOW)

Work Experience

1.July 2017 to till dated- Saraya Distillery, Sardar Nagar Gorakhpur (A group of saraya Industries)

Joined as a Manager Mech. Engineering- Handling operation and Maintenance of whole plant, as Boiler- 25 Ton, 45 kg/cm, 2.2 M.W back Pressure Turbine, D.G Set, Cooling Tower, E.T.P, R.O Plant, M.E.E, Biogas & Bio compost Plant, Bottling and Pet Bottle Unit

Manpower Planning,, Inventory management, monitoring of Equipment efficiency and Condition, Monitoring of equipment’s, Prescribed Parameter’s, Daily Report of Power Generation, Fuel consumption, Chemical consumption, Spare parts Requirement etc.

Planning overhauling and modification of all mechanical operations system as like Preventive & break down maintenance of semi auto line as when required

Analysis of down time to ensure minimum stoppages of machines

Minimize Maintenance and production cost through close monitoring, power conservation, & preventive maintenance

Work with safety is my first priority, to motivate the Man power, cost cutting, implementation and achieve the effective efficiency of plant and machinery is my motto.

Checking with purchase and stores regarding the delivery and availability of parts

2Feb 2016 to March 2017 - SCI India limited, Raipura, Rajon, District- Banka, Bihar (A Unit of SCI Group), Grain Based Distillery

Joined as a Manager Utility & Maintenance – Completed Erection & commissioning of Distillery Plant Equipped with Multi Effect Evaporator, Dryer, Boiler, Turbine, Handling operation and Maintenance of whole plant with Boiler- 25 Ton, 45 kg/cm, & Turbine- 2.5 MW Back pressure, Air compressor, D.G set, Cooling Tower, W.T.P, R.O Plant, E.T.P, Budget Planning, Man Power planning, Inventory management, monitoring of Equipment efficiency and Condition, Monitoring of equipment’s, Daily Report of Power Generation, Fuel consumption, Chemical consumption, Supply Chain etc

315 May 2011 to 31st Jan- 2016 – National Industrial Corporation Limited, Raja-ka Sahaspur, Bilari, Moradabad U.P (A unit of Nicol House)

Work as Dy. Manager Engineering, Handling of operation and Maintenance of Entire Plant with Bottling Unit (I.M.F.L & country Liquor), boiler, Turbine, D.M Plant, E.T.P, Bio compost

Responsibility – Budget Monitoring, Man power Planning, Liaoning with Government Authorities, Maintenance Cost Cutting, Vendor Execution etc

Monitoring of equipment’s, Prescribed Parameter’s, Daily Report of Power Generation, Fuel consumption, Chemical consumption, spare parts Requirement etc.

Planning overhauling and modification of all mechanical operations system as like Preventive & break- down maintenance of semi auto line as when required

409 June 2008 to 01 May 2011 – Pranav Agro-tech Industries Pvt. Limited Aurangabad Maharashtra

(A unit of Mallikarjun Group), Grain Based Distillery

Joined as a Manager Project & Maintenance, Completed Erection and commissioning of Boiler, Turbine, Distillation Plant, Grain Based Distillery Equipped with Multi effect evaporator, Dryer, Bottling unit and Coշ Plant, look after all Mechanical equipment with Boiler, Turbine, D.M Plant, W.T.P, Cooling Tower and E.T.P. Budget planning, Man power planning, New Project execution etc.

507 July 2003 to 2008 – Jubilant Organosys limited Gajraula, J.P Nagar U.P on contract basis

Joined as Sr. Engineer Mechanical

Responsibility- Look after Repair and Maintenance Job of Boiler, Distillery unit and Aldehyde Plant

6. 11 May 1998 to 15 June 2003 M/s Ess Cee Associates, campus – India Glycols Limited Kashipur UK

Joined as site incharge, Handling of Fabrication and Erection job of Boiler Chimney, Glycols Ether Plant and Distillery Extension Job

7 14 March 1997 to 13 March 1998 – The Kisan Sehkari Chini Mill Gajraula, Hasanpur, J.P Nagar joined as

Apprentice

Last salary Drawn

60000 per month + Free of cost accommodation

Expected salary

As per company Standards

Notice Period

30 Days

DECLARATION

I Hereby declare that the above particular's are true to the best of my knowledge and belief

Yours Truly

Place

Saaya Distillery, Sardar Nagar

Gorakhpur U.P

DHARAMVEER SINGH



Contact this candidate