S.RAVICHANDRAN,

Cell: **-**-984-***-****, **-**-969-***-****

E-Mail: ac6vqg@r.postjobfree.com

Skpe I.D: ravichandran19611

Respected Sir,

Sub : Application for post of Piping Engineer

I am a graduate engineer in mechanical engineering. I have 15 years experience

India and 10 years experience in Gulf in the area of Design, construction.

I wish to apply for the above said post. I have enclosed my curriculum vitae

for your kind consideration.

Thanking You,

Yours faithfully

S.RAVICHANDRAN

Cell: 00-91-984-***-****, 00-91-969-***-****

S. Ravichandran Mail ID: ac6vqg@r.postjobfree.com

Position Applied For : Piping Engineer

Date of Birth : October 20, 1965

Marital Status : Married

Nationality : Indian

Passport Details : J 0687635, Issued at Trichy

Communication Address : 104,first floor, No:5,North car street, Thiruvanai koil,

Trichy-620005.

E-mail : ac6vqg@r.postjobfree.com

Skpe I.D : ravichandran19611

Saudi Driving license No: : 235*******

Academic Profile

Degree : Degree in Mechanical Engineering passed out in 1996 at Regional Engineering College, Trichy, India.

Diploma : Diploma in Mechanical Engineering (DME)

Passed out in 1983 at Seshasayee Institute Technology, Trichy, India.

Additional Qualifications : Certificate course on Programming and Operation of CNC passed out in july, 2001 at Regional Engineering College, Trichy, India.

Certificate course in AUTOCADD R14, PDS, Micro station, PDMS

Caesor- 2, Studying Design of pressure vessels course in trichy.

Computer Skills

Software : AutoCAD, Microstation

MS-Word, MS-Excel,

Skills Profile

Conversant with the Preparation of basic engineering design & drawings including Piping Isometrics Piping layout, Equipment layout,Bill of Material, Steel structural drawings, Tank drawings, Pressure vessel drawings, Cement plant equipment drawings, etc.,

Familiar with various codes and standards viz., ANSI, ASME, API, ASTM, etc.

Having experience in Piping thickness calculation, Piping Reinforcement pad calculations, Piping Material Specification, Valve Data sheet.

Having experience in Co-ordination of fabrication & execution activities of pipings & steel structurals.

Having exposure in RT, UT,DP in DAS ISLAND.

Experience Profile

Vekkaliammam Industries, Trichy Tamil nadu, India. From 2016

Working as a Sr.Engineer. Responsible for shop drawing preparation, fabrication, erection of pipings, steel structures.

Samsung Engineering company ltd. Saudi Arabia from June 2013 to June 2015

Projects: Saudi Arabian oil company: ARAMCO Riyadh Clean Transportation Fuel

Position: Piping engineer

Review of Equipment vendor drawings.

Involved in Site verification .

Co-ordination with civil, electrical, instrumentation, Mechanical departments.

Involved in Proposals, Hydrotest diagrams, Hydrotest procedure / packages

Preparation of valve MTO,

Design of Piping layout.

Quality checking of Plot plan, Nozzle orientation, Line designation table, Tie-in index,

Quality checking of piping isometrics using SMART PLANT REVIEW

Quality checking for clashes of piping with equipments, steel structures using SMART PLANT REVIEW

Involved in preparation of Safety Instruction sheet, Line List,

Involved in editing work in MICROSTATION drawings after extraction from PDS.

Preparation of Preliminary MTO using SMATO software .

Tebodin engineers & consultant, Bahrain, from July 2011 to Nov 2012.

Projects: EWA water projects, BASF Plastic additive chemical project,Eagle eye-Renckitt & Beckinser,

Position: Mechanical engineer,

Co-ordination with architectural, structural, civil, electrical, instrumentation departments for clashes.

Design of piping layout, Preparation of Bulk MTO, Tank drawings,

Preparation of valve data sheets

Quality checking of isometrics.

Preparation of Thickness Calculation of Water Piping, Reinforcement Calculation for Water Piping.

Co-ordination of Sub Contractors. Site Inspection of Piping, HVAC, Equipments for BASF.

Site Inspection of Hydrotesting of Piping for BASF.

Participated in meetings with client. Stress Analysis of Pipings by using CAESOR-2

Company: Hyundai Heavy Industries Co. Ltd. Kuwait, from May 2010 to May 2011

Projects: Sabiyah power plant 2100 MW.

Position: Piping construction engineer (Permit holder)

Follow – up of piping spools for fabrication, painting,

Co-ordination for Execution of gas oil pipings,fire fighting lines in pipe rack, gas oil tank area.

Co-ordination for hydrotest, pneumatic test for gas oil pipings, fire fighting lines.

Co-ordination of execution of pipe rack.

Co-ordination of sub contractors.

Co-ordinates with Mechanical, architectural, structural, civil, electrical, instrument departments.

Company:Gulf Spic trading & contracting company, Kuwait, from September 2008 to September 2009.

Projects: Kuwait oil company- As built of existing facilities

Position: Piping engineer (Permit holder)

To update existing General Arrangement Drawings (Piping plan) regarding Piping routing changes, Addition & Deletion of piping, Addition & Deletion of Equipments.

Verifying / taking measurements for pipe lines, pipings, equipment location showing in the above drawings.

Internal Inspection of above drawings after data collection at site.

Co-ordination with Client inspection for above drawings and getting approval.

Co-ordination with civil, electrical, instrumentation, Mechanical departments.

Company: Galfar Al-Misnad company, Qatar, From October 2007 to March 2008.

Projects: Dukhan flow line project.

Position: Piping engineer

Work (Design) package of oilwell flow line from well to de-gassing station manifold.

Work (Design) package of powered water injection spur line.

Co-ordination activities with Design consultant for conducting stress analysis.

Site survey to confirm the flow line routing, expansion loop location, anchor location.

Company: Integral services company, Kuwait, from October 2006 to September 2007.

Project : Sea water pumping station

Position: Piping engineer- site

Execution of pipe lines and pumps in sea water pumping station.

Preparation of materials for execution.

Participated in meetings with Doosan -main contractor, client,

Company: Kharafi National company, Kuwait, from Jan 2005 to August 2005.

Projects: Kuwait oil company up gradation of gathering centre, booster station.

Equate petrochemical complex shut down.

Involved in preparation of HVAC drawings,

Quality checking of piping isometric drawings generated from Spool gen.3D model software.

Involved in piping execution in Equate shut down.

Company: Arabi Ener Tech. K.S.C. Kuwait from June 2003 to May 2004

Projects: Ministry of public works – Sewage water pumping station

Responsibilties:

Participated in meetings with client.

The maintenance activities of pumping station rotating equipments, like various types of pumps,lifting station screw pumps, blowers.

Co-ordination for fabrication and erection activities of pipe lines.

Company:AL-Marai Company Ltd., K.S.A., from June 2000 to Decemeber 2000

Projects: Al Marai company

Position: CAD Engineer

Preparation of drawings including equipment drawings, conveyor drawings, by using AUTO CAD software.

Field survey to prepare the drawings to modify/ improves the existing plant.

Co-ordinate with other departments for execution of works.

Company: SABIC ( R & D ) * Riyadh - K.S.A, from May 1999 to May 2000

Projects: SABIC (R&D)

Position: Piping designer

To carry out the design & drafting activities for various multi discipline Design Change Requests

To prepare the drawings including P & ID, Piping Layouts, equipments layouts, piping Isometrics, Pressure vessel drawings by using AUTO CAD.

To do field survey to prepare the drawings to modify/improve the existing plant & piping.

Co-ordinate with other departments for execution of works.

Company; Dalmia cement (B) Ltd. India, from Oct 1983 to May 1999 (15 years )

Project: Cement plant- Engineering/ project department activities.

Position: Junior Plant Engineer.

Participated in Technical club meetings.

Involved in field survey to prepare the drawings to modify / improve the existing cement plant.

Involved in preparation of piping layouts for de oiled rice bran.

Involved in supervision of Retrofitting of Pre-heater fan with drive.

Co-Ordinate with site engineering group during execution of the job.

Evaluate bids technically.

Involved in design of Belt conveyors, screw conveyors, elevators, air slides in cement plant.

Involved in preparation of detail drawings for Bulk handling system like Belt conveyors, Pneumatic pump, Air slide supporting structures, etc.,in cement plant .

Involved in preparation of detailed drawings for belt conveyor short supports, stringers,supporting structures in cement plant.

Involved in preparation of detail drawings for Blower pipeline, Process ducting, Air conditioning ducting in cement plant.

Having knoweldge of Rotating equipments like, Ball mill, Kiln, Vertical roller mill, Pumps, Belt conveyor, Process fan, Compressors.

Taking measrements for Gears,Pinions and reverse engineering for Gears, Pinions.

Taking measrements for V-pulleys, Cement Mill Lining Plates.

Having exposure in operation and maintenance.

S. Ravichandran



Contact this candidate