Resume

Sign in

Engineer Manager

Location:
Doha, Doha, Qatar
Posted:
August 29, 2018

Contact this candidate

Resume:

Page * of *

Address

Doha, Qatar

Email

ac6uui@r.postjobfree.com

Phone

+974-**-**-****

Date of Birth

**-**-****

Computer Skills

Advanced knowledge of

MS Office (Excel,

Word, Access, Power

point (creating and

modifying databases,

tables, queries and

forms; reports).

AutoCAD

SAP2000

Internet and mailing System

Water CAD

Sewer CAD

Computer maintenance

Personal Skills

Excellent

communication

Good leadership and

Team work capabilities

Good public speaking

and presentation skills

Decision Making

Time Management

Technical reports

Project scheduling

Strong communication

skills

Public relations

fast education

helpful

Client relations

work under stress

Ibrahim Abdulnabi

Civil Engineer

Summary

Seasoned and reliable Civil Engineer with Structure and Infrastructure (Wet Utilities) experience. Familiar with project’s requirement and specifications. Versed in Tendering, Engineering works, Shop drawing, as-built, Quantity Surveying, Procurement, and related works programme etc. also able to coordinate with various Construction & Technical Office teams professionally and effectively.

Education

B.SC. Civil Engineering 2006

Ain Shams University - Egypt

Faculty of Engineering - Civil Engineering department. Sanitary Works Graduation Project.

Experience

10/2015 to 06/2017

Technical Office Manager

Albawakir Unicon Company - Qatar ~ Infrastructure Dep. Responsibilities:

- Responsible for Engineering Works (Shop Dwg, Material Take-off, As-built Kahramaa GIS Dwg, Progress Drawings and Invoicing).

- Checking and approving final BOQ’s for submission to Clients and Subcontractors.

- Gathering Technical Specifications & Requirements for the project.

- Organize and handle the team for cost proposals preparation using BOQ and responsibility Matrix is as reference and incorporate it to the design and tendering process.

- Contact and coordinates meetings with possible subcontractors on projects that are not self-performed and needs specialties on their field.

- If requires, responsible to prepare project timelines/schedules for tendering stages.

- Communicates and liaise effectively with Management, colleagues, subcontractors, suppliers, consultants and concerns for the project.

- Follow up with Clients proposals (technical and commercial) till contract negotiations or job lost.

- Preparation of project budgeting and cash flow after the contract award along with order sheet and details proposals identifies how to complete the project within budget.

- Provides winnable and reliable cost estimation for small, medium & large Engineering, Structure & Infrastructure Projects.

- Responsible for preparing estimates (hours & cost). Page 2 of 3

Languages

Arabic (Mother tongue).

Very Good in English

Language (Spoken and

Written).

02/2014 to 08/2015

Technical Office Manager

Al MASHARIQ for Trading and Contracting - KSA

Responsibilities:

As Technical Office Manager

- Responsible for Engineering Works (Shop Dwg, Material Take-off, as-built Dwg, Progress Drawings and Invoicing).

- Contracting with suppliers and prepare supply schedules for each project.

- Preparing Submittals of Materials.

- Preparing schedules for projects and Work Plan.

- Coordination with insurance companies to prepare Insurance on projects.

- Extraction of work permits (national Water Co. System). As site Engineer

- Construction of Sewage Branch Lines using VC pipes and House Connections using UPVC pipes and delivery works to the Consultant step by step (Excavation, bedding, Pipe laying, Backfilling, Water Tests of Pipes and Asphalt Works. Also Manholes works of various sizes).

- Safety works.

- Management of Manpower and Equipment crews.

- Hold periodic meetings with Staff and Owner and Consultant.

- Preparing Weekly Reports to the Projects Manager. 08/2010 to 01/2014

Technical Office Manager

ECE Consultant – EGY

Responsibilities:

- Supervising the implementation of the:

Internal Plumbing Works of Resident Buildings and Villas.

Internal & Main Sewerage Networks and House Connections.

Internal & Main Water Networks with Fire Fighting System.

Main Irrigation Networks.

Sewage Lift Station.

Waste Water Treatment Plant.

Irrigation Pump Station.

Water Treatment Plant.

Potable Water Pump Station.

- Reviewing the Engineering Submittals (Shop Dwg., As-built Dwg. Variations, Materials, Invoices) submitted from the Contractors and specifying all technical requirements.

12/2008 to 04/2010

Site Engineer

Furat Consultant - KSA

Responsibilities:

- Supervising the implementation of Sewage Networks to the main lines and Branches lines. As well as working as a Technical Office Engineer to review the Drawings (Shop Dwg. And AS Built Dwg.) Submitted from the contractor and review the abstract and the preparation of weekly and monthly reports and follow up the primary delivery.

Page 3 of 3

11/2007 to 11/2008

Technical Office Engineer

Civil Works Company (CWC) - KSA

Responsibilities:

- Preparing shop Dwg & As-built.

- Review tender technical specifications & follow up all tenders status.

- Preparing variation orders through site visits to record information on claims/variation.

- Preparing survey sheets and as-built Dwg. for the completed works and Quantity Survey for all items to prepare the invoices & Bills. 11/2007 to 11/2008

Technical Office Engineer

Company: DYNAMIC Company - EGY

Responsibilities:

- Construction of Touristic Resort town in MARSA ALAM and also the execution of the residential buildings in CAIRO, where I was working in concrete and finishing works, also participate in the execution of the sewage plant in MENOUFIA and make Quantities Survey of the items.



Contact this candidate