C U R I C U L U M V I T A E

*. NAME : Liston Mangantartua.

2. MARITAL STATUS : Married.

3. RELIGION : Protestant.

4. EDUCATION : 1989 Graduated from Civil Engineering of Sriwijaya University, Palembang-Indonesia

5. OTHER COURSES

• International English Course, Palembang.

• Eimac Computer, Jakarta.

• Hot Asphalt Mixing, Dili, East-Timor.

• Safety Management Training, Singapore.

• Transport Management Course, Perth, Australia.

• Road Supervisory Training, General Public Work Dept, Jakarta

• More Precious Than Gold-Motivation Training, RAPP, Riau.

• Response to MarineOil Spills forFirst Responder

6. LANGUAGES

• Indonesia - mother tongue.

• English - spoken - good

written - good

7. PERMANENT ADDRESS :

Puri Tanjung Asri Estate

Mahoni Street No.2 RT 30/06

Bukit Sangkal - Kalidoni

Palembang- South Sumatera.

Indonesia. 30114

Cells : (062-***-**** 0984, (062-***-**** 5457

8. E- MAIL ADDRESS : ac6t5c@r.postjobfree.com

9. Skype ID : Liston262

10. Passport No./ Valid date : B 2666973 / 30 Dec 2020 11. EXPERIENCES, DETAIL OF JOB DESCRIPTION

1. March 2017 - present. Smec OCG Intern’l Consult. JV. As " Senior Civil Engineer " on Palembang Elevated Light Rail Transit ( LRT ) System Project, South Sumatera, Indonesia connect Sultan Mahmud Badaruddin II International Airport and Jakabaring stadium complex.

This project for supporting 18th SEA Asian Games 2018, regional sporting event, which consist of 13 stations, double track rails, 26 km long, and divided in 5 zones + crossing the big Musi River. The construction phase consist of: The foundation is made by piling concrete and bore piles, piles slab, while the column by architecture pier supporting by either precast beam or steel structural beam, concrete bridges, ramp, depo buildings facility as well. The 13 modern stations also supported by lifts, elevators, sky bridges and travelators to access the station and depot as well.

Responsible Design Manager on reviewing basic civil design drawings from contractor i.e. shop drawings, construction drawings, and as- built drawings, collecting weekly site reports, weekly coordination meeting, reviewing Material Specification used, reciewing Master Schedule, Method Statement from contractor, site field supervised, Controlling Interfacing work as well. Direct superior is Mr. Hideaki Shimizu, OCG Smec Intenatanional civil expert, ac6t5c@r.postjobfree.com, +81-90-984*-****, +62-813-****-****. Supervise own 10 inspectors, and co work with 5 contractor's resident engineers 2. Jan. 2014 – Dec. 2016. PT. Oiltanking Karimun /Singapore ( A Marquard & Bahls Holding Co. )

As “ Senior Project Engineer “ on Tank Storage Terminal at Teluk Paku, Karimun Island, Riau Island District, Indonesia and developing of OTCS's terminal and berths Jurong Island Singapore. Responsible to Senior Construction Manager on progress of project, which is consist of the following: Marine ;

Piling 402 points with PDA test.

Construct main trestle which combined of steel truss and concrete beam, installation of precast headstocks, flanges, slabs for roadway, pipes sleepers, stumps, cable tray. Construct Fire Pump Platform with boat landing staircase, handrail, fire water pump house. diesel engine, jetty substation, fuel tanks, battery bank, stand mounted panels. Construct Jetty, Tee Platform, 4 berths and 4 fenders with various size of vessel capacity, and largest size for 320.000 DWT, Elevated Column Gangway Tower, Fire Tower Monitors. Pole Mounted Lighting. Construct foundation for Jetty Equipment, such as : MLA-Marine Long Arm (16 Nos) and Gangways (4 Nos

)

Monitoring the dredging activities about 900.000 cum for new Access Channel, controlling dumping area and Navigation Aids Installation.

Onshore;

Construct 32 Nos of storage tank farms (13.000 MT)with terminal working capacity 718.000 KL, and Shell capacity 760.000 Cubic Meter.

Construct Sand Pad Foundation.

Construct Terminal Piping (480.000 IM), Jetty Piping (360.000 IM), Fire Fighting (140.000 IM), Pumps (85 Nos)

Construct road (2,8 km), dyke wall ( 2,4 km ), culverts, drains, pit, paving and terminal facilities buildings, such as Admin Building, Clinic, Workshop/Maintenance Building, Store and Laboratory, and Guard House. Direct superior is Mr. Steven Goh, Oiltanking's Construction/ Engineering Manager, ac6t5c@r.postjobfree.com, +65 9661 5740

Supervise own 5 supervisors, and co work with 8 contractor's area superintendents. 3. March. 2012 – Dec. 2013 . PT. Media Djaya Bersama ( ABM Group ). As “ Construction Superintendent “ on Meulaboh, West-Aceh. Responsible to Project Manager on budget and progress of the project, which is consists of the following:

Minesite;

Construct coal processing plant that will ultimately handle 16 million tons a year. Construct 100man camp with all support facilities. Construct Office facilities for 100 personnel

Mine Site to Port Site;

Construct 12.4km haul road, bridges and conveyor ROW for future conveyor. Port site (32 hectare);

Construct trestle/ jetty, conveyor to barge loading facility 1.2 km offshore. Construction of Coal Stockpile with stacker / loader and connecting conveyors Construction of Camp, Offices, Workshop/Warehouse, Power Plants, water well and distributions systems.

Control Room

Above facilities sub-contracted to several contractors Provided survey support for an ongoing land acquisition effort. Coordinated the facility layouts to fit within current boundaries of purchased land. Identified and justified additional land requirements as required. Supervise and support for the civil works to include; rerouting two water courses, removal of 150,000m3 of topsoil and vegetation .Dredge, transport, distribute and level 400,000+m3 of sand to elevate site above sea level.

Direct superior is Mr. Bill Huddle, ABM's Construction Manager, ac6t5c@r.postjobfree.com, +62-813-****-****

Supervise own 5 supervisors, and co work with 3 contractor's superintendents 4. Sep. 2010 –Sep. 2011 . PT. Saipem ( ENI Group ) As " Project Engineer " on Karimun Island, Batam District Responsible to Project Manager on EPCM’s budget and progress of piling works. Foundation of Heavy and Light Civil Work, Main Jetty, Service Jetty, Pre- Fabrication Workshop Building, Piping Workshop, Project Store Building, Assembly Hall Building, Housing and Office Building. Controlling material and tools received, equipment used, master plan, daily progress. Direct superior is Mr. Bricco M Chico, Saipem's Package Manager Supervising 2 superintendents 6 supervisors.

5. March 2010 – Aug. 2010. PT. AMYTHAS Expert Consultant. As " Civil Foundation Engineer " on 2 x 100 MW Power Plant,Nagan Raya, Meulaboh, Nangroe Aceh Darussalam.

Responsible to Project Manager on EPC’s budget and progress of piling works of Turbine’s, Boiler’s, ID Fan’s, Chimney’s, Flue Support’s, foundation, pile cap concreting, jetty and facilities, Ash Pond, Coal Yard, steel structure construction, drainage, culverts, road, chemical water treatment. 6. Jan. 2009 – Feb. 2010. PT. Star Emmsons Indonesia ( ETA Star Group Dubai ). As " Project Manager " on Muaraancalong, Busang, East-Kutai District, East Kalimantan. Responsible to Director on budget and progress of Legality, CSR, overlapping aspect, coordinate with Local government, drilling plan, geoscan data, topography data, mining plan, jetty plan, hauling route road line, camp and facilities plan.

7. Nov. 2000 – Dec. 2008 PT. PEC TECH INTERNATIONAL( Raja Garuda Mas Group). As " Construction Coordinator/ Manager " on Main Jetty, Ro-Ro, Trestle, Feet Conveyor Foundation, of Kutai Chip Mill Project, Teluk Waru, Balikpapan, East Kalimantan. Responsible to Project Manager on progress, schedule of heavy equipments usage on piling, concreting, temporary jetty, temporary laydown area, barge and cranes handling, precast fabrication, delivery, and erection.

On Landfill Remediation Phase 2 & 3 Project, Bio Sludge Building and Tank on RAPP Mill, Pangkalan Kerinci, Riau, Indonesia.

Responsible to Area Manager on budget, schedule, progress, schedule of heavy equipments usage on hauling and spreading imported soil laying on the waste/sludge, method of environment concept e.q : geomembrane, geotextile, gas vent, leachate pipe, seepage pipe installation and Bio Sludge Building on pouring concrete, tank steel structure, roofing installation.

On Toba Pulp Lestari Start Up Maintenance Project, Porsea, North Sumatra Province. " Responsible to Project Manager on budget, schedule, progress, schedule of manpower, welding steel structure, brassing, tie beam steel structure, of Chemical Building, Digester, Power and Recovery Boilers, WSB Buildings, CNCG and DNCG Steel Structure Building, Settling pond and Emergency Ponds. On Access Road to Buatan Port, Langgam - Cerenti Road, Logging Road Maintenance Road Project, located on Kampar, Pangkalan Kerinci, Riau Province." Responsible to Road Department Manager on budget, schedule, progress, schedule of manpower, heavy equipment usages s.q : Recycling Cement Stabilized Pavement Machine, Jet Patcher Machine, material usages and cash flow."

8. Aug. 1999 - Nov. 2000. PT. CIRIATAMA NUSAWIDYA CONSULT, Jakarta. As " Quantity Engineer " on Cikokol Fly Over and Highway Road, located on Cikokol, West Java Province."

Responsible on organizing a team player on all of material used sq : concrete, reinforcing steel, column and other supporting materials, weekly progress report, monthly certificate. As " Team Leader / Construction Manager " on Road and Bridges Rehabilitation Project, SPL OECF INP - 23, located on North Sumatra Province.

Responsible on organizing a team player to supervise road and bridges construction, coordinating with local government, technical advisory, progress report and final report. 9. March 1998 - Jul. 1999. PT. HINDOLI ( A Cargill Group ), Jakarta. As " Infrastructure Manager " on Palm Planting Area, CPO Mill, and housing area, located in Sungai Lilin, Muba, South Sumatra.

Responsible on design, estimate engineer, budget control, contract agreement, supervision of all civil constructions such as : survey of new land, GPS, maps, main and collection road, timber bridges, box- culverts, access road to Mill site, earth works, heavy equipment usages and other civil activities. 10. May 1995 - Feb. 1998. PT. Freeport Indonesia, Timika, Irian Jaya. As " Civil Engineer - Ass. Infra Dev. Manager " on Housing and Hospital Town Site Complex Newtown Kuala Kencana Real Estate Project, and on Tailing River Management Project

( TRMP ), Timika, Irian Jaya.

Responsible on all civil construction's progress schedule such as : foundation, concrete delivery, reinforcing steel installation, access road Timika - Kuala Kencana, supervising sub - base, borrow pit resources, excavation, compaction, base courses, grading, earthwork, ditches, drainages, cheap sealing, asphalt mixing, control and design utility work’s elevation where road construction located : electrical manholes, telecommunication panels, traffic signs and lights, culverts, timber bridges, landscaping on golf hill area, heavy equipment usages, and on tailing river management project. 11. May 1994 - May 1995. PT. HASFARM DIAN CONSULT, Bandung. As " Quality and Quantity Engineer " on ADB XIII Loan Road Sector Project Package K - 16, Bangka Island.

Responsible on all field data collecting of existing road, supervising road construction, monthly certificates, drainages, job mix design, monthly quality and quantity reports. 12. Feb. 1993 – Apr. 1994. PT. RAYA CONSULT, Bandung. As " Quantity Engineer " on ADB XI Loan Road Sector Project Package U - 65, Baucau - Laga - Lautem, Timor Leste"

Responsible on all field data collecting of existing road, and processing design thickness, estimate engineer for review design, contract change order, monthly certificates. 13. Sep. 1992 - Jan. 1993. INDEC Associated Ltd, Consultant, Bandung. As " Soil Material Engineer " on 19 - Province Urban Road Design Project along Bangka Island, and 40-Towns Inter Urban Road Design Project along East Java and Bali Island." Responsible on all field data collecting of existing road, and processing design thickness. 14. Feb. 1990 - Aug. 1992. PT. Tripod Asi, Denpasar, Consultant, Bali. As " Supervision Engineer " on Road and Bridges Betterment Project on Tanjakan Bantas, Antosari - Pulukan, Bali, and on District Road and Bridges Betterment Project on IPJK Dati II Badung, Bali. Responsible on supervising overall road construction, covering pavement, earthwork, drainage, steel bridges, retaining wall, progress schedule, contract change order. 15. Nov. 1988 - Dec. 1989. F.F. Cruz Ass. Mada Atesu Corp., Jakarta. As " Site Engineer " on 2nd IBRD Highway Betterment Project Package Lahat - Sp. Air Dingin - Bandar, Lahat, South Sumatra.

Responsible on overall road construction, material resources, manpower, heavy equipment.