CURRICULUM VITAE

POSITIONS OF INTEREST: Senior Inspection Engineer, Senior Mechanical Engineer, Superintendent, Manager, QA/QC

Name: PHILIP D. YBARLEY

Date of birth: 10 July 1956

Marital Status: Married

Number of children: 5 kids

Will be on: Married Status or Single Status

Nationality: Filipino

Passport no: EC4310799 Expiry Date: 02June, 2020

Gender: Male

State of health: Excellent

Availability: anytime when hired

Salary present: last employment with basic salary plus O/T and allowances with everything free and provided including personal service vehicle, food and accommodation (single occupancy)

Salary expected: (negotiable)

Permanent Address (c/w Tel/Fax/Email contacts)

Purok 6, Balugo Valencia

Negros Oriental, Philippines

Tel: +63 (0-974*******, +63 (0-920*******

Email: ac6crm@r.postjobfree.com

References:

1. Mr. Brian K. Ashworth

Unit Team Leader/ CHEM II (ISOCYANATES)

SADARA PROJECT, Jubail 2, KSA

Email:ac6crm@r.postjobfree.com

Tel. +966 (0-505****** or 001*-*****-**** (US)

2.Mr Mohammed SarifUddin Ahmed

Team Leader PMT SMP Inspection

AL HUGAYET / SATORP Project

Jubail 2, KSA

Email: ac6crm@r.postjobfree.com

Cell no.: +966-*********

3. Mr. Aurel Mares

PMT Commissioning Rotating Supervisor

Saudi Aramco Total Refining & Petrochemical Company (SATORP)

Package 2B, Acid Gas Treatment

Tel. +966 (0-503******

Email: Aurel.Mares@satorp .com

4. Mr. Ulysses G. Alcala

Civil Superintendent (PMT)

Saudi Aramco Total Refining & Petrochemical Company (SATORP)

Tel: +966 (0-530******

Email: ac6crm@r.postjobfree.com

Safety Trainings:

H2S AWARENESS TRAINING

RAWABI UNITED SAFETY

Manifa, KSA

May 17, 2009 (one year validation)

First Aider

ABV ROCK GROUP KB/SSSP Project Site 5 Clinic

Barah, Jeddah, KSA

Oct 22, 1997

Safety Induction Course including Fire Theory & Practical use of Fire Extinguishers

ABV ROCK GROUP KB/SSSP Project Site 5

Barah, Jeddah, KSA

Sept 13, 1997

Proper Use of Self Contained Breathing Apparatus (SCBA)

DYNO WESFARMERS PHILS., INC.

Bacong, Negros Oriental, Philippines

Sept 24, 1994

Introduction to Modern Safety Management and I.S.R.S

DNV-DYNO WESFARMERS PHILS., INC.

Bacong, Negros Oriental, Philippines

15-16 June 1994

Safety Seminar

The Swagelok Companies

Bacong, Negros Oriental

15 Nov. 1991

Fire Brigade Workshop

Life Safety Consultants Phils., Inc.

Bacong, Negros Oriental

Feb 15, 1987

Other Trainings:

OSHA 30-HOURS FOR CONSTRUCTION SAFETY AND HEALTH

(January 25, 26 & 27 2016, Yanbu AL-Bahar, Kingdom of Saudi Arabia

Registration Number: 34-601******

LIQUID PENETRANT TESTING (LEVEL II)-NDE/060913

(ASNT SNT-TC-1A-2006), 6 DAYS TRAINING

GLOBAL NDT & INSPECTION SERVICES, KSA

LTRASONIC TESTING (LEVEL II)-NDE/060914

(ASNT SNT-TC-1A-2006), 7 DAYS TRAINING

GLOBAL NDT & INSPECTION SERVICES, KSA

RADIOGRAPHY TESTING (LEVEL 11)-NDE/060915

(ASNT SNT-TC-1A-2006), 12 DAYS TRAINING

GLOBAL NDT & INSPECTION SERVICES, KSA

MAGNETIC PARTICLE TESTING (LEVEL II)-NDE/060916

(ASNT SNT-TC-1A-2006), 6 DAYS TRAINING

GLOBAL NDT & INSPECTION SERVICES, KSA

Pressure Testing-New ITS Inspectors

Saudi Aramco Training Facilities

Dahran, KSA

09-11 Sept 2006

Radiographic Film Quality Assessment (RTFI) SAP BET ID 40036509

Saudi Aramco Training Facilities

Dahran, KSA

20-22 Aug 2006

Positive Material Identification (PMI)

Saudi Aramco Training Center

Dammam, KSA

14 Aug 2006

Care & Maintenance of Rolling Bearings, (FAG)

DYNO WESFARMERS PHILS., INC.

Bacong, Negros Oriental, Philippines

2 June 1995

Completion of BagongSigla: Quality of Work life Program

Training Systems Associates, Inc. .

Makati, Manila Office, Philippines

2-4 Mar 1995

Supervisory Development Program

Training Systems Associates, Inc...

Makati, Manila Office, Philippines

29 Sept to 1 Oct 1994

ISO 9000 5S

Edwin Perez & Associates.

Dumaguete City, Negros Oriental, Philippines

22 Jan 1994

Records Management

Edwin Perez & Associates

Dumaguete City, Negros Oriental, Philippines

7-8 Jan 1994

ISO 9000 Documentation

Edwin Perez & Associates

Dumaguete City, Negros Oriental, Philippines

11 Dec 1993

Orientation

Edwin Perez & Associates

Dumaguete City, Negros Oriental, Philippines

4 Nov 1993

ISO 9000 Quality Management System

The Philippine Trade Training Center & the Bureau of Product Standards

Pasay City, Philippines

30 July 1993

Vibration Technology II (VT-II) – Special Analysis Techniques for Complex Machinery Vibration

IRD Mechanalysis, Inc.

Makati, Philippines

18-21 May 1993

Vibration Technology I (VT-I) -Vibration Analysis & balancing procedures

IRD Mechanalysis, Inc.

Makati, Philippines

17-18 May 1993

The Latest SPM Technology on Bearings Condition Monitoring Systems and Softwares

UP-TOWN Industrial Sales, Inc.

Cebu City, Cebu, Philippines

29 Oct 1990

SKF Bearing Technical Seminar

F.E. Zuellig (M), Inc.

Bacong, Negros Oriental Philippines

2 June 1987

TTS on Plant Mechanical Handling Equipment-TOPAN

NOBEL Philippines, Inc

Bacong, Negros Oriental, Philippines

8 June 1987

Pipe Fitter/Steel Worker

Engineering Equipment, Inc. (EEI) Skill Training Center

Cebu City, Cebu, Philippines

20 Apr-26 June 1981

Studies Taken:

Tutorial users course in DBASE III Plus

STI Computer Education

Dumaguete City, Negros Oriental, Philippines

18 Mar-20 Apr 1993

Tutorial users course in WordStar

DIGITAL DATA SYSTEMS

Dumaguete City, Negros Oriental, Philippines

10 Oct-22 Dec 1989

Tutorial users course in dbase III

DIGITAL DATA SYSTEMS

Dumaguete City, Negros Oriental, Philippines

14 Aug-7Oct 1989

Qualifications:

Bachelor in Mechanical Engineering, BSME 14 October 1978

Cebu Institute of Technology, Cebu City, Cebu, Philippines

Career Summary:

Expertise in the fields of Mechanical Engineering with solid track records in: 1) Chemical Plant-operation/maintenance/inspection/repair/troubleshooting (rotating/static units), planning & supervision, material P.O., documentation/reporting, problem identification/solution, erection/installation, 2) Oil and Gas, Petrochemical Refinery Upstream & Downstream Piping, Power Plant Piping, Chemical Plant-construction/inspection, consultancy, commissioning, material receiving verification and documentation/reporting, problem identification/troubleshooting & analysis/solution, testing/certification, erection/installation (rotating/static/piping/structural), witness/verification, line checking/punch listing.

Experience:

In summary:

10 years in Chemical Plant Operation & Maintenance/Engineering, plant shutdown

20 years in Oil and Gas/Petrochemical Construction/Inspection/Maintenance-, Renovation, Erection, Installation, Testing and Engineering

2 years in other fields (mining, civil works-irrigation, textile industry, sewage

treatment plant, fabrication, power generation, office documentation)

32 years total work experience

In breakdown:

Feb. 01, 2015 DOW SADARA PROJECT / AL HOTY Co., Ltd.

Feb. 15, 2016Jubial 2 Industrial City, KSA

Mechanical Inspector / UPI DIRECTORATE

Re-assigned to other asset due to work requirements.

Involve in the monitoring, investigation and trouble shooting

of construction and Pre-commissioning problems. Assigned in the

Waste Treatment Plant. Coverage of activities will involve all

discipline including, mechanical/piping/structural. Perform site

inspection/document verification and monitoring of on-going

activities for construction and pre-commissioning to avoid

system failure and occurrence of defective facilities during start

-up and operation.Signing of reports for Dossier.

Demobilized / Project Completion.

May 01, 2013 DOW SADARA PROJECT / AL HOTY Co., Ltd.

Jan. 31, 2015Juabil 2 Industrial City, KSA

Mechanical Inspector / CHEM II (ISOCYANATES PLANT)

Perform Inspection as well as Engineering and Construction

services to DOW SADARA. Closely monitor construction erection

and installation activities with quality application based on

SADARA specs, international standards, Schedule “Q”, and

construction drawings.

Assignment involves: document/design review, material receiving

inspection/verification, material preservation including static &

rotating, erection & installation of U/G & A/G piping, structural

members, storage tank for CS & SS, static & rotating units

including solid handling units, screening of Contractor personnel,

safety application on site, witness/ approval of tests, supervision,

direction, recommendation &consultancy, submittal of Highlights,

LBE, NCR, weekly report, equipment preservation. PMT coordination

with on-going accomplished and rejected activities.

Perform other activities: welding &coating inspection, verification,

rejection& approval, witness on site NDT activities & sign reports.

Feb 20, 2010 to Saudi Aramco Total Refining & Petrochemical

April 30, 2013 Company (SATORP) / AL HOTY Co., Ltd.

Jubail 2 Industrial City, KSA

Engineer III (Sr. Mechanical Inspector)

Render Inspection as well as Engineering and Construction

services to SATORP. Closely coordinate with assigned Project

Engineer & Contractor QC to keep track of activities complying

with required Standards and Construction drawings/procedures

as well as Schedule “Q”.

Deputized to work as Engineer III (Sr. Mechanical Inspector)

for SATORP covering Mechanical activities involving TCF

Temporary Construction Facilities) which includes: buildings

and offices, Waste Water Treatment Plant, HVAC and piping/

plumbing.

Plot 9 activities covers: 5B Package (Plant Utilities) under SKEC,

contractor and 2B Package (Acid Gas Treatment) under

DAELIM, contractor, 4 Package (Delayed Coker Unit) under

Chiyoda Petrostar Samsung Saudi Arabia. Mechanical

activities covered: document & design review, material receiving,

welder qualification test and card issuance, personnel

review and acceptance, erection and installation, coating,

punch listing and line tracing, testing and acceptance,

test package closure, problem identification/trouble-

shooting/rectification, commissioning and acceptance.

Assignment includes monitoring/supervision erection/

installation/testing and acceptance of: Structural Steel,

AG/UG piping/plumbing, HVAC systems/equipment,

structural welding and coating including civil

requirements, pressure test, pre-commissioning and acceptance,

problem identification, reporting, document review, static/rotating units.

Demobilized to next project assignment.

May 28, 2006 to Saudi Aramco Upstream/Downstream Piping for KGP/

October 15, 2009 KPF Oil & Gas Refinery / Pipeline Maintain Potential / AL

HOTY Co., Ltd. Khursaniyah/Abuhadriyah/Manifa, Jubail,

KSA

Sr. Project Inspector-Mechanical

Provide QA/QC functions as well as Engineering and

Construction standard practices for mega Projects to ensure

Contractor’s quality program and processes are effective,

and that new facilities are constructed in compliance with

applicable Company and Industry engineering standards,

and Company policies and procedures are followed.

Deputized to work with Saudi Aramco and performed

the following activities: provide quality functions

by performing direct point inspections in the Field, (RFI &

surveillance based, reviewing and validating tests results

related to inspection points, reviewing and approving

project and contractor quality documents and quality

personnel, ensuring contractors compliance with Saudi

Aramco mandatory documents on capital projects,

Interpreting and improving technical requirements for

Saudi Aramco and Contractors by reviewing standards and

procedures, providing quality assurance and control

mechanisms for all related projects).

Working in close coordination with PMT and Contractor QC

and provide advice and instructions in form of recommendation

Assignments were more on Plant Piping, Pipeline Piping, shop

fabrication, erection/installation, documentation, punchlisting/

line tracing, testing/certifications, commissioning.

Assignments: Khursaniyah – Maintain Potential Pipeline, well head piping

Khursaniyah – GPF & KGP Oil and Gas Plant Refinery

Abuhadriyah – Pipeline, well head to plant tie-in

RazZawr - Pipeline

Fadili - Pipeline, well head piping

Manifa - causeway bridge, offshore piping, piles fab.

Dec. 17, 2004 to Saudi Basic Industries Co. (SABIC) Shared Services (SSS)

Dec. 14, 2005 Dar AL Riyadh Consultants, (CSSD) Jubail 1 Industrial City,

KSA

Inspection Engineer (Project Site Inspector)

Assigned to work with SABIC mother unit as Insp. Eng’r., the

main task was to conduct project site inspection that were

related to: expansion, modification, maintenance, erection

and installation and revamp projects for Mechanical/Piping

facilities. Implement SABIC Project Quality requirements and

procedures are to be followed and all test, installation,

inspection and design requirements are executed and

performed based on the Inspection and Test Plan &

Construction drawings.

Duties and functions similar to a Project Engineer/

Superintendent with additional QA/QC responsibilities.

Conducts quality audit on project sites based on inspection

boundary matrix and section QA/QC responsibilities and

offer advice/recommendations to improve and follow standard

construction requirements.

Aug. 24, 2004 to IBN ZAHR Saudi European Petrochemical Co., (one of

Sept. 24, 2004 SABIC affiliate Companies) / Dar AL Riyadh Consultants,

(CSSD) Jubail 1 Industrial City, KSA

Inspection Engineer/Consultant

A Total Complex Turn Around Project (TCTA 2004) and

was working under the Reliability Dept. Mechanical

Section-Rotating-Plant Shutdown Maintenance activities

as Inspection Engineer/Consultant

The job was on 24 hrs work with two (2) shifts. Assigned

for night duty straight for 12 hours work per day. The

main work assignment was in PP I and PP II plant

(Propylene Plant). Other work assignments was at the

hydrojetting yard, internally cleaning the turbine blade

parts and checking for any oil leakage during the test run

for the oil pump for GE turbine unit in the MTBE plant.

Main scope of work was to render inspection and

consulting services to the maintenance crew who were

performing maintenance activities like: repair, overhauling,

conditioning, assembly and installation and test run.

Monitored and evaluated vibration test results for Gas

Compressor as well as witnessed alignment of couplings

of other rotary units and dimensional check for rotary

compressor cylinder head.

Recommend complete replacement of internal parts for

mini gearbox which was running dry and parts totally

worn out/damage and to modify casing to provide access

for oil to be added during operation.

June 10, 2003 to Saudi Aramco Berri Gas Plant Refinery expansion

Jan. 15, 2004 Project, TPSA-Technip / GAMA AL MOUSHEGAH

ARABIA Ltd., Jubail, KSA

QC Static and Rotating Mechanical Inspector

1) For early works-assist main contractor in the test

run and pre-commissioning activities for rotating

equipment as well as troubleshooting and rectification

when problem arises.

2.) For erection and installation of on-going activities,

check and inspect pre-installation requirements for both

static and rotating equipment. Also verify, inspect and

witness initial alignment and final alignment of rotating

units. Inspect and review the design and installation of:

piping, structural (supports), major equipment rotating/static/columns/heaters/coolers, etc.) and scaffoldings. Prepare and submit all necessary documentation especially inspection reports.

June 13, 2002 to Saudi Aramco Refinery expansion Project Neat Khuff

Jan. 31, 2003 Condensate Fractionation Plant-Snamprogetti /

DODSAL & Co., RasTanura, KSA

Lead Mechanical QA/QC Inspector

In Coordination with QA/QC Manager, prepares site

assignment and distribution of manpower. Conducts

field inspection and verification for the erection and

installation of pipe spools, pipe supports at pipe racks

and columns, pressure vessels, rotating and stationary

equipment. Together with the client conducts joint final

inspection and acceptance of flange tie in connections and

prepares inspection and acceptance documents. Conducts

line tracing and punch listing of welded and threaded

piping above ground. Review and verify for correction of

technical documents and GA drawings. Troubleshoots and

recommend solutions to problems for piping construction.

Prepares and submits monthly accomplishment

activities report including technical query and

surveillance reports.

Award: Star Performer Certificate - 17 Jan. 2003

Sept. 10, 1997 to SSSP Project Hydrocarbon Storage Facilities for Oil &

Sept. 9, 2001 Gas products,(Saudi Aramco) ABV ROCK GROUP KB, Site 5,

Jeddah, KSA

QC/MC Supervisor

A mega project for Saudi Aramco, the Construction of

Hydrocarbon storage facilities for oil and gas products.

First six months was assigned as Assistant Piping

Supervisor, supervising several piping erection/installation

of various diameters in pipe racks and tie-in to equipment

and plumbing activities including sprinkler systems for fire fighting.

Later was absorbed under QC Department and performs:

verification and troubleshooting of installed items like:

piping (product/utility lines, fire sprinklers, plumbing)

structural and supports, HVAC equipment/ducting/supports,

structural ladders, rotating/static and package units, Verify

and witness testing of piping and storage tanks. Performs

line tracing and punch listing. Closes job packages and

review GA drawings for as-built.

Last stages of the project was absorbed in the Engineering

Department to perform site verifications for as-built of the

GA drawings.

Sept. 1995 to Maintenance Support Group for Oil and Gas

Jan. 21, 1996 Production Facilities

National Company for Mech’l and Elect’l Works

(W.L.L)Safat. 13101 Safat, Kuwait

Senior Mechanical Technician

Monitor rotating equipment status and performance by

collecting vibration and other data in the Oil and Gas

production sites using IRD 838 instrument. Assist

in setting up borescope inspection of diesel engines

cylinder heads. Witness the hydrotest of valves in series

formation at Fabrication testing sites.

Performed spare parts expediter for the Maintenance-

Overhauling group during free time.

June 18, 1995 to Textile Co. (IBN RUSHD) Completion stages of

July 19, 1995 Construction Arabian Industrial Fibers Co., (IBN RUSHD)

Yanbu AL-Sinaiyah, KSA

Rotating Equipment Inspector

As support group for the maintenance activities of

the nearly completed Polyester Plant was assigned to

witness and submit daily report of observations of

subcontractor and equipment vendor technician

conducting field balancing of fans and blowers by

taking vibration readings using IRD 838. Assist in

conducting field inspection of static equipment by

checking internal & external conditions of pressure

vessels prior to test run.

Mar. 5, 1985 to Dyno Wesfarmers Philippines, Inc. (formerly Nobel

June 15, 1995 Philippines, Inc.) - a chemical plant producing nitric

acid solution and ammonium nitrate prills and

crystalline, Bacong, Negros Oriental, Philippines

Preventive Maintenance and Planning Engineer

Working under the Maintenance Department,

Mechanical Section and in coordination with Electrical

and Instrument Sections, performs daily routine field

visual inspections during Plant Operation and record

discrepancies and defective/damage units/ items and

abnormal equipment/machinery performance and

prepare work permit per discipline to be done during

operation or during shutdown schedules.

For verification on rotating equipment performance,

prepared schedule for collection of vibration data on

regular basis for normal operating units. For abnormal

units monitoring, was performed frequently depending on the

status of the vibration results using IRD 838 analyzer

instrument. If the need for repair or replacement is required

an emergency Plant short shutdown is requested in

coordination with the Plant Manager and Maintenance

Manager after having analyzed the results.

On shutdown schedules, have my own team to supervise and

hands on in conducting repair/PMS and conditioning

maintenance.

Other duties performed: Supervise the yearly painting

& lubrication activities, prepare/update and maintain the

Maintenance Program and imposes the planned preventive/

breakdown and conditioning maintenance on the three

sections. Update the history records for all units/equipment

including Electrical and Instrumentation, including civil

works, service vehicles, AC units, pier facilities, buildings,

offices, plant facilities & warehouses. Submits weekly

reports, and was document controller. Conduct materials

inventory at stock room, and prepares/submits PRO. Hands

on in the maintenance activities as well as in the collection of

vibration data and analysis and equipment troubleshooting,

performs NDT activities and evaluation, Vehicle preventive

maintenance inspection

Scope of inspection and maintenance work covers pier

facilities/equipment and structures, entire Plant inside and

outside including storage tanks, piping, vessels, columns,

stack, valves, cooling tower, plant utilities, gen. set, offices,

warehouses, other buildings, prepare procedures during ISO

certification. Witness in the Plant commissioning during start

up and performs steam leak tests and repair/clean up after

shutdown. Main units include: solid handling, rotating/static.

Award: Good Performance Certificate–02 Mar–30 June, 1987

Sept. 24, 1982 to Geothermal Cross Country Pipeline for the steam

Dec. 31, 1983 gathering and generation project Philippine National

Oil Company Palinpinon, Ticala, Valencia, Negros Oriental,

Philippines

Mechanical Engineering Inspector

Monitor the erection and installation of cross country

piping both site and fabrication shop. Re-evaluated the

radiographic test results submitted by Third Party NDT

Contractor as well as evaluate the film quality submitted.

Sort and file radiographic films for documentation. Advice

contractor in the repair and cut out of joints based on x-ray

results. Witnessed and inspected pre-qualification test of

welders. Coordinated with NDT Contractor for purposes

of their monthly billing.

Aug. 03, 1981 to Chemical Plant Construction

Apr. 03, 1982 Engineering Equipment, Inc. (EEI)

Field office: Bacong, Negros Oriental, Philippines

Quality Control Engineer Trainee

Conducted field inspection and NDT activities during the

construction of a chemical plant for piping, pressurized

and atmospheric tanks and equipment installation.

Other duties: conducts visual inspection for pressure piping,

storage tanks and equipment/accessories. Performs NDT:

x-ray for pipe and tank shell, holiday test, diesel test,

vacuum box test, picking and bonding, dye-penetrant test.

Witness welder’s pre-qualification test. Prepares

radiographic films and evaluated results together with client.

July 28, 1980 to Civil Project for construction of irrigation systems for

Oct. 03, 1980 the countryside Demerre Construction (small private

Contractor), Sta. Catalina, Negros Oriental, Philippines

Construction Supervisor

Supervise labor during the use and maintenance of the

concrete vibrator as per manufacturer’s recommendation.

Prepares estimate and compute the total volume

of concrete works accomplished for billing purposes.

Verify concrete mixtures and material stocks like:

gravel and sand and makes requisition when the

stocks are low.

Prepares the payroll and was the paymaster for the labor.

July 10, 1979 to Copper Mining Industry

Mar. 31, 1980 CDCP Mining Corporation

Basay, Bayawan, Negros Oriental, Philippines

Enercon Engineer

Conducts educational campaign to mining residents on

theEnercon Program of CDCP and monitor the current

consumption of electric and fuel products utilized with

respect to production output. Conducts field and house to

house inspection and educational campaign.

Conducts field inspection for the handling, disposal and

Storage of fuels and lubricants. Monitor consumption of

the said items including oil analysis to prevent unnecessary

waste and find means to utilize waste products. Introduce

card system in fuel distribution for service vehicles &

others. Prepares statistical reports every end of the month

for presentation to the organization by the chairman.

HE & LE shop maintenance /servicing / preventive maintenance

monitoring activities



Contact this candidate