Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
India
Posted:
July 20, 2018

Contact this candidate

Resume:

Jan **** - July ****

July **** - Dec ****

** ******

ASHUTOSH TIWARI

Vill-Hariharpatti, Post-Tekuatar, District-Kushinagar 098******** ac6ch8@r.postjobfree.com

CAREER OBJECTIVE

To achieve success through hard work and dedication while striving to effectively contribute to the growth and development of organisation by practicing good work ethics leading to the job satisfaction and wholesome growth.

EXPERIENCE

Zuberi Engineering Company

Sr. Engineer

* Project planning and coordination, Hydrotest of HDPE pipe line and DWC pipeline, Erection of Manhole, Circular ring, IC Chamber and commissioning of sewage and water pipe line. Zuberi Engineering Company

Site Engineer

Supervision of construction work, control, coordination & monitoring, ordering, Fabrication, Erection, Rail line alignment and installations, Rail line Grouting. EDUCATION

Uttar Pradesh Technical University Lucknow.

B.Tech (Mechanical Engineering)with 74%

2013

Govt. Jubilee Inter College Gorakhpur Uttar Pradesh India Intermediatewith 62%

2008

TECHNICAL SKILLS

LANGUAGES : AUTOCAD. SOFTWARES : MS Word, MS PowerPoint, MS Excel. OPERATING SYSTEM : Windows (XP, Seven).

PROJECTS

WATER SUPPLY AND WASTEWATER PROJECT, Sri Ganganagar Rajasthan.

* Qualified B.Tech in Mechanical Engineering, Having 5 Years Professional experience in Project Execution, Control, Planning, coordination, monitoring of Integrated Water Supply and Waste Water Project work.

*Coordination with clients, settlement of various techno- commercial, liasoning with clients 30 Months.

for various documentation, ensuring the compliance of contractual obligation, collection of outstanding from client.

*Erection of M40 grade Precast manhole (Type A,Type B & Type C), Precast circular ring of different diameters & thickness, Inspection chamber ( Height 600mm & 900mm) as per drawing and as per site requirement.

*Commissioning of sewage network of different diameters 200mm & 300mmetc, water supply pipeline network of diameters 75mm, 90mm, 110mm etc.

* Hydrotest of DWC Sewage pipeline of different sections as per drawing & HDPE water pipeline by use of coupler, reducers, dummy, pressure reducing valve, elbow etc at pressure 9 KG/CM2.

*Scraping of bituminous & granulars, Earth work excavation for Sewer line trenches, Manhole, DWC pipeline laying of diameter 200mm, 250mm, 300mm, bedding & haunching of aggregate, Hydrotest, Backfilling, housekeeping.

*HDPE pipe laying of diameter 75mm, 90mm,110mm as per drawing.

*PCC & Benching according to depth of Type A,Type B & Type C manhole, Erection & fixing of manhole, circular ring, Inspection chamber as per drawing, Leak test of Manhole.

*Proper co-ordination, monitoring & follow up with various departments (Civil, Mechanical, Electrical, Instruments and commercial etc) for the project progress and resolve the issue.

*Planning for the sequential and priority wise Erection with quality and safety.

*Review of various drawing, contracts docs, various data sheets, Inspection of the equipment at vendors places.

*Prepare DPR, MPR giving due impetus to the critical activity & issues, highlighting the area of concern.

*Preparing and monitoring project cost, preparing monthly Project cost, preparing monthly quarterly & yearly budgets, Reviewing the bill of contractors and making measurements. 2*660 MW Super Critical Thermal Power Plant Suratgarh Rajasthan.

* Supervision of construction work at site for quality, safety and progress, Facilitating the contractors for uninterrupted work at site resolving the bottleneck.

* Project planning, scheduling & monitoring on MS Project, Review interaction and follow up with vendors & contractors, follow up for the materials as per schedule.

* Fabrication & casting of concrete counter weight for Stacker Reclaimer & Reclaimer as per drawing in coal handling plant.

*Railline Erection, alignment, fitting, angle making at civil expansion joints & Thermal expansion joints, Rail foundation plate bolt Grouting by GP2 cement as per drawing.

* To Reviewing of welding procedure specifications, check out defects in welding (Electrode welding & Gas welding) & check out pipe welding by hydraulic test visual inspection carried before and after welding operations.

* Assist in basic & details Engineering of various packages like boilers, TG, AHP, CHP & WTP.

* Systematic documentation of drawings & docs of various packages.

* Timely submission of reports daily, weekly & monthly (M/S). ACHIEVEMENTS & AWARDS

* College topper 2010-11, 2nd year with 73.5 % Certificate and Medal. * Member : Institution of Engineers.

INTERESTS

Water supply and Waste Water Treatment Project work. PERSONAL STRENGTHS

* Ability to adopt work in different condition, Self confident.

* Willing to learn new technology, Disciplined, Honesty and Integrity. PERSONAL PROFILE

Date of Birth : 01/12/1992

Marital Status : Single

Nationality : Indian

Known Languages : English, Hindi

REFERENCE

Harish Kumar Sir - "MEIL"

SR. Engineer

DECLARATION

I hereby declare that the above information is correct to the best of my knowledge.



Contact this candidate