Resume

Sign in

Engineer Manager

Location:
Bangalore, Karnataka, India
Salary:
6.36
Posted:
July 22, 2018

Contact this candidate

Resume:

M.Kalyankumar

Mail Id:

ac6c3t@r.postjobfree.com ac6c3t@r.postjobfree.com

Mobile No:

+91-827*******

Permanent Address:

Motte.Kalyankumar

s/o Basavaraj M,

1st block, Door no .2 police Quters Naubad Bidar,

Karnataka- 585401.

Personal Profile:

Name : M.Kalyan

Father : Basavaraj

Date of Birth : 01-06-1987

Age : 30

Sex : Male

Marital Status : married

Passport No : M0053392

Nationality : Indian

Exp CTC : Negotiable

Current Place : Karnataka

Notice period: One month

Language known:

To Speak : English, Kannada, Hindi, Telgu, Marathi

To Read & write : English, Kannada, Hindi

Mother Tongue : Kannada

TRAININGS ATTENDED:

First Aid training completed.

EHS&OHSAS training

Completed.

IMS training Completed .

WTG Res-Q training completed.

WTG Safety training completed.

Internal Auditor Training completed

Objective

Aim to be an associate within a progressive organization that gives me scope to update my knowledge and skills in accordance with the latest trends and be part of a team that dynamically works towards growth of organization and gains satisfaction.

Experience Summary: 6.11 year

Project execution, Project planning, Project scheduling _Wind turbine Installation engineer

Renew Power Wind Turbine Installation and Quality inspection or Auditor engineer from Third Party Burea veritas India Pvt ltd

ADANI Solar Store Manager from TUV NORD

OSTRO wind Project of Hybrid Machine at MP Site as Wind Turbine Installation and Quality inspection or Auditor engineer from Third Party TUV Nord India Pvt ltd

ACCIONA wind power Concrete tower manufacturing and Internal component Quality inspection or Auditor engineer and at Site tower Assembly from Third Party SGS India Pvt ltd

SUZLON wind Project of Hybrid Machine and Tubular at KA And AP Site as Wind Turbine Installation and Quality inspection or Auditor engineer from Third Party SGS India Pvt ltd

NDT Inspector of MT and PT,UT test at STAR Wire and other Different industries at Delhi NCR region

GE Machine 1.5 and 1.7 MW WTG Project at GADAG site from Bhoruka Power

O& M Station of wind hydro power as a Mechanical Head at site and local administration officer from bhoruka power

Professional Experience:

Renew Wind power 50MW Installation Site Quality inspector of turbine and rotor and blade inspection with material designation from Bureau Veritas .

Adani solar power project 20 MW as store manager and material quality inspector from TUV India Pvt Ltd

OSTRO Wind Project at Dewas site of 40MW project from TUV India Pvt ltd as third Party Installation Inspection Engineer of material Quality,assembly installation

Acciona Wind Power 78MW (3X26MW) Form TPI SGS Indi Pvt Ltd in wind manufacturing Plant-Tower Assembly and Internal Component Quality Inspection and wind energy Installation site (Mechanical and Civil and electrical, logistic etc Inspection )and Team 3MW X26 (78MW)wind power project coordinator and site material Quality inspection and installation engineer.

MT and PT testing at – Star wire India Pvt LTd- from third party BHEL – Steel Bars and rods, local inspection Visual inspection, etc With Reports,

Suzlon India Pvt Ltd from Third Party Quality Control & Project Execution,Installation engineer form SGS India Pvt Ltd for WIND HYBRID Tower of SUZLON Cient Project of Capacity of 42MW of HH 120Mtr ( 2.1X20MW) and Tubular Type of Project S11X,S9X, WTGS of 90 Mtr HH90 Mtr of 2.1 MW Capacity as a Installation and Quality inspection engineer and as site project coordinator to SGS and Client in TSG group (Lattice Structure assembly engineer with Tubular installation engineer) .

Project coordinator of site level and Project Planning,quality, Logistics at site level and as a Installation engineer GE Wind turbine projects of (1.5 MW X 17) 25.5 MW of HH 85 Mtr and (1.7MW X 25) 42.5 MW of HH 85 Mtr machines of power project .

Project Logistic and Loading and Unloading leader from site starting to ending and material tracking with receiving inspection document .

Preparation of Project Daily Reports,monthly reports,annual reports and plan schedule etc.

Operation and maintenace Engineer of ENERCON of 7.2 MW capcity grid 110/11kv s/s AND GE INDIA LTD, as a Break down and Shut down and Shechdlue matinanace engineer of WTG‘S of Tower,Nacelle HUB,rotor, Control panel,Bearing etc. and Wind station of 110/33kv of 25.5 MW and 110/33kv of 42.5 MW capacity Maintanace of DSB, HT line,LT line Relay testing,VCB breaker and Preparation of All O&M reports and Power Board Bills .etc

SCADA Operations and Report Anlysis and fault reset etc .

Safety Internal audior and HSE ands OSHAS and HIRA leader of safety commitey

Store Incharge of O&M station and Local Purchaser

Organization : Bhoruka power Corporation Ltd,

Client : GE India Pvt Ltd

Designation : Engineer Mechanical

1) Project 1 &2 :- Installation engineer from 10.10.2011 to 30.05.2013 Total 1.8 month(1.5X17 sle and 1.7 X1 ess).

2) Project 3: - Installation engineer Mechanical from 17.06.2015 to till Date (1.7 X25ess).

1) Site Installation engineer & material receiving lead .

2) Preparing crane pad of crawler & mobile crane pad for material offloading and erection works with co coordinating with civil team.

3)Preparing WTG erection plan as per actual schedule

4) Preparing turbine lifting sketch plan with contractor and review with manager.

5) Handling and deployment of work to contractor man power as per skill of person and inspection of work.

6) Conducting EHS & OHS plan at erection site.

7) Handling storage material with client for BOP for smooth erection activities.

8) long deck logistic inside site route planer with logistics persons and client route survey person .

9) Preparing Daily, monthly, yearly project progress report.

10 ) Inspection or observation of Mechanical completion report and coordinating with commissioning team for pre commissioning activities . etc

3) Operation & Maintains :- Engineer mechanical( maintenance ) from 01.06.2013 to 1.06.2015 Total 2 year

1) Engineer mechanical Operation & Maintenance of wind station service team.

2)SCADA,visupro operations

3) Electrical 33kv switch yard and pooling station Substation maintenance engineer

4) Forecasting & Analyzing of wind data And plotting graph of every 15 min & 24:00 hrs

5) Handling store for BOP of plant for improve plant efficiency and arrangement of Turbine material by coordinating with contractor for emergency break down operation discussing with Plant manager..

6) Site mechanical team lead .

7) Observation of Site Contractor maintenance work plan for AMW & SAMW work and communicating with site manager and arrange the plan for maintenance work .

8) Site Internal Auditor& EOHS & OHS work.

9) Preparing PA, WO and PAC indent And icrr report and site vehicle bill .

10) IMS work

11) B-form generation for every month with KPTCL engineers and finally submission in govt office .

STRENGTHS:

Creative thinking, Good strength in System Analysis

Self-starter & strong believer

Capable of working unsupervised as a part of team

Good Communication skill

Extensive knowledge in Wind turbine Installation, and Mechanical and Electrical substation operation and maintenance work.

Analytical and problem solving

Interest towards development ideas

Commitment to work and speed in achievement

.

EDUCATIONAL QUALIFICATION

NDT Level-2 Certified MT and PT from ASNT

Technical : Bachelor of Mechanical Engineering

in the Year 2011

Technical : Diploma in Mechanical Engineering

in Year 2007

Academic : SSLC in year 2002

DECLARATION

From my association with various organizations, I have learnt about the value of teamwork. I am looking forward to work in a challenging environment so as to further enhance my creative skills.

I hereby declare that the information given above is true and correct to best of my knowledge.

Place: Bijapur Signature

Date: 10/07/2018 (M.Kalyan)



Contact this candidate