CURRICULUM VITEA
FAHEEM MALIK
PIPING FEBRICATOR
Mobile: +966-*********
Email: (*************@*****.*********:*************@*******.***)
OBJECTIVE CAREER:
I am confident self-motivated ambitious and organized individual. I am ready to accept any challenges both individually and in a team. I am with a burning desire and huge self-confidant which is an impetus for achieving success in carrier growth keep in view my qualification knowledge experience and attitude. I am confident that I can fulfil any job assignment effectively and efficiently.
EXPERIENCE PROFILE:
Having 8years’ experience in Different Companiesin the field fabricationof Storage Tanks, pipe line and Structural works in various projects and other expertise of tankvessel and exchanger .
Marking, Cutting, Rolling of tank plate, Fabrication and Erecting as per Drawing.
EDUCATION PROFILE:
Matriculation (Science) from Bahawalpur Board 2010
Job History:
I HAVE WORKED EXPERIENCE AGAINST FOLLOWING PROJECTS & SHUTDAWN SO FAR:
EPIC(Private) LTD
Position:Fabricator
Date: 27 January 2005 to 14 march 2006
Client:Atock cement Pakistan LTD
Project: Boiler fabrication and reaction
Naseco Engineering Services
Position: Fabricator
Date : 18th December 2007 to 18th January 2008
Client: OMS
Project: 150t/h Biomass Boiler (BSPL) kasur
I KAN Engineering Services
Position: Fabricator
Date : 10th December 2009 to10 12 2010
Client : OMS
Project: 150t/h Biomass Boiler (BSPL) kasur.
DesconEngneering LTD
Position: Febricator
Date : 14th 04 2011 to 02 10 2012
Client : PRL (Pakistan Refinery Limited)
Project: 1149 Storage Tank(Pakistan Refinery Limited)
AKS Engneering services
Position: Piping Febricator
Date : 15th 03 2014 to 15th 09 2014
Project: Byco Oil Refinery Hub Co Baluchistan Pakistan.
MIS ARABIA COMPANY
POSITION FEBRICATOR
DATE 15-09-2015 TO 08-03-2016
PROJECT (FADHLI GAS PLANT)(PRESSURE VESSEL)
CLIENT PETROFEC
OLAYAN DESCON ENGINEERING COMPANY
POSITION FEBRICATOR
DATE 25-06-2016 TO 03-11-2016
PROJECT JIZAN PROJECT(PRESSURE VESSEL)
CLIENT TR
TSM ARABIA
POSITION FEBRICATOR
DATE 02-03-1-2017 TO 09-08-2017
PROJECT FADHLI GAS PLANT(PRESSURE VESSEL)
CLIENT PETROFEC
GULF ARABIA METAL FECTORY
POSITION FEBRICATOR
DATE 22-10-2017 TO 02-05-2018
PROJECT ALHASA CEMENT PLANT
Piping and Tank experties
Fabrication and installation of steam pipe line.
Fabricatio and erection of pipe support.
Marking of shell and Roof Nozzles, Cutting of shell Plate as per Drawing.and control of Tank Roundness,PlumpnessPeaking, Bending.
Coordination of Supervisor about progress.
Maximum target achieve without loss in short time.
Marking, Cutting, Rolling of tank plate, Fabrication and Erection as per Drawing.
Fabrication of Tank fabrication and erection such as Fixed roof tanks like Cone, Tanks as per API 650, API 620
Check the physical condition of anchor bolts and leveling of foundations before erection of equipment’s
Bottom Plate laying foundation.
Fit up of shell plate’s erection; Vertical and Horizontal joints, Nozzles, Stairs and platform..
Vacuum Box Test (VBT) of Bottom Plate Welds.
Oil Penetrates Test (OPT) of Bottom to Shell welds.
Pneumatic Leak Test (PLT) of reinforcement pads.
Peaking and banding inspection of Tank welds according to API 650.
Plumpness and Roundness of tan.
Getting the mechanical clearance for testing, commissioning of all tank.
Check equipment orientation before and after erection.
COMPUTER SKILL:
Ms World
Ms Excel
Inter net
PERSNAL DETAIL:
Father’s Name: Malik Muhammad Iqbal
Date of Birth: 09-05-1987
Iqama No: 239*******
Religion: Islam.
Nationality: Pakistani.
Marital Status: Bachelor
Passport no. PD1336921
DECLARATION
I HEAR BY DECLARE THAT ALL THE DETAILS MENTION ABOVE ARE TRUE TO MY KNOWLEDGE IF I AM APPOINTED FOR THE POST I ASSURE YOU THAT I WILL DO MY BEST FOR THE ORGANIZATION WELFARE.
THANKS & REGARDS
FAHEEM MALIK