Resume

Sign in

Engineering & Construction Director

Location:
Sunnyvale, California, United States
Posted:
September 22, 2018

Contact this candidate

Resume:

Updated: **-May-** Page * of **

TAREG M. JALUDI, PE 1319 Egret Drive

e-mail: ac642e@r.postjobfree.com Sunnyvale, CA 94087-3444 Tele: 408-***-****

OBJECTIVE To secure a challenging executive management position as Director/ Vice President overseeing the management and execution of engineering and construction projects and programs.

EXPERIENCE

SUMMARY

Over 30 years of experience in the planning, design and construction management of highway, light-rail, water, wastewater, buildings, land development, and public & private infrastructure projects, including large design-build projects. EMPLOYMENT HISTORY

7/2013 – Present JALUDI CONSTRUCTION MANAGEMENT

Amman, Jordan

Position: Owner & General Manager

Project and construction management of residential and commercial construction projects.

6/2011 – 6/2013 CDM International

Amman, Jordan

Position: Program Manager, Chief of Party

USAID Jordan Schools Construction Program

Responsible for overall program management, including construction management, furniture procurement, and program close-out of 28 new schools and 32 school extensions national-wide. Estimated construction program value of $175+ million. 11/2009 – 5/2011 CDM International

Amman, Jordan

Position: Construction Program Manager, Deputy Chief of Party USAID Jordan Schools Construction Program

Responsible for the construction management, supervision and contractor oversight of 28 new schools and 100 school extensions national-wide. Estimated construction program value of $200+ million.

3/2008 – 10/2009 JALUDI PROPERTIES

Amman, Jordan

Position: Owner & General Manager

Responsible for financing and overall management of the company specializing in development of multi-storey residential buildings, including land purchase; permit acquisitions; hiring architects and engineering consultants and overseeing design, hiring construction contractors and supervising construction work; and sales and marketing of residential units.

5/2007 – 2/2008 ARAB BANK PLC

Amman, Jordan

Position: Assistant Dept Manager, Premises & Projects Dept Responsible for the planning, establishment, budgeting and executive management of department-wide design & construction projects capital improvement program, including project management oversight, performance monitoring and measurement, quality control and contract management. Department capital projects program budget value of $250 million.

6/2006 – 4/2007 ARAB BANK PLC

Amman, Jordan

Position: Program Manager, New Image Branch Remodeling Program Responsible for managing the design and construction of approximately 130 national and international branch offices to reflect bank’s new branding image. Tareg M. Jaludi

Updated: 02-May-18 Page 2 of 10

Estimated construction program value of $100 million. 10/2005 – 5/2006 PARSONS INTERNATIONAL LIMITED

Abu Dhabi, United Arab Emirates

Position: Program Manager, Western Region Land Development Program Responsible for managing large-scale residential land developments at multiple project locations, including all infrastructure work (roads, water, sewer, power & telecom) and buildings (residential single-family units, apartment buildings, schools, community service complex, etc.) construction contracts, using both traditional design-bid-build and design-build project delivery methods. Managing preparation of in-house final construction document preparation for all infrastructure work, and preparation of design-build construction documents for all building construction work. Estimated construction program value of $700 million. 8/2003 – 9/2005 WASHINGTON INFRASTRUCTURE SERVICES INC. San Diego, CA

Position: Segment Design Manager, SR125 Tollroad Design-Build Project Responsible for managing, planning, scheduling, budgeting, cost estimating, coordination, implementation and performance of the engineering staff and engineering design activities on $300m design-build toll road project. 5/2001 – 7/2003 WASHINGTON INFRASTRUCTURE SERVICES INC. San Ramon, CA

Position: Senior Project Manager/ Deputy Director of Engineering, Transportation Design Group

Responsible for managing, planning, scheduling, budgeting, cost estimating, coordination, implementation and performance of the engineering staff and activities of assigned highway and bridge planning and design projects. 11/2000 – 4/2001 MARK THOMAS & Co.

San Jose, CA

Position: Division Manager, Transportation & Municipal Design Division Responsible for the performance of assigned contracts and duties, including estimating, negotiating and managing transportation projects in conformity to budget and profit goals of the company.

4/1993 –10/2000 SANTA CLARA VALLEY WATER DISTRICT

San Jose, CA

Position: Project Manager, Facilities Planning & Design Unit Performed project management and civil engineering work in the planning, design, preparation of construction plans, specifications, cost estimates, and construction support for various water supply and flood management projects including:

Transmission Pipelines Water Treatment Plants Dams

Flood Control Facilities Operations & Maintenance Facilities 4/1990 - 3/1993 PARSONS BRINCKERHOFF QUADE & DOUGLAS, INC. San Jose, CA

Position: Project Engineer, Highway Design Group

Prepared CADD generated contract drawings, cost estimates, CPM schedules, and feasibility study report on major highway, tunnel, and interchange projects. Other design related experience included:

Utility Design & Relocation R/W Determination Field Surveying

Retaining/Sound Wall Design Cost Estimating Drainage Design 7/1989 - 3/1990 CALIFORNIA DEPARTMENT OF TRANSPORTATION Mountain View, CA

Position: Assistant Resident Engineer, Division of Structures, Construction Branch

Areas of Responsibility included:

Tareg M. Jaludi

Updated: 02-May-18 Page 3 of 10

Contract Administration Construction Inspection & Quality Control

Quantity Calculations Quantity Take-off and Surveying

Contractor Activity Coordination Preparation of Progress Pay Estimates 9/1988 - 5/1989 UNIVERSITY OF CALIFORNIA, BERKELEY, DEPT OF CIVIL ENGINEERING Berkeley, CA

Position: Teaching Assistant in Surveying Courses

Instructed students on the use of surveying equipment, preparation of field notes & calculations, supervised field crews & corrected field & class work assignments. 6/1988 - 8/1988 U.S. DEPARTMENT OF STATE, OFFICE OF FOREIGN BUILDINGS Manama, Bahrain

Position: Construction Engineer

Worked on new US embassy building & acquired experience in the following areas:

Checking shop drawings Contract terms, conditions and specifications

Concrete & rebar inspection Work progress monitoring and reporting 1/1988 - 5/1988 UNIVERSITY OF ILLINOIS, URBANA, DEPT OF CIVIL ENGINEERING Urbana, IL

Position: Research Assistant

Conducted specialized in-depth research and analysis of technical papers and computer programs in the area of pavement analysis and design in support of federal and state research and development programs. 7/1986 - 9/1986 GENERAL DIRECTORATE OF HIGHWAYS

Ankara, Turkey

Position: Construction Engineer

Involved in the following activities:

Construction of roads, highways, bridges, viaducts and culverts.

Laboratory and field testing of soil and road construction materials. EDUCATION

5/1989 Master of Science, Civil Engineering

Construction Engineering and Management

University of California, Berkeley

6/1987 Bachelor of Science, Civil Engineering

Structural Engineering Emphasis

University of Jordan, Amman

PROFESSIONAL

AFFILIATIONS

Registered Professional Engineer in the State of California

Registered Member of the Jordan Engineering Association

Member of the American Society of Civil Engineers SPECIAL SKILLS

& TRAINING

FIDIC International Contracts Proficiency and Certified Training

Trained in advanced project management and organizational skills.

Proficient with CPM scheduling including Primavera Suretrak & MS Project.

Versed in most common office software applications.

Effective communicator, both verbal & writing skills at all levels, from clerical to senior management.

Tareg M. Jaludi PROJECTS PORTFOLIO

Updated: 02-May-18 Page 4 of 10

LAND & PROPERTY DEVELOPMENT

Multi-storey Residential Complex; Um Uthaina District, Amman, Jordan. Construction Manager of multi-unit residential building in west Amman. Responsible for running the business including: hiring design consultants, construction contractors and subcontractors, material suppliers, accountants, and site supervisors; construction management; financial management, accounting and book-keeping; and maintenance service management.

Estimated construction value of $1.6 million.

Multi-storey Residential Complex; Jendaweel District, Amman, Jordan. Developer of multi-unit residential building in west Amman. Responsible for running the business including: hiring design consultants, construction contractors and subcontractors, material suppliers, accountants, and site supervisors; construction management; financial management, accounting and book-keeping; managing the marketing and sales of residential units; and after-sales and maintenance service management. Estimated construction value of $1.1 million.

Western Region Development Program – Zayed City Subdivision Project: Abu Dhabi, UAE Overall Program Manager on this 360 Hectare new residential development site responsible for managing the final detailed design and construction management of all infrastructure work (roads, water, sewer, power and telecom) and managing design-build contract document preparation and construction management of all building construction work (675 single-family residential units, 25 apartment buildings, 4 schools, 3 mosques, community service complex, public park, etc.). Estimated construction value of $400 million.

Western Region Development Program – Ghayathi City Subdivision Project: Abu Dhabi, UAE Overall Program Manager on this 300 Hectare new residential development site responsible for managing the final detailed design and construction management of all infrastructure work (roads, water, sewer, power and telecom) and managing design-build contract document preparation and construction management of all building construction work (single-family residential units, apartment buildings, schools, mosques, community service complex, public park, etc.). Estimated construction value of $300 million.

Tareg M. Jaludi PROJECTS PORTFOLIO

Updated: 02-May-18 Page 5 of 10

TRANSPORTATION

SR-125 Tollroad Design-Build Project; San Diego, California. Segment Design Manager on a 14-km

(9-mile), 4-6 lane divided design-build toll road project. Manager on two major design segments, responsible for overall segment design management including budget control and schedule, discipline design management; oversight of final PS&E design, construction plan preparation and design reports, including traffic studies, noise/sound wall study, and aesthetics report in support of final design. Major project segment features consisted of the 8.5 km of 4-lane divided roadway, 5 interchanges, 6 undercrossing bridge structures, 2 overcrossing structures, 9 retaining walls and 3 sound walls. Estimated construction value of $270 million.

I-680 Auxiliary Lanes; San Ramon and Danville, California. Project Manager on this highway planning project, responsible for overall project management including budget control and schedule, preliminary engineering work, preparation of Caltrans Project Report and overseeing the preparation of environmental studies and public review in support of CEQA/NEPA document. Major project features consisted of the widening of 5.0 miles of existing 8-lane freeway to accommodate additional auxiliary lanes between 4 interchanges, interchange ramp widening, on-ramp metering, one bridge widening, 3800 lf of sound walls and 2400 lf of retaining walls.

Estimated construction value of $37 million.

Fruitvale Ave. Bridge Lifeline Seismic Retrofit; Alameda, California. Project Manager on this bridge seismic retrofit project, responsible for the preliminary engineering, cost estimating, coordination of environmental review and preparation of a Project Study Report, in addition to project management responsibilities. Project consisted of the upgrading of an existing bascule bridge beyond the normal “no- collapse” seismic retrofit to lifeline level which would ensure the continued operation of this bridge after a major earthquake. Major work elements for this 135-ft single leaf bascule span over the Oakland Estuary included reconstruction of trunnion column supports and pinion gears, counterweight restraint, steel casing of marine column supports and footing retrofit, relocation of bridge operator house, necessary no-collapse seismic retrofit of adjacent vertical-lift railroad bridge, and requirements to maintain vehicle and marine traffic during construction.

Estimated construction value of $12 million.

West Lane Grade Separation; Stockton, California. Project Manager on this roadway/railroad crossing project, responsible for overall project management including budget control and schedule, preliminary engineering, alternative analysis, cost estimating, feasibility study, oversight of traffic analysis subconsultant, public outreach efforts and provided support services for CEQA environmental studies. Project consisted of the conversion of an at-grade intersection of a 4-lane arterial road with a double track railroad crossing to either an under or overcrossing roadway bridge structure. Project involved the relocation of businesses, new frontage roads, utilities relocation and signalized intersection modifications. Estimated construction value of $29 million.

Vasona Light Rail – Segment 1; San Jose, California. Project Manager on this light rail project, responsible for overall project management including budget control and schedule, detailed engineering design of civil work, oversight of electrical, traffic, signal, drainage and landscaping subconsultants, and preparation of construction plans, specifications and cost estimate. Project consisted of 1.1 miles of new light rail corridor, bridge creek crossing, highway offramp relocation, retaining walls, existing bridge widening, LRT station foundations, and construction staging and interfacing with existing LRT operations in downtown San Jose.

Estimated construction value of $12 million.

Montague Expressway Widening; Santa Clara and San Jose, California. Project Manager on this major expressway widening project, responsible for overall project management including budget control and schedule, preliminary engineering work, oversight of traffic analysis subconsultant, and provided support services for CEQA environmental studies. Project consisted of widening of 6.6 miles of existing expressway from 6 lanes to 8 lanes, widening of 2 interchange overcrossing bridge structures, widening of one creek bridge structure, and numerous intersection reconfigurations. Estimated construction value of $50 million.

Tareg M. Jaludi PROJECTS PORTFOLIO

Updated: 02-May-18 Page 6 of 10

Deadwood Tunnels; South Dakota. Project Design Engineer on this highway tunnel project, responsible for preparation of feasibility report and conceptual plans including alternative alignments, cross sections, drainage and cost estimates. Coordinated design of mechanical, electrical, geotechnical and control systems aspects of the project. Project consisted of 2000 ft and 900 ft long single and double bore tunnels in the Black Hills of South Dakota.

Estimated construction value of $14 million.

State Route 120 Oakdale Bypass; Oakdale, California. Project Design Engineer on this new highway planning project, responsible for preparation of Engineer's Report including design criteria, geometric alignment design, cost estimates and plans; assisted in the preparation of the Environmental Impact Report; performed field route surveying as chief surveyor. Project included 1.4 million cy of excavation, 12 miles of 4-lane freeway, nine bridges, sound walls and retaining walls. Estimated construction value of $70 million.

State Route 85 Improvements; Los Gatos, California. Project Design Engineer on this highway design project, responsible for preparation of construction plans and specifications including geometric alignments, CAD design, excavation quantities, cost estimates, retaining and sound wall design, utility relocations and grading plans. Project included 960,000 cy of excavation, 26000 lf of sound walls, 4000 lf of retaining walls, six miles of asphalt and concrete pavement. Estimated construction value of $35 million.

Riverside Avenue Bridge Removal; Santa Cruz, California. Site Construction Engineer on this bridge demolition project, responsible for field inspections and supervising contractor's operation. Project included the removal of a cast-in-place 500-ft three-span bridge over a river including submerged foundations.

Estimated construction value of $553,000 million.

State Route 85 Widening; Mountain View, California. Assistant Resident Engineer on this highway construction project, responsible for both office and field construction administration and inspection duties. Project included three bridge overcrossings, interchanges, 25,000 lf of sound walls, 7 miles of PCC pavement, underdrain and storm drain systems.

Estimated construction value of $12 million.

Tareg M. Jaludi PROJECTS PORTFOLIO

Updated: 02-May-18 Page 7 of 10

WATER RESOURCES

Adobe Creek Improvements, Foothill College to Rhus Ridge; Los Altos Hills, California. Project Manager on this flood control and erosion protection project, responsible for overall project management including budgeting project design and construction costs; labor resource allocation; preparation of project schedules and regular status reports; conducting project meetings with customers and other stakeholders; selected and administered design consultant contract; reviewing and directing design process including the preparation of construction plans and specifications; providing construction engineering support services; and performing other project management functions. Project included reconstruction of approximately 1300 ft of creek channel with gabion-lined banks, rock riprap invert, vegetated high-flow benches, maintenance access ramps, drop structures, installation of 0.6 acres of high-quality riparian habitat revegetation, parking lot reconstruction, and concrete weir structure. Estimated construction value of $3 million.

Adobe Creek Improvements, Burke Road to Hwy 280; Los Altos, California. Project Manager on this flood control and erosion protection project, responsible for overall project management including budgeting project design and construction costs; labor resource allocation; preparation of project schedules and regular status reports; conducting project meetings with customers and other stakeholders; selected and administered design consultant contract; reviewing and directing design process including the preparation of construction plans and specifications; providing construction engineering support services; and performing other project management functions. Project included replacement of an existing bridge at Burke Road with a new 24-foot-wide bridge; replacement of the existing culvert at O’Keefe Lane with a new 15-foot-wide by 11-foot-deep concrete box culvert; reconstruction of upstream and downstream transition structures with gabion-lined channel sides and rock riprap inverts. Estimated construction value of $2 million.

Adobe Creek Improvements, El Camino Real to Foothill Expressway; Los Altos, California. Project Manager on this flood control and erosion protection project, responsible for overall project management including budgeting project design and construction costs; labor resource allocation; preparation of project schedules and regular status reports; conducting project meetings with customers and other stakeholders; selected and administered design consultant contract; reviewing and directing design process including the preparation of construction plans and specifications; providing construction engineering support services; and performing other project management functions. Project included replacement of the existing culvert with a new 20-foot-wide by 12-foot-high concrete box culvert, construction staging and utility relocations, installation of an additional 12-foot-wide by 12-foot-high concrete box culvert under Foothill Expressway adjacent to the existing culvert, repair of 13 bank erosion sites using rock or sacked concrete or gabion or geocell slope protection and associated revegetation, and installation of 1.1 acres of high-quality riparian habitat revegetation.

Estimated construction value of $4.5 million.

Santa Clara Tunnel Landslide Repair; Hollister, California. Project Manager on this $1.2 million tunnel portal slide rehabilitation project, responsible for overall project management including budgeting project design and construction costs; labor resource allocation; preparation of project schedules and regular status reports; conducting project meetings with customers and other stakeholders; administering design consultant contract; reviewing and directing design process including the preparation of construction plans and specifications; providing construction engineering support services; and performing other project management functions. Project included a 75ft-long concrete pier wall consisting of 15, 50ft-deep cast-in- place drilled caissons, inclinometer installations, excavation and disposal of 40,000 yd3 of soil, installation of 2,600 lf of concrete-lined drainage swales, and reinforced soil buttress embankment construction. Estimated construction value of $12 million.

Rinconada Water Treatment Plant, Sludge Drying Beds Restoration; Los Gatos, California. Project Manager/Engineer on this treatment facility restoration project, responsible for budgeting project design and construction costs; labor resource allocation; preparation of project schedules and regular status reports; conducting project meetings with customers and other stakeholders; supervising project staff including engineering technicians, specifications writers and construction inspectors; prepared and certified construction plans and specifications; and performed all project engineer functions. Project included Tareg M. Jaludi PROJECTS PORTFOLIO

Updated: 02-May-18 Page 8 of 10

51,000 ft2 of asphalt overlay, pump sump structure, over 500 lf of drainage piping, telescopic and plug valves, and other miscellaneous improvements.

Estimated construction value of $214,000.

Uvas Dam Seepage Mitigation Project; Watsonville, California. Project Manager on this dam rehabilitation project, responsible for design consultant selection; negotiated consultant agreements; reviewed and approved project deliverables; reviewed and approved invoices; budgeted project planning, design and construction costs; prepared project schedules and regular status reports; arranged project meetings and coordinated project issues with regulatory agencies; supervised project staff including consultants, specifications writers and construction resident engineer and inspectors. Project included 100-ft long by 100-ft deep double row pressure grout curtain. Estimated construction value of $587,000.

Penitencia Water Treatment Plant, Sludge Drying Beds Restoration; San Jose, California. Project Design Engineer on this treatment facility restoration project, responsible for site investigations and determined design criteria; prepared engineering design, construction plans, specifications and cost estimates; provided construction support and reviewed contractor submittals. Project included 30,000 ft2 of reinforced asphalt overlay, 180 lf of concrete divider walls, steel catwalk structure, waterline and hydrants. Estimated construction value of $192,000.

Uvas-Llagas Transfer Pipeline Modifications; Watsonville, California. Project Design Engineer on this water-supply pipeline project, responsible for site investigations and determined design criteria; prepared engineering design, construction plans and specifications and cost estimates; provided construction support and reviewed contractor submittals. Project included 12", 20" and 30"-diameter steel pipe, butterfly and air release valves, reinforced concrete pipe, precast concrete vaults. Estimated construction value of $96,000.

Rinconada Force Main Relocation at State Route 85; Los Gatos, California. Project Design Engineer on this water-supply pipeline project, responsible for preparation of engineering designs and calculations, CAD design and drafting, site plans and utility relocation. Project included 450 lf of 72”-diameter steel pressure pipe with concrete encasement, air release valves, concrete vaults and telemetry cables. Estimated construction value of $630,000.

Tareg M. Jaludi PROJECTS PORTFOLIO

Updated: 02-May-18 Page 9 of 10

BUILDINGS & FACILITIES ENGINEERING

New School Buildings and School Extensions; Amman, Jordan. Program and Construction Manager responsible for the overall program management, design management, furniture procurement, construction management, supervision and contractor oversight of 28 new schools and 100 school extensions national- wide, with a construction supervision staff of over 24 personnel. Estimated construction value of $200 million.

New Image Branch Remodeling Program; Jordan - Nation-wide. Program Manager responsible for managing the design and construction of approximately 130 national and international branch offices to reflect bank’s new branding image. Estimated construction program value of $100 million. Maintenance Corporation Yard Consolidation; San Jose, California. Project Manager on this O&M facilities upgrade project, responsible for budgeting design and construction costs; labor resource allocation; preparation of project schedules and regular status reports; arranged project meetings with customers and other stakeholders; coordinated and secured city and regulatory permits; administered design consultant contract; reviewed and directed design process including the preparation of the engineer’/architect’s report; performed other project management functions. Project consisted of the consolidation of the District’s two corporation yards which involved building upgrades for the central warehouse, fleet maintenance facility, field maintenance facility, garages, storage & shop areas; fence & security system installations; site access & traffic improvements; and construction of a pedestrian bridge. Estimated construction value of $5 million.

Water District Headquarters Educational Display Center; San Jose, California. Project Manager on this public information facility, responsible for budgeting design and construction costs; labor resource allocation; preparation of project schedules and regular status reports; arranged project meetings with customers and other stakeholders; hired, negotiated and administered design-build contract; reviewed and directed design process including the determination of design exhibit elements/concepts and preparation of schematic drawings; performed other project management functions. Project consisted of the planning, design, fabrication and installation of static exhibits and interactive displays and the interior design for an indoor educational center and an outdoor campus trail. Estimated construction value of $495,000.

Blossom Hill Annex Driveway Widening/Almaden Expressway Restriping and Switchyard Screen Wall; San Jose, California. Project Manager on this water district headquarters campus project, responsible for budgeting project design and construction costs; labor resource allocation; preparation of project schedules and regular status reports; arranged project meetings with customers and other stakeholders; prepared detailed design including the preparation of construction plans, specifications and engineer’s construction cost estimate; performed other project management functions. Project involved the demolition and replacement of asphalt pavements and concrete sidewalks; traffic signal installation; slurry seal, striping and marking of roadways; and precast concrete wall construction. Estimated construction value of $166,000.

Penitencia Water Treatment Plant, Landscaping and Erosion Mitigation; San Jose, California. Project Manager on this treatment facility enhancement project, responsible for budgeting project design and construction costs; labor resource allocation; preparation of project schedules and regular status reports; arranged project meetings with customers and other stakeholders; hired, negotiated and administered design consultant contract; reviewed and directed design process including the preparation of construction plans and specifications; provided all construction engineering support services; performed other project management functions. Project included installation of approx. 200 trees, 500 shrubs, complete irrigation system, erosion control, 6,200lf of rock-lined drainage swales, and earthwork regrading. Estimated construction value of $395,000.

Almaden Maintenance Yard Pavement Rehabilitation; San Jose, California. Project Manager/Engineer on this O&M facility pavement rehabilitation project, responsible for budgeting project design and construction costs; labor resource allocation; preparation of project schedules and regular status reports; arranged project meetings; supervised project staff including surveyors, engineering technicians, Tareg M. Jaludi PROJECTS PORTFOLIO

Updated: 02-May-18 Page 10 of 10

specifications writers and construction inspectors; prepared and certified construction plans and specifications; performed all project engineer functions. Project included 50,000 ft2 of asphalt overlay, 11,000 ft2 of asphalt pavement, 12,000 ft2 of concrete pavement, oil separator and drainage piping, and



Contact this candidate